ML20006C059

From kanterella
Revision as of 02:03, 29 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Proposed Tech Specs 3/4.4.7,3/4.6.3,3/4.6.4.2 & Definition 1.29 Re Main Steam Isolation Valves,Primary Containment Isolation Valves,Reactor Bldg to Suppression Chamber Vacuum Breakers & Primary Containment Integrity,Respectively
ML20006C059
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/26/1990
From:
DETROIT EDISON CO.
To:
Shared Package
ML20006C056 List:
References
NUDOCS 9002060251
Download: ML20006C059 (6)


Text

n -- :7v i 4

., ., . ~-

s i

i.

I.

r I

j 6.

!l o

l PROPOSED CHANGES I

0 f 9002060251 900126 PDR ADOCK 05000341 PDC ,

P

'.' ININITIONS 2.

blank flange, or Cleted by at least one annual valve,in its clo6ed petition, deactivated automatic valve secuted except as provided in Table 3.6.31 ef $pecification 3.6.3.

b. All primary containment equipment hatches are closed and saaled.
c. Each primary containment air lock is in compliance with the requirements of $pecification 3.6.1.3.
d. The primary containment leakage rates are within the limits of Specification 1.6.1.2.
e. The suppression chamber is in compliance with the requirement of

. Specification 3.6.2.1.

f. The sealing mechanism associated with each primary containment penetration, e.g. , welds, bellows, or 0-rings, is OPERABLE., olve saft _
g. The suppression chamber to reactor building vacuum breakergare'in compliance with Specification 3.6.4.2.

THE PROCESS CONTROL PROGRAM

- 1.30 The PROCESS CONTROL PROGRAM (PCP) shall contain the provisions to assure that the $0LIDIFICAT10N of wet radioactive wastes results in a waste form with properties that meet the requirements of 10 CFR Part 61 and of low-level radioactive waste disposal sites. The PCP shall identify process parameters influencing $0L101FICATION such as pH, oil content, H.,0 content,solidscontent,ratioofsolidifIcationagenttowaste ahd/or necessary additives for each type of anticipated waste, and the acceptable boundary conditions for the process parameters shall be identified for each waste type, based on laboratory scale and full scale testing or experience. The PCP shall also include an identification of conditions that must be satisfied, based on full scale testing, to assure that dewatering of bead resins, powered resins, and filter sludges will at the time of disposal, within the result in volumes of free water, low-level radioactive waste disposal limits of 10 CFR Part 61 and of sites.

PURGE - PURGING 1.31 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is required to purify the confinement.

RATED THERMAL POWER 1,32 RATED THERMAL POWER shall be a total reactor core beat transfer rate to the reactor coolant of 3293 EIT. l 15 Amendment No. 42 FERMI - UNIT 2 I I -,Il1 ll l

i l

n' I I

n.

R[ ACTOR Cv3LANT $YSTEM f

l 3/4.4.7 MAIN STEAM LINE ISOLATION VALVES l i

i LIMITING CONDITION FOR OPERATION 3.4.7 Two main steam line isolation valves (MSIVs) per main steam line shall  !

be OPERABLE with closing times greater than or equal to 3 seconds and less <

l than or eque'l to 5 seconds. l j

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

. ACTION: ,

l

s. With one or more MSIVs inoperable: $
1. Maintain at least one MSIV OPERAI 'n each affected main steam .

line that is open and within ours, either: l a) Restore the inoperable valve (s) to OPERABLE status, or b) Isola *.e the affected main steam line by use of a deactivated MSIV in the closed position.

Otherwise, be in at least HOT SHUTDOWN vithin the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />  !

2.

and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. The provisions of Specification 3.0.4 are not applicable.

SURVE!LLANCE REQUIREMENTS 4.4.7 Each of the above required MSIVs shall be demonstrated OPERABLE by  :

verifyir.g full closure between 3 and 5 seconds when tested pursuant to

- Specification 4.0.5.

FERMI - UNIT 2 3/4 4-24

~.

$0NTA189ENT MATEMS S/4.6.3 PRIMARY CONTAINMENT 180LAT10N VALVES L141 TING * *1710N FOR OPERATION .

3.6.3 The peleary containment toelation valves and the reactor instementation line excess flew check valves shown in Table 3.6.>1 shall be OptRABLE with isolation times less than or equal to those shown in Table 3.6. b l.

APPLICABILITY: OPERATIONAL CONDIT10N5 1, t, and 3.

ET19N:

a. With one er more of the pelgry sentainment isolation valves shown in Table 3.6.k1 inoper blF," attin at least one isoletten valve OPERABLE in each affecte ration that is open and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:
1. Restore the inoperable valvs(s) to OPitABLE status, or
2. Isolate each effected penetration by use of at least one ee-activated automatic valve secured in the isolated position,* or
3. Isolate each affected penetration by'ese of at least one locked closed manual valve er blank flange.

Othenvise, be in at loost NOT $NUTDOWN within the nemt 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD $ NUT 00WN within the fellewing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

b. With ene or more of the reactor instementation line excess flow check valves shown in Table 3.6.b1 inoperable, operation may sentinue and the previsions of Specifications 3.0.3 and 3.0.4 are not applicable provised that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:
1. The inoperable valve is returned to OptRABLE status, or
2. The instrument line is isolated and the associated instrument is declared inoperable.

Otherwise. be in at least NOT SMUT 00WN within the neat 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ad in COLD $ NUT 00WN within the following to hours.

alsolation valves closed to satisfy these requirements may be m opened on an intemittent basis under administrative sentrol.

  1. # This ACn0Nslatement is et appliedle. $r inepsmile Reader Bdidhf

+v suppressien chambee vacum bmkte ekn.t valves (T25-F150A wd

6) or usolaboh valves (ris-F404 asdT23-FMio). Fol)ctu the e gei odle. h@M shkment of' Speci%Ren 5.c.9.2. ;g any og n{pl-vaIws becm e topen ble.

FERMI - UNIT 2 3/4 6*20 l

' i e  ;

C,,0NTAINMENT SYSTEMS SgE INSERT 3.6.4,Z,  ;

REACTOR BUILDING - SUPPRESSION CHAMBER VACUUM BREAKERS LIMITING CONDITION FOR OPERATION

\

^ - -^^^'^^ " " - ^^^^ ~^ '-^^'^^" "'"' -

  • ^^^^^^^ * " ^^

3.6.4.2

  • O h!" ^ * ' f "o :' : d.

APPLICABILITY: OPERATin e CONDITIONS 1, 2, and 3.

ACTION: hivt saf]

WithoneReactorBuilding-suppressionchambervacuumbreakerVo/vt Sei

a. i inoperable for pening but known to be closed, restore the inoperable  !

vacuum breaker to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least l HOT $HUTDOWN w thin the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO $HUTDOWN within l

  • the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

"' th : : ".:::ter ";f!df ;  : ;;r::: hr :h:t :r ;::r r 5 : '- ::: , $gg

b. Igg 7 h:ht: th: :::::':t:d ;:: r- 5 ::50 .........&_.u..

 : 5;; t h: f ; '. '.:. &. ': ':t'e-

.s-.a a o s m. me.u.9 m ... .......

5I5:T 5El -555 3d U E 5b"'7 E ' [ E b.h*

h,(vggePh55i5'Ot'I-EU

-t 12 S:; : :-d '- COLD SM'?00gtg'gI th: '-l hr' ; ?! 5: : g ator of any* Reactor Building- wppression f.y,Withthepositio chamber vacuum breake inoperable, restore the inoperable position Ied j indicator to OPERABLE tatus within 14 days or verify the 46& m m.* i va pe 1, e t Valve tr :t:- to be closed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by vi inspection. Otherwise, declare the vacuum breaker noperable or be-in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. I

--iyk

'so af.voke/veenda.ir operafed ton vo l SURVEILLANCE REQUIREMENTS l 4.6.4.2 Each Reactor Building - suppression chamber vacuum breaker shall be:

a. Verified closed at least once per 7 days.
b. Demonstrated OPERABLE: J
1. At least once per 31 days by- j each ve/vc i a) Cycling ;;: - tr::hr through at least one complete test j

' cycle of full travel. ,, ,,c,g y,/ge l

b) Verifying the position indicatorA0PERABLE by observing J expected valve movement during the cycling test.

2. At least once per 18 months by; a) Demonstrating that the force required to open each var"om breaker,does not exceed the equivalent of 0.5 psid. Qheck)I '

b) Visus) inspection 3 of eachi valve.h on toc valVt l c) Verifying the position indicator ^0PERABLE by performance of a CHANNEL CALIBRATION.

O h insirmeni achthn system for each Veris air ophended iso lA+ ion valve ado open con +rol sydem OPERABLE by fstformanct of er CHAWEL. CALISRATicht and verifyy 4h se+poid 4v bs less +ke or eruni FERMI - UNIT 2 to 0.5psid. 3/4 6-s0

I p. INSERT 3.6,4.2 a.

!3.6.4.2 Two Reactor Building to suppression chamber vacuum breaker valve sets, with each valve set consisting of a self actuating vacuum breaker check valve in series with an air operated vacuum breaker isolation valve, shall be OPERABLE and each valve closed.

INSERT b & c

b. With one of the valves in one of the Reactor Building to suppression chamber valve sets open, verify the other valve in the affected set to be closed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />; restore the open valve to the closed position within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

'c. With both valves of a Reactor Building to suppression chamber vacuum breaker valve set open, close at least one valve within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at lenct HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

i l

l l

1 I-

-