Monthly Operating Rept for June 1976
ML19317E553
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/09/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E546 List:
References
NUDOCS 7912180774
Download: ML19317E553 (3)


Text

_ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ -

UNIT Oconu Unit 3 y

p DATE 7/9/76 50.-287 V DOCKET NO.

PREPARED BY E. D. Blakeman OPERATING STATUS

1. REPORTING PERIOD: June 1 THROUGH June 30, 1976 GROSS HOURS IN REPORTING PERIOD: 720.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Nat) None
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 720.0 3477.2 10621.5
6. - -

REACTOR RESERVE SHUTDOWN HOURS

7. HOURS GENERATOR ON-LINE 720.0 3444.6 10393.3
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)1841499 8252928 2'4170978
10. GROSS ELECTRICAL ENERGY GENERATED (mm) 639600 2847240 8292154
11. NET ELECTRICAL ENERGY GENERATED (mm) 613377 2719856 7898290
12. REACTOR SERVICE FACTOR 100.0 79.6 78.6
13. REACTOR AVAILABILITY FACTOR 100.0 79.0 80.5
14. UNIT SERVICE FACTOR 100.0 78.9 76.9
15. UNIT AVAILABILITY FACTOR 100.0 78.9 76.9
16. UNIT CAPACITY FACTOR (Using Net 97.8 71.5 67.1 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 96.0 70.2 65.9'
18. UNIT FORCED OUTAGE RATE O 21.1 14.8
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

September 1,1976 - Refueling (5 weeks)

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT,X 100

!!OURS IN REPORTING PERIOD .

REACTOR AVAIIABILI1Y FACTOR = HOT!itS REACTOR WAS. _AVAILiril.E TO _0PERATE X 100 HOURS IN REPORTING PERICO UNIT SERVICE PACT 0" = HOUPS CD:ERATOR ON 1.TNE l

' HOURS IN REPORIING PERIOD 'X 300 UNIT AVAILABILITY FACTOR = 110tRS tiNTT WAS A"A11 ADI.E TO CC:ERATE X 100 HOURS IN REPORTING t'E1110D UNIT CAPACITY FACTCR = (N.NET ELECTRICAL POWER CT.Nf). eft,co9.

t C.spatillity or Design (Le-MdB X HOUiw LN M*:lW'tNC s.

PERIOD UNIT FGRCZD OUTACE RAIE - FORCED OUTAGE HOURS -

H0l'RS GENEPaTOR ON I INE + FORCED CUTAGE HOUR

D CKET NO. 50-287 UNIT N AMii Oconee Unit 3 UNIT SHUTDOWNS ,

DATli 7/9/76 .

June, 1976 REPORT MONTil TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) RE ASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS /

(1) REASON (2) METilOD A -EQUIPMENT l- AILURE (EXPLAIN) 1-MANUAL B-MAINT OR TEST. 2-MANUAL C- RLi'ULLING SCRAM D-REGULATORY RESTRICIlON 3- AUTOM ATIC E-OPERATOR TRAINING AND SCRAM

! LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (LXPLAIN)

it -OlllL R (EXPLAIN)

SUMMARY

No outages this month.

. DOCKET NO. 50-287 UNIT oc nee Unit 3 DATE 7/9/76 AVERAGE DAILY UNIT POWER LEVEL MONTil June. 1976 AVERAGE D AILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net) .

DAY (MWe-net) 17 854 1 853 _

858 2 859 18 856 857 19 3

856 854 4 20 858 21 853 5

858 22 854 6

858 23 857 7

857 859 8 24 845 858 9 25

' 856 26 854 10 ._

855 849 11 21 856 28 838 12 858 29 850 13 844 858 30 14 15 847 31 790 16 DAILY UNIT POWER LEVEL FORM INST'RU(~TIONS On this form, list the average daily unit power leve! in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt. ,

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .neasions when the daily average power level exceeds the 100'l6 line (or the restricted power lesel line). In such cases, the ,

averare daily unit power output sheet should be footnoted to explain the apparent anomaly.

l l

.