LER 78-054/01T-0 on 781213:during Routine Trip Recovery, Reactor Was Made Critical,But Shift Supervisor Recalled That No 11 Component Cooling Heat Exchanger Was Out of Svc & the Saltwater Subsys Partly Drained,So Reactor Was Shut Down
ML19270E897
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 12/27/1978
From: Carroll J
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML19270E895 List:
References
LER-78-054-01T, LER-78-54-1T, NUDOCS 7901030111
Download: ML19270E897 (2)


Text

NRC FORM 366 U. S. NUCLEAR REGULATORY COMMISSION (71 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION) 7 0 i 8 9 Ml Dl Cl Cl Nl 1l@l 0 l 0 l -l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l l j 1 l 1l@l LICENSEE CODE to 15 LICENSE NUMBER 2$ 26 LICENSE TYPE JO l

57 CAT 68 lg CON'T 7

o 1 8

"'E l ll@l 0 60 61 5 ] DOCKET 0 l 0 NUM8ER l 0 l 3 l l l 768 l@l 69 l l 2EVENT l l lDATE 3 l 718 )@].11 212 74 75 l 7 l 7 l 880 l@

REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O 2 l During a routine trip recovery the reactor was made critical at 0552. At [

O 3 [ 0610 the Shift Supervisor recded that 11 component cooling heat exchanger l g l was out of service and 11 saltwater sub-system was partially drained, there- l 0 s I by invoking action statements of T.S.3.7.3.1 and T.S.3.7.5.1. The reactor l 0 s l was shutdown at 0615. Maximum power level achieved durino this event was Oi7 l10-4% This is not a repetitive occurrence. I O a l I 7 8 9 80 0E OE s 8C E COMPONENT CODE suBCODE su E O 9 l Zl Zl@ l Al@ l A l@ [Z l Z l Z l Z l Z l Z l@ l Zl(g l Zl @

7 8 9 to 11 12 13 18 19 20

_ SEQUENTIAL OCCUR RE NCE REPORT REVislON LER EVENT YEAR REPORT NO. CODE TYPE N O.

@ ,aeg/RO y 7 18 l-l 101514j I/l 10 11 l l Tj L--J 10 1 21 22 23 24 1 27 28 29 30 31 32 7K N AC ONP NT M HOURS 22 sB i D FOR B. SUPPL ER MANUFAC RER

[Hj@lHl@

33 34 lCl@

35 lAl@

36 l 0 l0 l 016 l 37 40 W@

41 l42N l@ l43Z l@ l44Z 19 l919 l@as CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i O l This event was caused by failure of licensed oersonnel to verify that the l LU_U l component cooling and saltwater systems were not in a dearaded condition i g l prior to taking the reactor critical . (See attached).

LU.2J I i 4 l

'sT2EY seOwER OTwER status @ "'Eev50v' i oisCOvERY oEsCmntON @

g l Cl@ l0 0l0l@l NA l lZ[@l NA l ,

' ' " " 8 A!TiviTY CSTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA l l NA Fits '1 'LZJ @ LZJ@

l nRsON~EL Ex,0ssEs g l 0l 0l 0l@l Zl@loEsCRiniO~ @

~UM8E R Tvn NA l

' nRso~~d',N;uLs " *

~ uM8 E R oEsCRi, TION @ NA

[TTR 7 8 9 1 10101 Ol@l 11 12 l

80

" ^

T E ' U ^"R ? TON '' " @

1 9 NA l Zl@l l 7 0103oi0 PU8LI TY DESCRIPTION 45 NRC Use o~LY iss

  • L2_LOJ l TD@l l NA l llll lllIIIIIl}

7 8 9 to 68 69 80 S

~

NAME OF PREPARER PHONE:

ATTACHMENT TO:

REPORT NO. 78-54/1T DOCKET NO. 50-317 EVENT DATE 12/13/78 REPORT DATE 12/27/78 CORRECTIVE ACTION TO PREVENT RECURRENCE:

Each of the three licensed personnel involved in this incident will be eersonally counseled by the Nuclear Plant Engineer - Operations regarding the importance of strict adherence to the Technical Specifi-cations. Additionally, a change has been made to the " Scram Recovery" procedure to provide an action statement checklist which must be resolved prior to entering Mode 1 operation.