ML19209B732
| ML19209B732 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/05/1979 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Gammill W Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910100369 | |
| Download: ML19209B732 (1) | |
Text
Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 323-5341 side'nt AlabamaPower
'e o c the southen erectre system October 5, 1979 Docket No. 50-348 Mr. William Gammill, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Gammill:
RE: Adequacy of Station Electric Distribution Systems Voltages Your letter dated August 8, 1979 on this subject requested that a detailed review of the electric power systems at Farley Nuclear Plant be conducted and a copy of the analysis be provided to the NRC within sixty (60) days of the date of your letter.
The review is in progress but due to the magnitude of the efforts involved it cannot be cc.npleted and provided to the NRC until November 8, 1979.
Yours very truly, 1
+.
.g K,*')Clayton, Jr.
a bxys-F. L.
FLCJr/TNE:bhj cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge 1138.117 J
\\D 7910 @ 0 } &
10 g