ML19325F214

From kanterella
Revision as of 06:22, 10 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1989 for Point Beach Plant,Unit 2,consisting of Revised Operating Data Rept
ML19325F214
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/30/1989
From: Krause C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19325F211 List:
References
NUDOCS 8911170041
Download: ML19325F214 (1)


Text

_ _ . _ ___ _ _ - - _ _ _

,

- q_

e e

9 4 g OPERATING DATA REPORT

  • 8911170041 891108 DOCKET NO. 50-301
  • PDR ADOCK 0"AOO266 R FDC DATE October 12, 1989 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS

. . . . . . .. . . . . . . . . . . . . . . . .

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UJIT 2 . NOTES .
2. REPORTING PERIOD: SEPTEMBER 1989 .

.

3. LICENSED THERMAL POWER (MWT): 1518.5 .

.

4. NAMEPLATE RATING (GROSS MWE): 523.8 .

.

5. DESIGN ELECTRICAL RATING (NET MWE): 497. .

.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. .

.

7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANT (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTPICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE

,

11. HOURS IN REPORTING PERIOD 720 6,551 150,480
12. NUMBER OF HOURS REACTOR WAS CRITICAL 535.0 6,331.6 132,433.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.6 216.7
14. HOURS GENERATOR ON LINE 530.0 6,232.7 130,329.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 302.2

!

16. GROSS THERMAL ENERGY GENERATED (MWH) 776,161 9,372,690 185,318,524-
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 265,520 3,216,010 62,889,710
18. NET ELECTRICAL ENERGY GENERATED (MWH) 252,200 3,070,816 59,925,238
19. UNIT SERVICE FACTOR 73.6 95.1 86.6 2C. UNIT AVAILABILITY FACIOR 73.6 95.2 86.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 72.2 96.7 81.4
22. UNIT CAPACITY FACTOR (USING DER NET) 70.5 94.3 80.1
23. UNIT FORCED OUTAGE RATE O.0 2.0 1.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

!

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: November 10, 1989 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

.- , _ _ _ _ . . . _ . . . _ _ _ . _ _ _ , , _ . . _ _ _ . - , . . , . _ _ _ . . _ _ . _ . . . . . . _ _ _ _ _ _ _ _ , _ . _ . _ . . . _ . . ~ . _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

_