ML19325F210

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1989 for Point Beach Nuclear Plant Units 1 & 2 & Revised Rept for Sept 1989, Correcting 5 Mwh Error in monthly,year-to-date & Cumulative Figures for Gross Thermal Energy Generated
ML19325F210
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/08/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325F211 List:
References
CON-NRC-89-140 VPNPD-89-582, NUDOCS 8911170036
Download: ML19325F210 (1)


Text

m m

.,c.

m

+..j:f WISC00 Sin

.~

' Electnc

. POWER COMPANY i

y

. 231 W Michigan, Ro. Box 2046. Milwaukee, WI 53201 (414)221 2345 VPNPD-89-582

p NRC-89-140-i

-November 8, 1989

.U.

S. NUCLEAR' REGULATORY COMMISSION

' Document Control Desk Mail Station P1-137 Washington, D.-C.

20555 Gentlemen:

i DOCKE'?S 50-266 AND 50-301 MONTHLY OPERATING REPORTS POIN'? BEACH NUCLEAR PLANT, UNITS 1 AND 2

. Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1989.

In' addition to the monthly report for October 1989, we have

?

i.

enclosed'a revised Operating Data Report for Point Beach, Unit 2 for the month'of September.1989.

This revised page corrects a 5 MWh' error in the monthly, year-to-date, and cumulative figures for gross thermal' energy generated, as found on Line if of_this report.

This correction is'already reflected in the data reported for Point Beach, Unit 2 for October'1989.

1 very truly yours, s

/

Ue L

C. W.

a l

Vice President l

Nuclear Power l'

l Attachments 1

Copies to R.

S.

Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 1

8911170036 89110s

[ggj PDR ADOCK 05000266 R

PDC I

l '.

1 A suMunyofHinrnsis ExqsOnwrtha

.