Forwards Monthly Operating Rept for Oct 1989 for Point Beach Nuclear Plant Units 1 & 2 & Revised Rept for Sept 1989, Correcting 5 Mwh Error in monthly,year-to-date & Cumulative Figures for Gross Thermal Energy Generated
ML19325F210
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/08/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325F211 List:
References
CON-NRC-89-140 VPNPD-89-582, NUDOCS 8911170036
Download: ML19325F210 (1)


Text

m , m

.,c. m

+..j:f

.~ -, . .

WISC00 Sin

' Electnc

. POWER COMPANY _

i

,. y . 231 W Michigan, Ro. Box 2046. Milwaukee, WI 53201 (414)221 2345

, :p VPNPD-89-582  :

NRC-89-140-i

-November 8, 1989

.U. S. NUCLEAR' REGULATORY COMMISSION

' Document Control Desk Mail Station P1-137 Washington, D.-C. 20555 i

Gentlemen:

DOCKE'?S 50-266 AND 50-301 MONTHLY OPERATING REPORTS POIN'? BEACH NUCLEAR PLANT, UNITS 1 AND 2  ;

. Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1989.

i.

In' addition to the monthly report for October 1989, we have  ?

enclosed'a revised Operating Data Report for Point Beach, Unit 2 for the month'of September.1989. This revised page corrects '

a 5 MWh' error in the monthly, year-to-date, and cumulative figures for gross thermal' energy generated, as found on Line if of_this report. This correction is'already reflected in the data reported for Point Beach, Unit 2 for October'1989. ,

1 very truly yours, s

/ ,

Ue ' '

L C. W. a l Vice President l Nuclear Power l'

l Attachments 1

Copies to R. S. Cullen, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 1

8911170036 89110s PDR ADOCK 05000266

[ggj R PDC ,