ML19305C430

From kanterella
Revision as of 04:45, 1 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Description of Licensee Activities Addressing Order Confirming Suspension of Const.
ML19305C430
Person / Time
Site: Marble Hill
Issue date: 02/28/1980
From:
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To:
Shared Package
ML19305C428 List:
References
NUDOCS 8003280539
Download: ML19305C430 (86)


Text

{{#Wiki_filter:_ - ._. E....rs .

  =                                                                i
I5i I
  ?~                                                               '

Ih:b b=

   .

DESCRIPTION OF LICENSEE ACTIVITIES ' 55'~ ADDRESSING ORDER CONFIRMING

                                       .

SUSPENSION OF CONS 3UCTION

i i i ii
;h
::.

l !=

MARBLE HILL NUCLEAR GENERATING STATION
; e.:

PUBLIC SERVICE COMPANY OF INDIANA, INC.

  ..                      DOCKET NOS. STN 50-546 AND 50-547 h
   =
"
   .:

.i .':. .

   ==-.
   --
           ,
.'
   '
  . {.;.,'

i a:..

                                         '
               - .   .                                           -
                                                                                                                '

I l;, g . 3 TABLE OF CONTENTS i

= /'
                                                                                                                   '

Ti= Page

  *-                                                                                                               j s
                                                                                                                   .
  • I. Introduction . . . . . . . . . . . . . . . . . .. . . . . . 1-1 '

? EE ' U5 II. Revised Quality Assurance Program. . . . . . . .. . . . . . 11-1 , a: [ji III. Steps Taken to Assure Safety-Related Work . . . . . . . . . III-l

  ._                   A. Review of Work Completed .   . . .. . . . . .. . . . . .               III-A-1
.:
E~

B. Results of Independent Audit . . . . . . . . . . . . . . III-B-1

.; C. Description of Staffing and Qualifications . . . . . . . III-C-1
=:.

D. Review of Safety-Related Contracts . . . . . . . . . . . III-D-1 iib

   .-_

E. Description of Deficiency Identification and Evaluation . . . . . . . . . . . . . . . . . . . . III-E-1 h[ F. Description of System to Halt Construction . . . . . . . III-F-1 i G. Description of Inspection Planning . . . . . . . . . . . III-G-1 i ha Eh H. Description of PSI ASME Code Program . . . . . . . . . . III-H-1 1 ::: I. Description of System of Indoctrination. . . . . . . . . III-I-l

   ;
   ,
      - - -
     "2   .
    =:

55 r!:: I

        .7
'.2

' ^; . E Ei -

      "
    .1
    ;;;

I

= ,

C

              *                                                                        -                    _ _
                                                                                 - _ .

l Ib,3 .  :

                                                                                                  .
I. INTRODUCTION .

On August 8, 1979 Public Service Company of Indiana, Inc., (PSI) stopped - l Es

             '

all safety-related construction work at its Marble Hill Project due to

 ;.g               certain deficiencies in its Quality Assurance Program. On August 15, 1979, the Director of the Office of Inspection and Enforcement of the NRC issued an order confirming the work suspension (Confirming Order), which also set
    "'

forth certain requirements for the resumption of safety-related work.

        '

These requirements consisted of a description of PSI's revised Quality Assurance Program and tne steps taken to assure construction will be

                                            ~
carried out in accardance with 10 CFR 50, Appendix B. Since that time PSI
  =                has made major changes in the project which, PSI is confident, will provide

' reasonable assur3nce that the Marble Hill Project, when completed, will .6 meet applicable safety requirements. This report describes chese major g.3 changes and includes a description of PSI's revised Quality Assurance Program, as well as PSI's response to the issues set forth in the

           ,

Confirming Order. PSI submits that the information contained in this report adequately addresses the concerns of the NRC. This report is organized so as to first summarize the revised Quality Assurance Program and organizational responsibilities. This is Part II of the report. Sub sequen tly, the report addresses actions taken relative to specific concerns stated by the NRC in its Confirming Order of August 15,

   . . . .

1979. These concerns are addressed in Part III of this report and in the 7 same sequence that they appear in the Confirming Order.

    =

1

't=
         .
.

{C:

E2

     .

Es . E

I-1

               '
                                                                                       ~,      __
                                                                                                    '

't i2 s . II. REVISED QUALITY ASSURANCE PROGRAM

.
"~if                   The following description of PSI's revised Quality Assurance Program is submitted in response to Part IV of the Confirming Order.       Figure C-3 in Part III, Section C, of this report, shows the revised structure of the PSI Quality Assurance organization.
        .

gg _

1. Organization
..
 $                          The Vice President-Electric System (who reports directly to the President of PSI) is charged with the overall responsibility for g                           the Marble Hill Project Quality Assurance Program. The Quality riy                        Assurance Manager reports directly to the Vice President-Electric System and is organizational 1y independent of cost and schedule 2                         considerations. The Quality Assurance Manager has the authority

_ and responsibility to implement the necessary controls to assure

  ~'

that the Marble Hill Project Quality Assurance Program meets all NRC requirements.

  . . . .

is The Manager Quality Engineering reports to the Quality Assurance Manager and is responsible for supervision, coordination and

   ""

direction of the discipline Superintendents Quality Engineering. He also maintains communication and coordinatic.n between the various Superintendents Quality Engineering and other PSI, contractor and supplier organizations.

  • The Superintendents of Electrical, Mechanical, Welding /NDE, and Civil (discipline) Quality Engineering are responsible for Quality i= Assurance matters within their disciplines. These responsibilities include: review and approval of PSI generated Purchase Documents; review of PSI Engineering Documents; J. preparation, review, and approval of PSI Inspection / Surveillance i~ plans and procedures; and audits of the effectiveness of the practices, adequacy and performance of contractor and supplier

_. Quality Assurance Programs. The Superintendents Quality l

  ~}

Engineering report to the Manager Quality Engineering. l The Superintendent Procurement Quality Assurance reports directly E ' to the Manager Quality Engineering. He is responsible for coordinating procurement related interfaces between the discipline Superintendents Quality Engineering, Superintendent Inspection, 1

   -

and suppliers and contractors. He maintains the Approved Supplier ' and Contractor List, and reviews supplier / contractor quality

                                      ~
=

trends and recommends necessary corrective action. PSI activities related to the performance of supplier and l contractor surveillance and receiving inspection is the I responsibility of the Superintendent Inspection. He assures that l

           -

inspection and surveillance activities are performed by trained l

    =                         and qualified personnel and that records resulting from inspection      l and surveillance functions are properly completed, legible and
                            . authenticated. He reports directly to the Quality Assurance Manager.
    =:

11 1

             .
i. .
The Superintendant Quality Systcms is responsible for developing yr and maintaining the Project and ASME Quality Assurance Manuals and supporting quality procedures. He provides quality related
         .

descriptions of changes aff ecting the SAR; provides for the training of PSI Quality Assurance personnel and provides input to

 !=               the Training Coordinator for quality-related training for other project organizations; directs the activities of the Audit
    ;

Coordinator who establishes the schedule for a comprehensive PSI Quality Assurance audit program utilizing qualified lead auditors and contract and PSI Quality Engineering personnel to assure

 -                applicable Quality Assurance criteria are audited at least annually; assures retrieval and maintenance of supplier and contractor Quality Verification Records; and is also responsible for establishing a Quality Assurance trending program to provide a management tool for statusing and trending nonconformances. The
 ~

Superintendent Quality Systems reports directly to the Quality Assurance Manager.

       '
2. Quality Assurance Program The PSI Marble Hill Quality Assurance Program is described in the
 ._
 ~

Project Quality Assurance Manual (PQAM) and applies to those activities which affect the quality of nuclear safety-related items, material and systems. The program includes contractor and p'.:: supplier activities and services affecting quality or safety.

 ..

Safety-related activities relating to the ASME Section III Code L piping systems are conducted in accordance with the ASME Quality

 ,                 Assurance Manual (AQAM). The AQAM complies with the requirements of the ASME Boiler and Pressure Vessel Code, Section III, and, by reference, is part of and not in conflict with the PQAM.

The Quality Assurance Manager is responsible for preparation, _. issuance, revision and control of the Marble Hill Project Quality Assurance Manual (PQAM) and the Marble Hill Project ASME Quality

  ""

Assurance Manual (AQAM). The authority for these manuals stems from a policy statement endorsed by the President of PSI and R: included as part of each manual. Each section of the Quality

 =                 Assurance Manuals is approved by the Project Director, the Quality Assurance Manager, and the Vice President - Electric System. The
  ,_

Quality Assurance Manager is responsible for distribution of [" manuals and section revisions to assure that they are available at all locations where required. Distribution is made in accordance

   ~

with a controlled distribution list to assure that controlled copies are maintained up-to-date. The Quality Assurance Program requires indoctrination and training p: . of personnel performing safety-related activities to assure their

   =                understanding of the purpose, scope and implementation requirements of the PQAM and AQAM. Implementing instructions and procedures are included in tr'aining programs to assure knowledge of principles and techniques for specific activities being performed.

The Quality Assurance Manager is responsible for the Quality Assurance indoctrination of PSI personnel who perform activities af fecting quality. PSI's contractors and suppliers are , responsible for developing and implementing programs for their

  • 11-2
                                                                                            . I t

j

= , .

p2rssnnal. Thnsa progrces shall includa Quslity Assurence , s indoctrination and training commensurate with their scopa of work. Indoctrination and trcining records shall be maintained as.  : _EE.'" . Quality Assurance Records. ,

            -
                                                                                               '
                                                                                              '

__ 5 PSI Quality Assurance organization has full authority to stop

 '                further processing of items or materials by PSI or its suppliers             >

and contractors; to identify quality problems; to initiate, if recommend, or provide solutions; and to verify implementation of

 "

solutions. The individual stopping further processing is , responsible for documenting the nonconforming condition on a 2 Nonconformance Report or Corrective Action Request as Ei appropriate. Once further processing has been stopped, the organization responsible for the activity which was stopped shall not resume this activity until the conditions of the Nonconformance Report or Corrective Action Request have been 2.;~ corrected or dispositioned and the PSI Quality Assurance Manager has provided documented authorization to resume processing.

    .=

!Eh The Quality Assurance Manager has the full authority to stop work of any PSI contractor or supplier organization which, in his judgment, must be' stopped in order to correct poor quality trends or performance. This Stop Work Authority includes such things as a single process and broader scope activities such as entire design activities of an organization, installation activities of a 7s contractor and fabrication or processing of PSI purchased materials or items. The Quality Assurance Manager is responsible for orally stopping the work by notifying appropriate management in the affected organization. The stop work is documented on a

  '

, Stop Work Order which is signed by the Quality Assurance Manager. Documentation of the Stop Work Order includes conditions or FI actions required prior to restart of the work. Once the

p: conditions requiring correction have been acted upon and have been verified to be acceptable by the Quality Assurance Manager, he

, removes the Stop Work Order by signing the release portion of the

"2_. Stop Work Order. Completed Stop Work Orders are retained as
' "'

Quality Verification Records.

   '.P              The Vice President - Electric System is responsible for reviewing           i
EE and evaluating the status and effectiveness of the PSI Quality Assurance Program. The primary elements of management participation are by review of Quality Assurance reports, and l? establishment of a Quality Assurance Review Committee (QARC) which holds meetings to review Quality Assurance Program activities. An annual independent audit shall be performed at the direction of the Vice President - Electric System which assesses the scope,

_ , {} tmplementation, and effectiveness of the Quality Assurance Program to assure that the program is meaningful, effectively complies [] . with applicable codes, standards and regulatory guides and

    =                effectively implements all elements of the Quality Assurance Program as stated in the PQAM. Reports containing the results of pp               the audit shall be reviewed and appropriate action taken as directed by the Vice President - Electric System.

>

    'I y

_. II-3 7

              -
                                                                      . - - .-   ,  .-. - , -

__

                                                       ,-      . --
                      .        _                                            _         -   ._-     -.

f i

              '     '
3. Dasign Ccntrol E. .
  '                         The Project Engineering Manager is responsible for design activities associated with the Marble Hill Project. The Project
  • Engineering Manager assures that the classification of structures, systems, and compone'nts by safety classification, code
 ,

classification, seismic category, quality group, and electrical

  =

classification, as applicable, are performed and documented. He

  =                         assures that classification of structures, systems and components 5                         is consistent with regulations, codes and standards as described in the Final Safety Analysis Report.

= PSI may subcontract design work but retains responsibility for the adequacy and completeness of the design and achievement of structural integrity. The design of the plant is defined in Engineering Documents, which consist of those specifications, _ 5 procurement specifications, and drawings prepared by PSI or its design subcontractors which detail final design and define technical requirements of structures, systems, components, items,

      . . . .
.E

"" or materials. Changes to approved Engineering Documents are accomplished by one of the following methods:

                               -   Direct change of the document in accor(ance with Sargent &

Lundy Engineers (S&L) internal procedures.

= - Issuance of an S&L Engineering Change Notice (ECN).
                               -    Issuance of an approved Field Change Request (FCR).
; .,.

The responsibility for design verification is assigned to the organization responsible for preparation of the design. The

   =                         verification process consists of design review by persons
   =                          independent of the document preparer, or alternate calculations, or verification testing of a unit.
   .g                    4. Procurement Document Control
    =

Procurement by PSI is accomplished through the utilization of a 73 Purchase Requisition and a resulting Purchase Order or Letter of

   ~

Intent followed by a Purchase Order. Reporting requirements. required by 10 CFR 21 shall be included or referenced in Purchase _

   =~                         Documents. PSI Procurement Documents identify, as a minimum, the necessary approved Engineering Documents and the Quality Assurance and documentation requirements.

E

55 Purchase Requisitions are prepared for Quality Assurance approved suppliers or contractors and are reviewed by Quality Assurance
     .g ,                      personnel to assure inclusion of the appropriate quality E                          requirements.
=

' Purchase Orders are prepared which incorporate the technical and 5 quality requirements of the approved safety-related Purchase l F5 Requisition. Quality Assurance reviews and signs all Purchase I , Orders to assure that all the Purchase Requisition and Quality I Assurance requirements have been included and that the supplier or l contract'or selected is approved. j ! l" .II-4

                  -

1

                                                                                  -

8 . > t

  • A Lattse of Intent cay ba uscd by ths Dirsctor of Purchasing end s3 is utilized to provide an initial contractual commitment for the -

F Company prior to the issuance of a formal Purchase Order. Letters  ; of Intent are handled the same as Purchase Orders and include the j {^7 same Quality Assurance requirements.

 ?                                                                                      '

All Change Orders, including scope changes, are prepared, reviewed

and approved in the same manner as the original Purchase Orders.

E 52 Change Orders for construction site additional work may be implemented through Extra Work Authorization Letters to site

  =             contractors to perform specific work under the conditions and requirements of the Change Order for additional work. When Extra Work Authorization Letters are employed, they are approved by Quality Assurance.

5

5. Instructions, Procedures and Drawings Marble Hill rquirements for Quality Assurance are set forth in the PQAM in sufficient detail to establish the key elements of control for implementing the Quality Assurance Program. Where necessary to expand on requirements of the PQAM in greater detail, this is accomplished by preparation of Project Management Procedures (PMPs). Project Management Procedures include implementing instructions for Marble Hill engineering, procurement, construction, contract administration, project controls and Quality Assurance. The PMPs are controlled documents and are
readily accessible and available for use. All PMPs are consistent with PQAM requirements and are approved by the Project Director
  '

and the Quality Assurance Manager.

. w e,

[ 6. Document Control

  =

Project Documents which prescribe activities affecting quality will be controlled by the site Document Control Center. These

   =             documents are design drawings, design criteria, specifications, technical manuals, Project Management Procedures, and contractor procedures. The Project Engineering Manager has the overall
  ,

responsibility for implementing the methods and procedures of the Document Control Center. During the design, procurement, construction and construction test phases of the facility, the i: Document Control Center shall maintain a controlled file of

   ";

documents distributed. The PSI Project Engineering Administrator shall have administrative control over the site Document Control Center. During the course of the project, Project Documents requiring distribution control shall be released by the Document Control Center. _. [;

  • PSI Nonconformance Reports and supplier and contractor Quality
    ~

Assurance Manuals are filed and maintained by Quality Assurance.

    =             These are controlled by Quality Assurance to assure they are 1             updated and maintained current. Purchase Orders are issued by the PSI Purchasing Department and maintained in the permanent project files.

7.. b

       -

11-5

         .

I .!5. . .

7. Control of Purchased Material, Items and Services p.

' The PQAM defines requirements for the control of suppliers,

..

contractors and subcontractors who are provioing safety-related hC items, materials or services. Suppliers are those organizations furnishing items or materials to PSI. Contractors are those organizations providing construction or installation services at the site. Subcontractors provide items or services to PSI f suppliers or contractors.

Quality Assurance has prime responsibility for assuring that suppliers and contractors comply with PSI's applicable Quality Assurance Program requirements. PSI suppliers and contractors are controlled directly by PSI through the establishment of Quality Assurance requirements in procurement documents and by PSI
                , conducted audits,, surveillance and inspections. The Quality Assurance Manager is responsible for assuring that procurement of items and services are controlled to assure conformance with PSI requirements. The effectiveness of the control of quality by suppliers and contractors is assessed by the Quality Assurance Manager at intervals consistent with the importance, complexity and quality of the item or service. Material shall be requisitioned, procured and received by PSI persornel in accordance with applicable sections of the PQAM for issuance to PSI contractors, except for code material for piping subassemblies. Code material for piping subassemblies shall be requisitioned, processed, and received by PSI personnel in accordance with applicable sections of the AQAM for issuance to PSI contractors.
8. Identification and Control of Items and Materials E..
 "

The PQAM establishes requirements for identification and control of materials and items for the Marble Hill Project. PSI maintains responsibility for identification, preservation and status of PSI purchased items up to the point the items are issued to site contractors, at which time the contractor's Quality Assurance Program continues the responsibility. This control is verified by PSI Quality Assurance through surveillance and audit. The Project Engineering Manager is responsible for assuring Engineering Documents specify identification requirements. The Superintendent Inspection is responsible for determining the acceptance status of items and material received, for marking or tagging the items and material, for follow-up of nonconformances and for removing or changing tags when nonconformances have been resolved and cleared. Quality Assurance personnel are the only personnel within PSI authorized to remove or change inspection

 '
  .
     -

status tags. Records are maintained by Quality Assurance which

  '

show the inspection status of items received. i

  *
9. Control of Special Processes The PQAM provides measures for the control of special processes.
  "                 Contractors and suppliers provide controls to assure qualifiestion l

l II-6 I

                                                                                         -
       .
                                                                                  ,

_. - -

                                                                                                                           ,
     !*
  • l of procedures and personnel required to perform special y;r. processes. These requirements are passed on to applicable subtier c

contractors or suppliers by contract.

 ..

hj It is the responsibility of the Superintendent Welding /NDE Quality F Engineering to certify all levels of PSI Nondestructive Examination personnel. Personnel may be certified by appropriate PSI Level III personnel or by a qualified outside agency.

     .

[2 ai Certification records are maintained by the Superintendent 1 Welding /NDE Quality Engineering. 'n= Inspection

 '

10. . 4, The requirements and responsibilities for the control of inspection activities are defined in the PQAM. ) Inspection personnel are independent of the individual or group i, performing the activity being inspected. The Quality Assurance Manager is responsible for assuring that inspectors are trained, qualified and certified in the performance of their intended n' function and for maintaining these certifications current. The Manager Quality Engineering is responsible for the preparation, review and approval of inspection plans and checklists which detail the inspections to be performed and appropriate jg accept / reject criteria.

     ,

Project Management Procedures, inspection plans or checklists and

necessary drawings and specifications will be available for use I! prior to performing inspection operations. Inspections will be performed under the direction of the Superintendent Inspection.

Inspection results, inspector identity and date of inspection will _ be recorded on inspection plans or checklists and become Quality Verification Records.

11. Test Control-Design, Procurement and Construction Phase Construction tests include such tests and verifications as cable meggering, hydrostatic tests, motor bumps, flushing, component
" calibrations, functional tests and initial energization of electric equipment. These tests verify the integrity of the construction contractor's work.

4.. The Qualit ..ssurance Program defines a test control program to assure thas all construction testing is identified and

   .ig impicmented. Quality Assurance surveillance of construction testing will be performed and will include:
   '~
        *                   -    Verification that the item is ready for testing and the 2=                             responsible contractor has verified that records are available.
   ;
   '
                            -

Verification that open nonconformances have been resolved or reviewed to assure no impact on the test. ' '

                            -     Verification that the tests are being performed in accordance

, with approved procedures.

  • II-7
          -
               . _ _ _ -               -
                                                     . _ - - _                  ,    _   _ . ,  ,_ _ - - - - - _ - -
                                                                                   .
        ,   .

[] - Witnessing mandatory inspection or hold points. t= s: Written test procedures will be prepared by PSI and contractors g for construction testing. Test procedures including those .D procedures prepared by contractors are approved by PSI prior to

'

their use. Administrative controls of the Construction Test Program will be defined in Project Management Procedures consistent with PQAM requirements. Procedures prepared for the

  • Construction Test Program will be of such scope as to meet the PSI commitments contained in the Final Safety Analysis Report, the
 ,

Design Specification and the ASME Code. The construction or instal,lation of structures, systems and

t. components associated with the test will be completed to the degree that outstanding construction items could not reasonably affect the validity of the test results. This determination will be made and documented by review and evaluation of specific Construction Test Procedure requirements. A program for the safety tagging of equipment will be established and documented in a PMP. During testing, measuring and test equipment used will be calibra':ed in accordance with approved procedures. Approved and
 -

completed test documentation will be retained as Quality Verification Records.

_.
 -
12. Control of Measuring and Test Equipment The PQAM provides for the regularly scheduled calibration and control of measuring and test equipment used by PSI and the
 ~

t preparaticn and maintenance of calibration records.

 ,

Procurement of measuring and test equipment and calibration services will be from suppliers and organizations approved and qualified by Quality Assurance to supply equipment and calibration services. Each instrument will be assigned and marked with a unique identification number prior to calibration and initial use. In instances where it is not feasible to so identify an instrument,

the container for the instrument will be identified and care will be exercised to insure that the instrument remains with its
container. A Master Equipment List will be maintained to show
  =E                  equipment calibration and recall cycle.

r Controls will ensure that measuring and test equipment has an

uncertainty (error) of no more than 1/4 of the tolerance of the  ;

parameters being measured unless limited by practical limits of '

              '

the state of the art. Equipment calibration will be against

   .._5*              certified equipment or transfer standards having known valid         i
    =

relationships to nationally recognized standards. If no national l standard exists for a specific instrument, the calibration l

   ""

standard used will be approved by Quality Assurance and I

     =                documented. Inspection and testing equipment which is found to be out of calibration will be reported on a Nonconformance Report.

,. The acceptability of items measured with that instrument since its

      .

last valid calibration will be reevaluated.

   -

11-8

          -

2 .

.. 9 .

Calibratica procaduras cnd escords will be ceintainsd as Quality bl Verification Records.

,9
13. Handling, Storage and Shipping ,

7 H The requirements and responsibilities for handling, storage and shipping of safety-related items and material purchased by PSI are i.c defined in the PQAM. F

'"

Special handling, preservation, storage, cleaning, packaging and shipping requirements are identified in Engineering Documents. ._Ei These documents are reviewed by Quality Assurance prior to use to

   =

determine that acceptance criteria have been included. Surveillance of site storage and handling activities is performed by Quality Assurance to assure required controls are implemented. Ei Instructions needed to identify how PSI controls these activities are provided in PMPs. Site contractors are informed of special handling, preservation, storage, cleaning and packaging .. . requirements as described in Engineering Documents and

 ~~

manufacturers' special instructions as appropriate. Special work procedures will be required for items which need special handling because of weight, size, susceptibility to shock damage or other conditions which warrant special handling. Provisions will be provided for certification and use of hoisting equipment and inspecticn of handling equipment and rigging consistent with ANSI N45.2.2 and Regulatory Guide 1.38. f" Instructions will identify controls required to minimize the possibility of damage or degradation of the quality of items due

 ^

to corrosion, contamination, deterioration or physical damage.

 .                   Records of storage, handling and control and issuance of items in

'== PSI custody will be maintained by PSI Material Control Management. Similarly, such records will be maintained by site r contractors for items under their control. Where special

= preservation and storage requirements are necessary, records will be traceable to the item. Surveillance and audit of storage, g handling, and issuance of items will be performed to assess the
 -

adequacy and effectiveness of these practices.

14. Inspection, Test and Operating Status 1
 ~'

PSI maintains identification and status of PSI purchased items and equipment from the time it is received at the site until it is ,

          '

issued to site contractors. The identification and status I

                                                                                        '

controls of suppliers and site contractors are monitored through approval of their procedures and by surveillance and audit. The r-

        ,            Quality Assurance Manager is responsible for assuring that a E4
   -

controlled system of stamping, tagging, marking, labeling, and/or segregating storage of material, items and equipment is u implemented. The system also provides a means for identifying the is status of systems and components involved in tests during the

construction phase. This system identifies the status of those items received and stored by PSI.

Eh

.
   -.

e II-9

            .

m, . r

15. Nonconforming Materials and Items

.4I=; The PQAM defines the system for control of nonennforming materials j1

              ,

or items on the Marble Hill Project. It defines measures lE established to control the identification, documentation, segregation, review, disposition, and notification of responsible E organizations in the event of nonconformance. .lE Each employee is responsible to bring any questions he has to the

= attention of Quality Assurance about the conformance of any materials, items or processes to requirements specified in Engineering Documents. The ultimate responsibility and authority for assuring quality rests with the Quality Assurance Manager.
EE Disposition of all PSI-reported nonconformances is subject to
  ;=                     approval of both Pro!ect Engineering and Quality Assurance.

Nonconforming items and materials are segregated from acceptable items and materials and identified as discrepant. If, because of i; bulk, size, and weight, physical segregation is not possible, tagging or roped off areas may be an acceptable substitute for segregation. Contractor and supplier-reported nonconformances which are dispositioned "Use as is" or " Repair" are required to be

  ~

formally reported to PSI for review and approval by PSI Project Engineering and Quality Assurance. For those PSI nonconformance

   ,

reports and contractor reported nonconformances which are

  ,                       dispositioned "use-as-is" or " repair", a periodic analysis is provided by a trending program.
' *p.

For those contractor nonconformances which are dispositioned

'l                        " replaced" or " reworked", a periodic audit is performe) by PSI
   .,                     Quality Assurance. This audit provides additional information to
'=                        management relative to quality trends.
   ;:

In addition to the disposition instructions, completion of the

      #
                          "Cause" section and " Corrective Action" section of the NCR is
   -

required. It is the responsibility of the dispositioning organization to provide and fully implement the " Corrective jg Action."

    ._

Quality Assurance is responsible to sign off PSI Nonconformance

   '

Reports when all work is complete and accept-ble. When repair is r~ required, the PSI Quality Assurance Inspector shall assure that retests, reinspections and reexaminations of the materials / items

     -..

meet the applicable requirements. A periodic analysis of Nonconformance Reports is provided by a trending program. This program provides management with

            .

information relative to quality trends. A computer printout is

used to assure all Nonconformance Reports art closed and provide a log of Nonconformance Reports. Follow-up of nonconformances based

on trending data will be performed.

p Nonconformance Reports are reviewed by Quality Engineering for

       ....

determination if'the report condition is "Potentially NRC [E Reportable". A "Potentially NRC Reportable" ranking may be made

     ;;                     witen a nonconformance or discrepancy appears to meet the
     .

II-10

                .
                                                                 - ~ _
 <
 %, o      .
 .

p requirements for reporting in accordance with Nuclear Regulatory

 ;2 Commission regulations:

10 CFR 21 - Reporting of Defects and Noncompliances E3 10 CFR 50.55(e) - Significant Deficiencies

If a "Potentially NRC Reportable" rank is determined, a copy of E4 the NCR is forwarded immediately to the Marble Hill Safety Review

  '

Committee for further evaluation. The Marble Hill Safety Review Committee will review the deficien:y within twenty-four hours, and . E3 if the deficiency is determined as reportable, the NRC will be is promptly notified. Whenever the Marble Hill Safety Review Committee does not have sufficient information to classify a potentially reportable deficiency in a period of twenty-four a: hours, preliminary notification to the NRC will be made. The

   #             Marble Hill Safety Review Committee will promptly acquire the needed information so that classification may be accomplished, and
   =              follow-up notification to the NRC provided.

E= A written report will be submitted to the NRC as required by 10

     =            CFR 21 and 10 CFR 50.55(e) within the specified time frame. All
        .

reports concerning potential and actual reportings of deviations, significant deficiencies and safety hazards will be controlled and maintained as quality verification records.

16. Corrective Action The PQAM defines requirements for corrective action. It details

'f - the documented measures utilized to assure that significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and items, and other 15[ nonconformances are promptly identified and corrected with action ' taken to preclude repetition.

     ==            Nonconformances and discrepancies that relate to procedural
    ~

breakdowns or documentation deficiencies or represent deviations from engineering requirements on items and materials not in PSI _,F2 custody will be documented on a Corrective Action Request.

     ";             Nonconformances and discrepancies that represent deviations from Engineering Document requirements on items and materials in PSI       <

custody will be handled by initiation of a Nonconformance Report. l The evaluation of nonconformances and determination of need for i corrective action is accomplished in accordance with Project l

     ;,;

Management Procedures. Corrective action will be initiated and  ;

      ~

follow-up reviews accomplished to verify both proper ) implementation of corrective actions and close out of corrective )

                                                                                          '
     , -

action documentation. Adverse conditions significant to quality,

      =              the cause of the conditions and the corrective action taken will be reported to appropriate levels of management.

The PSI trending and tracking program provides follow-up and timely action for. corrective action by providing a 10-day overdue n., notice printout for construction site Corrective Action Requests

      ""             and a 30-day printout for supplier Corrective Action Requests.

l l 11-11

                                                                                       -.
                                                                                                        .,
                   - . _ .             ._.
                                                                                                                         .

4 p"3 . Th2 printcut shall b2 recomplishtd on c weakly basis and 2 distributed to appropriate line managem:nt.

  ?.1
       .~

The Quality Assurance Manager conducts trend analysis reviews of

             .

nonconformances of PSI supplier and contractors to identify E.;__ conditions which are adverse to quality. The Quality Assurance

'r=                            Manager reports the results of this review in writing to thd Vice President - Electric System.
.
=-

_ 17. Quality Assurance Records i s: The PSI PQAM defines requirements for Quality Verification

    =                          Records. It establishes methods and responsibilities for I                              controlling Quality Verification Records at PSI General Headquarters, the Marble Hill nu('aar plant site and the remote storage areas.
   .

Suppliers or cont'ractors prepare and maintain Quality Assurance

    ~

Records as required by procurement documents, applicable codes is and standards. PSI is responsible for maintaining records required for Quality Assurance, construction, fabrication, manufacture, and' installation of materials or items. Records incluce documentation of materials, manufacturing, personnel qualifications, procedures, specifications, design reports, drawings and test data. The Quality Assurance Manager assures

 , gg                           that all records are maintained at the PSI Quality Assurance

'#~ Records facility or at contractor or supplier facilities, if required by Procurement Documents, for a period of five years

 .I                             after completion of the item, b e not less than two years after II                              commercial operation of the plant.

gg Quality verification records are classified as either " Lifetime"

      '                         or " Nonpermanent". " Nonpermanent" records will be retained for a limited period of time to show evidence that an activity was
          ;.

performed in accordance with applicable requirements. " Lifetime"

       ~

records will be retained for the service life of the plant or the lifetime of the item or material in service, as applicable. jE Supplier and contractor quality verification record packages for

     -

items and materials are stored and maintained in accordance with a ' PMP which describes the records filing system. The records filing

, g:p system includes indices which assure a complete record of Project Documents entered into the plant index files. These indices are

' ' updated as required and will indicate the document revision and date to assure the most current revision is identified. The indices are of sufficient detail and quality to provide ready >ff5 retrieval of all project documents. Eg - Records which provide documentary evidence t%ir items or materials l conform to requirements will be maintainra is the plant site prior to installation or use of the item or $4 ce a1. Record storage EE facilities will be constructed at t'; e s ' '.' + ) cocply with ANSI

1~ N45.2.9. In the interim, duplicate .opies of records are I

maintained at the site and at PSI GhQ., except for nonduplicated

- documents, such as radiographs, which are stored et PSI GHQ.

,  :=

      .:C
           ~

11-12

.

l .

                                                     .       ._.        _      _ . _ . . ~ _ .             , . - , . . _   ._

J

         .       .
,;                                                                                                     .

Hard copy racords are pleesd in foldars, envelopes or other ' appropriate enclosures for protection against tears or abrasions 9: received while in storage. Special processed records which are light, pressure, temperature or humidity sensitive are packaged

 =.
             '

and stored as recommended by the manufacturer of these materials

 #'                    or other indastry accepted standards.
18. Audits

&__ The PQAM defines requirements for audits. PSI uses a comprehensive system of planned and periodic audits to assure the implementation and effectiveness of the overall Quality Assurance Program. Audits tre performed of activities affecting quality within contractor, supplier and PSI organizations. The Superintendent Quality Systems is responsible for the

  ~

planning, scheduling, assigning of audit responsibilities and tracking of audit status, except for those audits directed by the Vice President - Electric System. Audits of the entire PSI program are conducted at intervals not exceeding one year. Audits may be conducted without advance notice. All elements of supplier and contractor Quality Assurance Programs will be audited at least annually or once within the life of the activity, whichever is shorter. Audits are conducted under the authority of the Quality Assurance Manager and are performed and reported by personnel not _ directly responsible for the activity audited. i,... Personnel performing audits may be selected from Quality i~ Assurance, PSI technical personnel, or may be consultants. In no t case will the person selecting the auditors nor the auditors themselves have any direct responsibility for the performance of the activities being audited. Lead auditors will be certified in accordance with a documented qualification program in accordance with ANSI N45.2.23 on the qualification of lead auditors. A _ program for examination and for certification of lead auditors is maintained.

                                                                                                         ,
   ,

Audits are performed using individual audit plans which describe j the audit scope and detail. Audit plans are developed by the audit team leader and approved by the Audit Coordinator. l Individual implementing checklists are also developed and approved 1

   -                     to ensure depth and continuity of audits.            Checklists p; ovide for
   "

recording of specifics such as procedure numbers, documents reviewed, general findings and comments. Each audit covers selected elements of the Quality Assurance Program. Examination will be of the depth necessary to assure that quality elements are being performed effectively. When there

  • is indication that a nonconformance or program deficiency may
    -

exist, detail will be explored to determine the extent and nature of this finding. Nonconformancer or program deficiencies found during a preaward survey are evaluated in the same manner as audit findings. At the conclusion of each audit, a post-audit I conference is held with management of the audited organization.

     ~

The audit findings including supporting details are discussed and

                                  ~

documented. F ,11-13

               -
                                               - - - - _     _ _ . .          .   .. _

(

  • L' Audit rcports are prepared and signsd by tha audit team leedsr.
  ?               Audit reports include an evaluation statement regarding the i:ih            effectiveness and quality trends of the Quality Assurance Program elements which were audited as well as specific nonconformances,

' s- deviations or program deficiency findings. The audited organization is required to respond in writing with commitments, stating the actions taken or to be taken and completion dates. Follow-up actions including reaudit, if

  '=              necessary, will be conducted in the deficient areas. Completed audit checklists, finding lists and reports are retained and filed
E; as quality verification records.

I Independent Quality As'mrance audits for management (management ry. audits) are the responsibility of the Vice President - Electric E: System. These audits are performed to verify and evaluate the status and effectiveness of the Quality Assurance Program. _ Management audits are performed through a review of audit results, corrective actions and results or reaudit verification. E Management audits are conducted by personnel who do not report to the Quality Assurance Manager. Management audits are conducted on an annual or more frequent basis and are documented by formal RF reports. These formal reports will be provided to the Audit Committee of the PSI Board of Directors.

   ,

r o.- l l

L l I
                                                                                     '
    =
    .

aw , LC

       -
       .
      =:    ,
.

I. k

      =
      ~~
                                               .II-14
              .
                                           .              _     _   _   .
                          .                                .      .             .-               _   _
    <

i

  • gi;'. .

lg , III. STEPS TAKEN TO ASSURE SAFETY-RELATED WORK The Confirming Order states that the Director, Of fice of

....

Inspection and Enforcement, will consider certain specific NRC 'l concerns. The following sections, A through I, of this report IE- address these itess individually. ,

     .:=
' bfb 5
                                                       .

j' l_. _ 5.b. .

      'i.=
! h:

l l =;c

'
E;

< (E

! ;u.

j 0:n i

      *
           .
E l

I

        . . .

n- i

!                                                                                                              ,

i i b5

=  !

.

         !r f *.O
        'L';

23

         .:
  • i bi; ,

i i l

         .$...
         .
          $'                                             111-1
               .
                                   . _ _ . _ , _ _ <         m, y   _ - - - , ,    ,_----,,--_g,   _
                                                                                                       .. ,- g
                                                                                   !
!
3. . .

A. REVIEW OF WORK COMPLETED

... -

I Item (1) of Part IV of the Confirming Order is whether and the extent to which PSI has: I Reviewed the work completed as of the date of this order to determine whether the Licensee's quality assurance 'n' program was adequate to assure such work was properly

 .....

performed and described what repairs, if any, are required. 55 PSI has developed a comprehensive integrated program which, when completed, will provide assurance that the work already completed at Marble Hill is sound and meets aoplicable safety requirements. This program consists of the following: _

 }?
                   -    Materia'l Verification Program             ,
                      .

Construction Verification Program

                    -

Nonconformance Review

.:..

Any deficiencies or nonconformances identified through these programs will be properly dispositioned, nu, t- .. Material Verification Program r: The purpose of the Material Verification Program is to establish confidence that receipt inspection of material received at Marble Hill prior to August 15, 1979, was performed properly and that the material is acceptable. This program, directed by the PSI Quality Assurance '" Manager, consists of the following:

   ;F                    a. Identification of Items to be Reinspected.

45 A review of receipt inspection records was performed to identify kinds and quantities of

   ;:                          Safety Category I material received at Marble Hill. Characteristics internal to components and others not readily verifiable upon receipt are a E2                          part of the vendor surveillance program and will not be verified in receiving inspection. A statistically valid sampling inspection will be conducted using sample sizes to provide ninety-five percent (95%) reliability with a ninety-five percent (95%) confidence factor. Any
        .

nonconformance identified upon reinspection that had not been previously dispositioned properly in accordance with Criterion XV of Appendix B will be evaluated by Project Engineering and Quality 9: Assurance. The sampling program dictates the requirements for increasing the sample size.

    ..~

III-A-1

          .

I

  • 5' f b. Sampling Method i?

Installed components cannot be fully inspected for -[5 , all characteristics identified for reverification. sii Consequently, samples will be taken from warehouse quantities, laydown areas, and items stored in

 .                 place, but not installed. If the sample discloses F4                a nonconformance, a technical evaluation will be
 '

made of the impact and necessary repairs, if required, will be performed. If discrepancies are

 ~

identified in specific items, one hundred percent (100%) of such installed items shall be evaluated for the same discrepancies. PSI Quality

  -

Engineering will approve the sampling method appropriate to each item as a part of the inspection checksheets. ij. c. Inspectors' Qualification Requirements _. Inspections will be performed by personnel . ]] qualified to Level I and Level 11 per ANSI

 ~

N45.2.6. Where Level I inspectors are used, they will perform to written checksheets giving discrete accept /teject criteria and under the direct supervision of a Level II inspector who will review the results and attest to the correctness of such -e. results. .!

d. Inspection Planning The reinspection of previously accepted items will be performed to inspection checksheets approved by PSI Quality Engineering. The checksheets will
                   identify the item, the sample size, the sampling

method, the characteristics to be verified and the method of inspection and will provide a means of

documenting the inspection. Inspection planning will be prepared by PSI or contract personnel qualified to ANSI N45.2.6 Level II or Level III.

_

e. Inspection Results Upon completion of the reinspection of previously accepted items and documentation, the results will
    .=               be made available to the NRC.
         .

4 1.1

     .

4 _.- III-A-2

                                  -                     -        ,
                                                                                   .

I

, ,

_

2. Construction Verification Program E
 "                      a. Scope
                                                                         \

iE In order to prove the structural integrity of [Ei in place concrete at Marble Hill, a nondestructive examination of the concrete was performed on a g statistical basis. A statistically valid sample of M-areas representing congested and noncongested locations in the structures was examined using pulse-echo and through-transmission testing i

  . . . . .E                 methods. Results of the examinations are presented
    '                        in the S&L Engineers Report, " Evaluation of            ,

In-Place Cdnerete, Marble Hill Nuclear Generating l dated November 20, 1979.

   $

Station, Units 1 and 2", This report was presented to the NRC on December j i 19, 1979. Based on the S&L report, it is PSI's  ;

    ~

conclusion that the quality of concrete in the i structures at Marble Hill meets specifications and l is therefore acceptable. l

        .,.

In order to further prove the acceptability of the existing safety-related construction at Marble Hill, PSI is conducting a Construction Verification Program. This program is based on a combination of

   ,
       =

' *E records review and physical inspection. Acceptance , criteria are based on specified design and quality l

requirements. Nonconforming work discovered I

[ through the Verification Program will be properly J documented and dispositioned in accordance with 1 c existing procedures and proper adjustment of the I ' sample size will be made,

b. Organization
q
     =                        Performance of the work in the field will be the responsibility of the PSI Construction Manager.
.: The PSI Project Engineering Manager is responsible
     ;;i:                      for providing technical support to the entire         l program. Physic 11 inspection will be performed     (

with the aid of verification teams. Establishment 1 x'._ of the verification teams shall be the 1

     ~~

responsibility of the Construction Manager with the  ! concurrence of the Project Engineering and Quality 9 Assurance Managers. Each team will consist of a team leader and a crew of inspectors. The team leader shall be an engineer who satisfies one of

        .;    .                the following u quirements:
i. Bachelors degree plus one year experience in
      =                              the discipline being inspected, or iF l

l l III-A-3 l l

                -

__, __ l

_ _ _ _ _ _ _ _ - _ _

        .,     .

ii. Five years experience in the discipline being lg inspected.

....

The team leader is responsible for the performance

"'                      and scheduling of the verification, but he shall i                       not be responsible for the recording and approval of data.

. ;;. Each verification tems will contain at least one PSI Quality Assurance Inspector, assigned by

 ;.;

Quality Assurance and qualified to Level II under

 ~~

ANSI N45.2.6. Other inspectors from PSI or contractors qualified to Level I may be assigned to the team as necessary. All recording of data shall

  • F be under the direction of the PSI Level II
  -                      Inspector.
 ""
c. Verifice. tion Procedures Construction verification will be performed in accordance with procedures prepared by S&L
 ;;

engineers and approved by PSI Project Engineering and Quality Assurance. These procedures will include acceptance criteria based on specified design and quality requirements.

 =
d. Items of Verification
( The following items of verification will be performed as part of the Construction Verification t Program:

EE

i. Surface Concrete Visible Category I concrete s.urf aces will be visually examined in a systematic manner to identify, locate and document all concrete patches and unrepaired concrete surface
         -                      defects. Formed areas will be identified for evaluation by the NRC where forms are eot to be removed prior to restart.

ii. Reinforcing Steel [ Visible installed Category I reinforcing steel

    "'                          will be examined to determine if placement is
      ..

adequate to satisfy design requirements.

    =-                          Reinforcing bar size, number, and cover are
    ~

items which will be checked. The detail to which these items will be checked will be

       "                         consistent with the st*.ge of installation of reinforcing steel in a particular area.
     . . . _

l III-A-4 1

                                                                                                     ,
             -

__. 1

a

.=                                                                 ?

m- -

+-           iii. Structural Steel
.:

l

                                                                   '

Category I structural steel will be examined to verify that the following items comply with  : aesign requirements. (a) Member sizes, including the detection of pj missing members.

=

(b) Bolted connections including: bolt material, size, count, and tightness, and 75 the existence of correct washers. Torquing of one hundred percent (100%) of all structural joints that had not been previously documented by U.S. Testing Co. will also be tested and a statistical semple providing ninety-five percent (95%) reliability at a ninety-five .-s

  =                     percent (95%) confidence level will be tested on joints that had been so documented. The torquing is as required by specification; a minimum of two bolts per joint to a maximum of ten percent (10%) will be torqued unless a rejection is made, in which case the sample size is increased.
       .
 ~~

(c) A documented visual check will be made to assure member configurations are in accordance with design drawings. h5 iv. Piping and Hangers

= The following items will be examined for Category I pipe and hangers which have been installed:
  "if              (a)   Installation Records (including NDE
   =                     Records) and Drawings (b) Weld Procedures (c)    Visual examination of installed configuration and location E

In a.ddition, a welding inspector qualified as _. Level II under ANSI N65,2.6 will be assigned 9* to visually inspect separate statistical EE samples to provide ninety-five percent (95%) reliability with a ninety-five percent (95%)

  • confidence factor of both completed piping and completed hanger attachment welds.
v. Lirers and Category I Tanks 5 III-A-5
         .
                                                                                . - _ -

_ I h5 * -

    ._

The wald records and NDE reports for tha

                   .         containment liner, spent fuel pool liner, fuel transfer canal and field fabricated Category I tanks will be examined in separate statistical samples to provide ninety-five percent (95%)

is reliability with a ninety-five percent (95%) confidence factor to verify the integrity of these structures. vi. *rerification of Cadwelds

T.is verification consists of inspecting a
 '2 stttistical sample to provide ninety-five peteeht (95%) reliability with a ninety-five percent (95%) confidence factor of exposed 25                          cadwelds. The inspection includes:
           .

(a) A visual check for porosity and

  .;

inclusions in the surface of the cadweld material. (b) A check for recess at the ends of the cadweld sleeves. vii. Verification of Backfill Engineered backfill in Safety Category I areas . EE will be verified by reviewing one hundred 'l percent (100%) of records on testing of backfill to insure that testing was done and nonconformances were documented per specification requirements. A computer plot will be made showing sections at various elevations and locations and results of

testing.  !
1
e. Reports
       -

All data sheets from the construction verification activities will be forwarded to the Project Engineering Manager. The S&L engineers responsible for writing the verification procedures will be

  =

responsible for preparing a report for each item of verification. These reports will be approved by the Project Engineering and Quality Assurance l Managers and submitted to the NRC. 5 3. Nonconformance Review l Subsequent to the issuance of the Confirming Order, PSI ris reviewed Nonconformance Reports issued by or submitted __ to PSI at the Marble Hill site prior to the date of the

   ~

Confirming Order. (As used herein a Nonconformance Report is a generic term including, but not limited to, Nonconformance Reports, Field Corrective Action Requests, and Deviation Control Records.) The III-A-6

            ._
  !
 'E'      '

Nonconformance Reports on file were reviewed by membsrs

  ;_           of PSI's Project Engineering, Construction and Quality
  "-

Assurance Staff. If any reviewer questioned the disposition of a Nonconformance Report, that Nonconfornance Report was transmitted to the Design Control Supervisor Site or to the Quality Assurance Manager for further disposition. A review showed that

5. of approximately 2700 reports listed on the logs, 33
  ~:           reports were not on file. Of these, 31 reports had been voided. Research is continuing to locate the other two reports.

Many of the Nonconformance Reports ahich were sent to the Design Contfol Supervisor Site involved concrete patching. All of the Nonconformarce Reports sent to the

    =          Design Control Supervisor Site have been reviewed by the Design Control Supervisor Site and/or S&L and have been or will be properly dispositioned or will be repaired or dispositioned after the restart of safety-related work.

Except for those Nonconformance Reports associated with concrete work, none of the closed Nonconformance Reports represented unacceptable materials or conditions. The Nonconformance Reports sent to the Quality Assurance Manager for review were mostly due to lack of adequate documentation. These Nonconformance Reports have been reopened and are being reviewed by PSI Quality EE Assurance. Any deficiencies will be corrected. PSI is confident that its revised Quality Assurance Program, as described in Part II of this report, will minimize such c_ documentation problems in the future. E

' "'

It was determined that there was a certain amount of confusion as to the use of the various types of Nonconformance Reports, and that many times inadequate descriptions of deficiencies were included in the Nonconformance Reports. In order to correct this, PSI

   ~
    =          has eliminated some er    m  of Nonconformance Report forms and has simplified oth;rs. In addition, more detailed training and indoctrination is scheduled for all personnel in the future as described in Part III, EE Section C, 1, b, iv of this report.

1 =E

     '=

III-A-7 l

        *
                                                          - _

1 I B. RESULTS OF INDEPENDENT AUDIT Item (2) of Part IV of the Confirming Order is whether and the extent to which PSI has:

E:

Conducted a review, using independent management consultants where appropriate, of the licensee's project management and quality assurance programs to determine whether these are adequate to exercise full control over all aspects of the Marble Hill project, and submitted

  • the results of that review, the recommendations for g

revision to the existing programs, and the schedule for implementing the recommendations.

 ==
1. Selection of Management Analysis Company PSI retained Management Analysis Company (MAC) of San F Diego, California to conduct a diagnostic of the Marble Hill Project. PSI elected to retain MAC for this analysis after making a telephone survey of several utility executives and other executives in industries involved in large construction projects, including members of the Construction Committee of the Business Roundtable. MAC was highly recommended by a number of
 ;=                  those contacted. Fur'ther interviews with MAC revealed that they had performed six previous diagnostic evaluations of nuclear power generating projects and that they had a number of personnel with many years of experience in commercial nuclear power. The MAC teen
  ,

which performed the PSI diagnostic evaluation, i= consisting of 10 people, had a combined 130 years of commercial nuclear experience. On October 2,1979, MAC issued its diagnostic report on the Marble Hill Project,

  -

a copy of which was previously furnished to the NRC. EE

2. MAC Audit and Results
a. Audit The purpose of the diagnostic was to measure the overall quality assurance and management effectiveness of the following organizations participating in the project -- PSI; S&L; the civil / structural contractor, Newberg Construction Company; the piping and mechanical contractor, Cherne Contracting Corporation; and the ele <crical 3

contractor, Commonwealth-Lord J.V. The mar evaluation began on the 20th of August 197' und was L.J

    ~

complete by the end of September. The forsal an

    "~

III-B-1

..
    .::
  • _ _ _ _

k..

. <
                                                                                        ~
report was issued to the management of PSI on
 ?"                 October 2, 1979. The MAC team interviewed over 60 people in the participating organizations, reviewed

,t.. policy, procedure and instruction manuals, examined E the construction site a number of times, visited

 "                  the replicate base plant (the Byron project) and physically examined receipt inspection, g_                 engineering, and quality assurance documentation,
 =;                 both at the Marble Hill site and the General Headquarters of PSI. The MAC team spent g                  approximately three weeks evaluating the interview
= notes, the written material that it had collected, and the observations from its visits to the construction site and produced and reported on
 . . . ...
  .:.:

October 2, 1979 an evaluation of the situation at

 "                  Marble Hill.
   "
b. Results The Category I concrete problems that led to the suspension of construction were primarily a result of insufficient commerical nuclear experience within PSI and its contractors. The concrete problems primarily involved workmanship. It was brought to MAC's attention that at that time the
        '

inspection and technical analysis of existing concrete was underway to determine if there were any significant safety problems. After necessary

.f6                  repair work has been defined and carried out under the guidance of experienced and qualified
'b                   construction and quality assurance personnel, the plant should meet nuclear standards. The existing personnel, when supplemented with sufficient experienced personnel and more effective management tools, can in the future manage and complete the

_ '5 ~ Marble Hill Station within a reasonable time and at a reasonable cost. 55 The MAC review resulted in numerous general and specific recommendations which were intended to g.:. improve the overall management and control of the project, as well as the Quality Assu- ce aspects ' of the job. The disposition and thu .nedule for - implementation of each recommendation is presented below.

    =
3. Revised Project Organization The major recommendations made in the MAC report were to reorganize the project to provide additional management controls, to provide additional experience in the d= organization, and to relocate certain functions to the site. The new organization is shown on Figure B-1.

Relocation to the field was completed on January 7, 1981. 111-B-2

                                   ._,         . .            . _ .           .

9

                 -
7. . .
  =

k ~ In order to establish the additional experience in the field organization, an integrated organization was , . developed. Selected critical positions either have or ,:;. will have both a MAC and a PSI individual in the job. U The initial experience, and the direction of the specific function, will come from the MAC person. 'E- Because PSI would have a difficult time obtaining, on i= short notice, the numbers of experienced people that are required, PSI contracted with MAC to obtain qualified

         -

people to place on the site as quickly as possible. MAC 1..

  ~

has been able to collect highly qualified and experienced people at the site, and they are already ,. functioning in the critical areas of project management , 'M and quality assurance. These people will direct the

                                                                               '

work of. individual functions as required by PSI and subject to PSI's ultimate authority. They will assist

PSI in the implementation of both a restart plan and an
= overall project plan. They will train PSI personnel l and, as PSI obtains the necessary experienced and I
  -

qualified personnel for its own staff, the MAC personnel will depart. This phase out will be accomplished in a , manner such that the quality of construction management )

  ,,..             and the quality of the project will not be endangered.      ;

,E ' PSI expects that full. phase out cannot occur before a year's time but should be completed within a three year


period. The NRC and Authorized Nuclear Inspector (ANI) will be notified prior to release of such contract

       . . .       personnel at supervisory levels.

The reorganized Marble Hill Project offers several

= advantages which will improve the overall management of the job. An experienced Project Director, reporting
   ...
   ~~

directly to Vice President - Electric System, has been

       '

provided to coordinate the varied aspects of the job. An experienced Quality Assurance Manager with construction experience has also been provided. This i manager is located in the field and directs the Quality-E Assurance aspects of the project. He reports to the Vice President - Electric System independent of other project management. Additional details of the Quality

       -

Assurance organization are discussed in Part II and Part j III, Secticns C, E, F, G, and H, of this report. An experienced Construction Manager has also been

;                   provided. This individual is responsible for
construction activities and will have reporting to him
u
  • experienced Area Managers for turbine building,
  • auxiliary building, containment building, and general facilities. The major emphasis of the construction group will be planning of work with contractors.
'

Additional supervisory positions have been added and additional experience is being provided as noted in Part III, Section C, of this repor .

.- 111-3-3

               -
                              .-        ,      . .  - -    -        .

__

       .     .

i:: t=

E5 A position of Project Control Manager has also been
  

established and experienced personnel are being

  ,.     .          assigned. This individual will be responsible for the Tj                integrated project planning, scheduling, and cost
  ';                development efforts and provide cost and schedule support to the Area Construction Managers.

'jE Additionally, the Project Control Manager will be

Ei
responsible for the material management program which is.

intended to assure proper handling, storage, and t_: maintenance of equipment and materials on the job.

4. Schedule for Implementing Recommendations
                                     ,
  'I                The MAC diagnostic made a total of 52 recommendations, both spe.cific and general. The resolutions of each of these recommendations, and in the appropriate cases the schedule for implementation, are presented in the
   =                 following material.
. _.
t
   =

t: _fE i~

   ?=
' hi
   .z
   =

, , . . .

    =

i

    =,
    =
    =
    =                                                                            1 l
1 1

1 III-B-4 '_.

                                                                                 <
               *

"

           .                                                                     !
                                                                                                               ,ili   .!!'       !!!   li      !!!"
                                                                                                                                                     '   '

Wi i! ih "Ti

                                                                                                                                                                             ~
                                                                                                                                                                                             'gj  gigi    jli!!ll yh     ;qg    jipg
                                                                                                                                .
    .

RECOMMENDATION RES01-UTION . GENERAL RECOMMENDATIONS These general recommendations are positive steps that PSI can take which will assist in improving the timely and cost-effective construction of the Marble Ilill Generating Station with the requisite quality. These are based on MAC's assessment of Marble 11i11 and are as follows: A. Changes in Project Management A Project Manager should be established for Completed. (See Figure B-1). Personnel for both Marble Ilill reporting directly to the Vice Project Director and Quality Assurance Manager are on President-Electric System. lie should have all site. activities reporting to him with the exception of Quality Assurance. It is also recommended that a seasoned Quality Assurance Manager be hired for g the Marble 11i11 Project. U ' j, - B. Quality Assurance di Restructuring has been completed. (See Part III, It is recommended that the Quality Assurance organization and program be restructured and Sections C, E, F, G, and 11, of this report.) staffed with experienced personnel. The Subsequent evaluation has indicated a need for objective is to provide a " hands oa" QA additional personnel. Recruiting additional people management team that is structured to emphasize is underway. A PSI Quality Assurance Manager and the importance of preplanning of activities to Manager Quality Engineering have been hired and will maximize problem prevention. Present staffing report approximately mid-March, numbers at the requisite experience levels are more than adequate to operate the QA function effectively. ,

                                                                                                                                                                                                                                       .

_ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _

m ::t -b+ in.H . . . ni :m, o. i .c "

                                                                                                                                 -m   -            -
                                                                                                                                                           !;s
                                                                                                                                                           . . . n. :ii1 ' - U. . ;. mG ~.;Tr",

e

                                                                                                                                                                                                  ';i-t
                                               ,
                                                                                 -
r m. m.  :
                                                                                                                                                                   .
                                                                                                                                                                                                   .
                                                                                        .
   .
                                                                                                                                                                                                    '

RECOMiENDATION RESOLUTION GENERAL RECOMMENDATIONS C. Experience and Staffing Levels Specific areas in the project organization have Personnel for Project Director, Construction Manager,- been identified as needing increased staff. Quality Assurance Manager, Project Control Manager, and Experienced personnel must be brought into key Project Engineering Manager are in place. (See Part positions to strengthen the project team. This III, Section C, of this report.) can be accomplished by hiring key personnel in certain areas and by supplementing existing PSI personnel with experienced consulting support personnel on an as-needed basis. D. Management Focus Due to the significance of the Marble Hill Completed. Monthly or more frequent meetings are being project to the overall financial picture of PSI, held. Critical items list has been developed. g it is recommended that the President and Vice , M President-Electric System attend a monthly site i meeting that focuses on overall project status, a definition of problems, and establishment of a key action list. E. Centralization of Activities at the Site There is a need to relocate some forces and Personnel relocation completed as of January 7, 1980. functions from the headquarters offices in Plainfield to the construction site. This need is primarily in the areas of cost and schedule, inaterial control, document control, contract administration, and Quality Assurance / Quality . Control. 1

 - _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ - - _ _ - _ _ _ _ _ _ _ - - _ _                          _ _.
                                                      ;;
                                                           '        '

j;; ':0 igim j!!u!' ;;!pir j;- in !!!!!!!  !! !!! !!: lH i! iiHi!!

  .

RESOLUTION . RECOMMENDATION GENERAL RECOMMENDATIONS F. Bryon Liaison It is recommended that the benefits of the Liaison has been established; evaluation of a permanent replication approach be emphasized through the assignment is progressing. assignment of key personnel at the Byron site to , provide early information on any problems and the as-built configuration. G. Activity Integration A project of this magnitude and complexity .cgration of cost and schedule has begun with the requires closest coordination and integration to decision to utilize the PREMIS program as the minimize cost and schedule. It is recommended scheduling resource tool. Computer hardware support l that the use of a scheduling resource tool such has been on site since December. Initial data input as the PREMIS program (presently in existence at began in January with preliminary output reports PSI) be expanded to utilize its full capability integrating cost and schedule to be available by in integrating the activities of PSI, S&L and March. Revisions to the material management program, r, U major Contractors. Additionally, it is including modifications to Purchasing, Inventory, and ds recommended that the material management program Expediting system (PIE), are currently under as presently structured around the existing PIE evaluation. Revisions to PIE began in January. 4 system be further expanded and developed into a

                                                                                            .

more effective management tool. ., 4 _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _

                                      !!!U
                                            '

iin q!H +

                                                                    ,

d H i' '

                                                                               "  % J P'
                                                                                                       '  '

m

                                                                                                                      '
i I W!!!! !!!Pii, vili-'
                                                                                                                                            ~
                                          .
     .
                                                                                                                                            ~

RECOMMENDATION RESOLUTION CENERAL RECOMMENDATIONS 11 . Financial Controls and Management Reports Financial controls associated with contractor Existing financial controls associated with contractor change orders and contract administration should change orders are being evaluated to determine what be improved. It is recommended that a full-time changes are necessary. A PSI auditor has been assigned financial auditor be assigned to the site. An to the site. Contract Administration is being staffed. evaluation should be made for potential Improvements to document control and design change improvements in management reports, document control have been made. Management reports are being control and design change control. developed. I. Effective Use of Fixed Price Contracts The fixed price approach utilized by PSI has An organization chart has been developed along with a solid merit for controlling costs. Fixed price staffing plan for the Construction Contract 3 contractors tend to place their best personnel on Administration section. This section reports to the Q the job and labor tends to be more supportive. Construction Manager and will include the following

       .E                    To derive the maximum benefits of the fixed price   classifications: Construction Contract Administrator, E                    construction contracts in the environment of        Contract Administrators, and Contract Coordinators. The constant change, PSI should investigate breaking    Construction Contract Administrator is scheduled to be down the scope of existing contracts into smaller   in place in February. Additionally, this effort will be elements and aggressiv-ly monitoring them at the    supported by Project Control through the establishment site by more experienced personnel augmented by     of the project Work Breakdown Structure (WBS) and the contracts administration people. Significant     integration of cost and    schedule to provide a basis for nuclear experience in contract monitoring and       effective monitoring of   contract progress. (See Part administration is a necessary ingredient to         III, Section C- of this    report for the Construction 1:andling changes and minimizing cost and schedule  Contract Administration  Organization.)

impacts. A larger staffing level is required to effectively accomplish this. . _ _ _ _ _ - _ _ _ - _

                                                         
          

M !ii; ii;ii! Hi

                                      '        '    '          .p   U      i;
                                                                              '
                                                                                  !!!!!'   'in i i   Ili?": f!!!n:' ' iii!!I         il

.

                                                                                                                                     .

RECOMMENDATION RESOLUTION SPECIFIC IMPI.EMENTING RECOMMENDATIONS In order to derive maximum benefit from the general recommendations, the following specific implementing recommendations are suggested: A. The Project Manager's effectiveness can best be Organization is in place as shown in Figurt'B-1. maintained with an organization such as shown in Figure 1, Project Management Organization. B. The functions of contractor administration and Functions have been created and are being staffed. project auditor should be created and staffed Project auditor is on-site. Contract Administrator is with suitable personnel on site. PSI project on the project; augmentation of his staff is progressing. financial reporting practices should be reviewed and appraised with respect to adequacy to meet management's need for appropriate information for [ decisions. T . j' C. Activity integration can be best achieved with

  • the following steps:
1. Revise Master Schedule, validate and A Master Schedule is being developed.

integrate Engineering, Materials, Construction and Startup.

2. Put CRT's and printer in field. Thecost/scheduleprocessorhasbeeninsta51edinthe field as of December 1979. Five Cathode Ray Tubes (CRTs) and one printer are currently committed for PREMIS/PICOM use.
                                                                                                                    .      .. , _ _
                                                                                                                                        "
                                            #               !!
                                                                '
                                                                      ~!!P               !!!bi           !!!!!!! ii?lii!    '!!h:   !!!
                                                                                                                                          ~~

i!!i :i '!!; !Nii[ i!!;' h d!" OIIE " ;I %i! tot

                                                                                                                                                                                                          .
                                                                                                                                                                                                            .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

3. Establish area system of controls. The establishment of mid-levels of project WBS identi-fying area monitoring elements has been completed. In
                                                                                               -

addition, Project Control has identified "sub" organizations for Area Project Control consisting of area cost engineers and schedulers.

4. Combine the cost system with PREMIS. PICOM, a cost processor, was procured December 3, 1979.

PICOM/PREMIS are compatible programs and will combine via a WBS approach. The project WBS is currently being designed.

5. Outline specific management reports. Marble 11111 will initially use the standard PREMIS/PICOM Reports. Should a special request require additional reporting capability, PREMIS can easily be modified to ro accommodate this request.

U E 6. Develop a six-month action plan. (See An action plan has been developed. (See Section E.10 Section E.10 be' low) below). h

                                                     .
7. Redefine the weekly coord* nation meeting. Weekly coordination meetings are being held; appropriate control guidelines for these meetings are being developed.
                                                                                                                                    .

9 ) 4

 - _ - - - - - - - - - - - - - - - - - - - - _ _ _ _                _      _ _ _ _ _ _ -         _____. __               _.
                                                                                                                                                                                                               /
                                                                                                                                                                                                         ;Ui:lil        '" ~

Hi 4 y;;

  • iiili; iii HH i ! !!!' O U!
                                                                                                                      '
                                                                                                                           ~ in              '!! Di ;!!!            '!!!'            iii   l!UU !H!!!!
                                                                                                                                                                                                                         .
                                                                                                                                                                                                                       .
                                             .
                                                                                                                                                                                                                         -

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

8. Transfer the PIE is currently being analyzed by the Material Procurement-Inventory-Expediting (PIE) Management Group. Modifications to PIE are dependent on system to the field and integrate with the project WBS. Steps are currently underway to PREMIS. Revise PIE procedures to make it operate PIE on an interim basis until modifications to more useful. PIE have been completed. The direct integration of PIE and PREMIS is not planned at the present Lime; however, the utilization of PIE will be coordinated with that of PREMIS.

D. Because of the importance of the Marble Hill Risk analysis is currently underway. project to the overall financial picture of PSI, risk analysis appraisals should be initiated by PSI management. These appraisals would be initiated by a revalidation of cost and schedule s activities using probabilistic techniques. Based [ on those results, a series of contingency plans 5 should be prepared for a series of possible total

1. costs. The impact of the proposed Capital Cost

' ~ Recovery Act should'be included in the analysis. Likewise, a series of contingency plans should be prepare' for delayed startup dates as indicated by the risk analysis. E. In staffing and developing the project , organization, the following issues should be ' considered:

1. PSI should continue its re-evaluation of The following changes have been made in the overall salaries for project personnel. PSI should compensation plan:

consider revising its overtime policy and special site pay (relocation and/or per (i) An overtime pay policy for exempt employees has diem) for exempt personnel who are required been instituted. This plan is intended to to work extended overtime because of address non-incidental overtime needed to conditions beyond their control. complete the regular duties of a position. Such overtime normally occurs on a construction ' site like Marble Hill. ,

                                                                                                                                                                                         .

< _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _._ _ _ _ _ _ _ _ _ _ . _ v e e 1 9 4 4 1 1 ' O I T * * *M I U I I ' I'I ' U f

                                                                                                                                                                                                 ~

_ 'E__'__ ~_~___'_E__ _s

                                                                                                                      '  ';i:;?          {'i i'
                                                                                                                                      -
                                                                                                     '

i " "' n inli!! ;3 n g: ;t l! - '  ;{;jl

                                                                                                                                         .
                     .
                                                                                                                                            ~

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS (ii) A shift pay program has been instituted for exempt and semi-professional employees assigned to the Marble 11i11 Construction Project. This program is intended to address

                                                    '

sporadic shift work which typically occurs

                                              ,

during the construction and startup activities of a large construction project. (iii) An additional construction site pay allowance program has been revised and extended to include all non-bargaining unit employees assigned to PSI station construction sites. (iv) A comprehensive relocation expense allowance program has been instituted to address the special circumstances involved in relocating employees to the site. (v) PSI exempt and semi professional employee

               $s                               '

positions have been re-evaluated against an d- industry survey of salaries and adjustments

               "                                                                       were made to match industry practices.

The above changes compensate PSI construction and site assigned employees for the additional demands of field

                                                                   ,        construction work and allows PSI to be competitive in attracting and holding the experienced employees needed to pursue the project.
                                                                                  .
                                                                                                                    .
                                                                                                                                                ,%

- - - - - - - - _

                                                                                                       , ,        ,             ,,,,..p.
                                                                                                                           '              *
                         ,

m lig !H! :i; h 1l

                                                                                                                             ?!   '.m
                                                                                                                                            "!
                                                                                                                                               !!!!~
                                                     .
                                                                                                                                               .
                                                                                                                                                 -

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

2. MAC believes that the major effort of the The Construction Management Organization has been Construction Engineer should be in the reorganized to incorporate the area concept of preplanning of the work with the management and separate contract administrators. This contractors. The purpose of this plan is to separation of construction management and contract identify potential problems, interpretation administration allows the construction engineers to of requirements, control points, etc. This devote their efforts to preplan the work with the permits a unified approach which is contractors and identify and resolve potential problems.

beneficial to all concerned. The area team must be intimately involved with the Construction Contract Administration personnel will be contractors and should look ahead to assigned to each area to follow the daily construction minimize problems, activities of the various contractors to verify compliance with the terms and conditions of the specifications and purchase orders, drawings, safety requirements and project rules and regulations. The s area concept is being impicmented for the containment p huilding, auxiliary building, turbine building, and E general facilities. (See Figure C-5.) J. .

                       "
3. liard drawings, ' specifications and reference A reference library has been established as part of the
                            -

books (codes and standards) should be more construction management trailer offices. liard copy readily available to the PSI construction drawings, specifications and references are maintained staff. there by Document Control.

                                                                                                                                            *
                                                                                 .

e

                                                                                                                          .

. . . _ . _ - - _ _ - -

h !l  !! u!Ui! i! ,  !!!! !!!!!! [i, , q !i n.; p m' jpii;

  • 4
                                                                                                                          !!Hi    jy r
                                                                                                                                    '
                               .
                                                                                                                                  .
  • RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS
4. Improved formal and informal routine Home office project personnel have been relocated at communications must be established between the project site to improve communications. In the PSI site and home office. Reports addition, PSI senior management visits the site weekly.

should includ'e a "look ahead" aspect in addition to "where we are" and "this is what The basic philosophy of the newly-formed Project we have done" approaches. The reports Control Organization is to provide timely information should include overall project status, to the appropriate individuals to support effective quality trends, significant events, decision making. The establishment of a project work potential and actual problem areas and their breakdown structure, work packages, and the integration recommended or completed' resolutions, along of cost and schedule, coupled with PREMIS/PICOM, will with responsible personnel and timetable for provide the capability to evaluate performance to date resolution. and project the impact of this performance on cost and schedule. The Quality Assurance Program provides management with quality trend information and a listing of action items. U Training / Indoctrination program is currently being

                                                                                                                                         '

7- 5. There is a need,to train everyone on the job y in his area of performance and on the designed. It is scheduled to begin in February, 1980. ' 7 necessity of a commitment to quality. This That training required to support a specific activity ' includes personnel such as clerks, will be in place prior to start of that activity. (See pipefitters, junior engineers, and managers Part III, Sections C and I, of this report for further and should be done in a manner which will information.) improve their effectiveness. It is . suggested that a formal training and indoctrination program be given to each employee before the site is started up and then on a continuing basis.

                                                                                                    '

!

                                                                                                                                      --
                                                                                      ,,    ,, , ,m         a., . . . . . . - - -
                                                                                   "'                  !! ;i!-

i

                                     "
                                                   !!-  -      ~~i'                       iig                    !# !!!'     !!~
                                                                                                                           .
     *
                                                                                                                             .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

6. A Material Controls organization should be A material control organization has been establsihed established on the site under the PSI under the new project organization and is presently Coastruction(lanagement organization. This being implemented, organization will handle all procurement, expediting, and materials problems associated with Marble 11i11. After the purchase order is issued, the responsibility of the control of the material should rest with this organization. It should provide total control of the material including documentation, equipment quality verification, storage, preventive maintenance and vendor payment releases.

All construction Contractors should identify specific PSI supplied material requirements U for work packages well in advance of the T construction activity. Material schedules T should be updated and maintained current. C The present system should be expanded to

   -

incorporate all material and equi pment brought on the site. The program should be expanded to include construction and startup spares and have provisions to add operational spares. Institute use of PIE in the field with the use of CRTs.

  • i a
                                                                                                      %

4 i

._ . i![ + !_ .j- ai! );; i ' ;i- ni i iin ' !!!!; --- A 4 T'iii i: P inii :iiUii gg ju

                                                                                                                                                                    .
                                                                                                                                                                  .
                                                                                                                                                                    .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

7. Due to the volume of changes, it appears The Construction Contract Administrator organization has contract administrators should be assigned been established and is being staffed. The Contract to each contract to administer changes in Administrator will provide the necessary support to the the field. . Arrangements should be made construction organizations. (See Part III, Section C, which improves PSI control over changes. of this report.)
8. PSI should initiate a study of the design change system with particular emphasis on the following:
a. Use of a single design change form for Simplification of forms has been accomplished as part of field generated changes regardless of the revised Quality Assurance Program.

whether they originate with PSI or contractors. H H y b. Utilization, if possible, of the PSI-unique form will be used as specific organizations o' existing form employed by Byron such need to be addressed in the use of the form. g that approved Byron changes can be utilized directly on Marble Ilill.

     .

Establish a project planning and scheduling This function has been established and is operating as a 9. control organization in the field which part of the Project Control Organization. includes the functional elements of Planning, Scheduling, Cost Engineering, Estimating, Data Management and Material Control.

                                                                                        .

9

                                                                                                                                         %
  • w ++ +0.o e++one mo e c e e e ee ge r y y e estett *g ? e  ; *
                                                                                                                               '
i!! Hju ipi!I i;~~
ii li ' 4 ii r liii :I il m il !i i!!!L !L
                                                                                                                                                        .
                                                                                                                                                           -

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

10. Develop an immediate interim plan which will An interim action plan addressing these issues in carry the project for the next six months appropriate levels of detail was developed and while the detail staffing, planning, implemented as the mechanism to status and control the schedule and controls are established. The progress of these activities. Longer range plans interim plan should deal with such issues addressing these issues in detail have been or are being as: organizational structure, personnel developed and implemented on a priority basis, assignments, site facilities, construction restart (including analysis of existing concrete and any necessary repair work),

re-inspection of safety-related work as necessary, project procedures and controls, cost and schedule estimate and risk analysis, material control systems, Byron liaison, NRC reviews, a total long-range project plan, and executive reviews.

 "s                                                                                        The Project Management Manual (previously called the 7                 11.               The restructuring of the site organization j' .                                with appropriate definition of job authority          Construction Management Manual) is being rewritten in will establish clearer lines of                       accordance with the recommendations.

[ - responsibility and authority, and eliminate the present duplication of QA/QC functions and construction engineering function. PSI should rewrite their Construction Management Manual and clearly define the goals a,nd objectives such that they are structured and provided with the necessary procedures to control the project without duplication with QA/QC, Responsibilities should be clearly establsihed for processing of changes, planning / scheduling, contract administration, material management and engineering. F. The required improvement in tSe Quality Assurance organization and programs would be enhanced with the following specific recommendations:

                                                                                                                                 .
                                                                                                              ,,,,,          ,                 _,

- - - . - - _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _._

'~

        "              -

m !gg ;r 5

                                               '  -
                                                      ;t:u   g      *   '

og pt 4 -

                                                                                                                                    .
                                                                                                                                       .

RESOLUTION

                                                                                          -

RECOMMENDATION SPECIFIC IMPLEMENTING RECOMMENDATIONS

1. Reunite the Quality Assurance and Quality Completed. (See Part III, Section C, of this reppet Control functions under one qualified for Quality Assurance Organization.)

manager locate,d at the site. A suggested organization is shown in Figure 2, Quality Assurance Organization, of the orginal MAC report.

2. Review and assure understanding of the PSI This item has been addressed as a part of the revision Quality Assurance charter and its role of to the PSI Quality Assurance Program and Manual.

conceptually managing the quality assurance efforts of the A/E, NSSS suppliers and on-site contractors.

3. Establish a program for formai QA on-site This is a provision of the revised FSI Quality s review of contractor quality programs. Assurance Program.

s

4. Provide guidance to contractor organizations This is being accomplished through ongoing meetings and 1 - in quality achie.vement, but neither preempt reviews of contractors personnel, work procedures,
  "                   nor relieve contractor responsibility for       training programs, and periodic evaluation of
  • achieving and verifying the quality required performance, under the contract.
5. Clearly define the uninhibited authority of This is a part of the revised Quality Assurance PSI Quality Assurance to stop the . Program. (See also, Part III, Section F, of this performance of unsatisfactory work. report.)
6. All NRC - exit interviews should include key This will be pursued with the NRC as issues relative to contractor personnel involved in the audit. a given contractor arise where such participation might be beneficial.
7. QA/QC manpower ceilings should be maintained A staffing plan has been developed to provide Quality
                    -

at their current level except for a planned Assurance / Quality Control manpower. Contrary to this program of upgrading personnel to achieve a recommendation, higher levels of manpower will be greater experience level. required.

                                                                                                          .
    -         - - -      -                              --     ----                  _

__

                                                                                                     .          ,    _ _ ___ - m... ,,. %
                                                                                                                                                                             ' " - "

ii :i; * 'i; d; lii' si >  ;;  !!! i: 4: !i

           !                                                                                             ,
                                                                                                                                                                              .
                                                                                                                                                                           .
        *
                                                                                                                                                                              .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

8. As QA manual sections and procedures are The PSI Quality Asaurance Manual has been rewritten and revised to reflect changes brought about by simplified, reorganization and by reactivation of Category I construction, include as a goal the simplification of procedures and provision of clear definitive instructions on how PSI Quality Assurance performs its work.
9. There is a need to have piping isometrics This item is under evaluation.

reviewed by the A/E to reduce the possibility of errors in A/E drawing interpretation, errors in installation, interference, snubbing and support. g Consider requiring the piping fabrication y and installation drawings be reviewed and 4, signed by the A/E for conformance to J. design. Determine by surveillance and audit

  • that such reviews ans' approvals have been made.
10. PSI Quality Assurance should review with Recommendation is being implemented, contractors their procedures for preparing inspection planning and checklists to assure that adequate definition of accept / reject criteria is provided and to assure that the completed document will be satisfactory for a quality assurance record, including identification of the inspector and verification that required quality was ,

attained.

                                                                                                                                                         .
                                                                                                                                                                , , , _
                      -     - - - - _ . - - _ . _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _             ,  ,      ,  ,  , , , , , , , , , , ,
  • si: illi N
  • iiir '
                                                                                                                    !!
                                                                                                                        '
                                                                                                                                     $   "

mit mpi j;;in; I-

             .i!                                                                                       ,
                                                                                                                                                                               .
      .
                                                                                                                                                                                 .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS tl. Establish a centralized document control at The site Document Control has been established and is the site with the responst vility of located in suitable facilities. New equipment for receiving, distribution, and dispensing all storage and reproduction has been delivered to the technical project documents, and for site. A majority of the S&L drawings have been assuring that proper reviews and approvals delivered to provide a base and to back-fit site files, have been accomplished prior to release for Procedures will be implemented covering the controlled identifying proper drawing and specification issuance and review of project design documents. status for assuring, through a receipt mechanism or similar process, that the correct revision has been distributed to and received by the using organization.

12. Establish a manual filing capability for QA Quality Assurance records will be filed at the site.

records at the site. Identify required Checklists are being prepared to identify required [ quality records and establish suitable quality records. Microfilming will not be postponed but will continue after documents are processed initially. 7 controls to assure their adequacy upon T receipt or completion and their integrity, These fiche will constitute the plant records. E! ' safety, and scourity. Postpone the microfilming of QA records until af ter plant

    ,

acceptance.

13. Utilize the current lull in construction to This effort is in progress.

evaluate all record packages where the hard copics have been destroyed to determine if there are any documents that are not clearly readable when reproduced from microfilm / microfiche. Initiate a program for the replacement of any such illegible records while supplier / contractor originals are still available. .

                                                                                                                                                          %
               - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - - - _ --
        
            ;!d!!i      ' !! !!       iiii:!!! hiliti! !!!;: .c :i i  ,  ,

W  !!!!11  !!d ll ' ' II' i:.i

                                                                                                                                                                         .-
                                ,

, *

      *
                                                                                                                                                                         .

RECOHHENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS

14. Discontinue the practice of enhancing The practice of enhancing contractor documents has been contractor documents for reproduction discontinued as of August 9, 1979, by Quality Assurance purposes. Require prompt replacement with Records Reviewers. Replacement of documents that are acceptable reproducible documents.
                                  ,

not of microfilm quality has been initiated.

15. Initiate a program of interfacing with other Determination of Quality Assurance / Control hardcopy utilities or with records managment experts records storage and required facility requirements has to determine staffing facility and equipment been initiated and will be in accordance with ANSI requirements for document control and N45.2.9 and other applicable codes. Engineering records storage. Document Control has been organized as part of Project Engineering at Marble Hill. Other utility engineering document control programs have been evaluated and the procedures to be used at Marble llill are being developed utilizing this input.

U Personnel currently on-site with experience in records 7 management have evaluated the PSI corporate records Y. ' system. As a result, the compilation of permanent M records will continue to be accomplished utilizing the

    -

PSI microfilming system. The capabilities of the basic system allow for any molifications which may be identified to improve filing and sorting requirements.

                                                             .

J 9 9 d 1 4

                                                                                                                                                *****w"*-*

e + ea e e s- e oe eteei s t t ? ?*1 g g = - aI*** ___

                                                                           '                                        id!h!  tiiIUI
  • llil  !!!
                           '
                             !!bi   !!UF    <        .ili la     iin li                 1!:     if     m
                                                                                                                                    .
                                                                                                                                  .
        .
  • RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS
16. Reassess the storage program with assigned A storage maintenance program is being implemented under responsibility for a storage maintenance Material Management Section. Project Engineering is program. Exp.edite receipt of component providing explicit storage maintenance requirements, manufacturers' instructions for storage Quality Assurance is establishing a surveillance program maintenance. Institute a QA surveillance based on those requirements.

program to assure requirements are met.

17. Establish an on going program of reducing The cognizance of quality problems will be achieved all significant problems to a QA action through the re-establishment and use of a quality list. The review of the action list should trending program. (See Part II of this report.)

be an important adjunct to weekly QA meetings, with schedules updated and The trending report provides a listing of open items referrals made to appropriate levels of including nonconformance reports, corrective action [ management to accomplish the action. The reports, and audit findings which provide an action item 7 key objective is to retain cognizance of a list for the Quality Assurance Manager relative to D' problem until it is finally resolved, quality problems. s> . p .

18. Establish the quality trend analysis program The cognizance of quality problems will be achieved
      '

as an integral part of the management through the re-establishment and use of a quality information system, trending program. (See Part II of this report.)

                                                                 .

e i

                                                                                                            .
                                                                                                                            .         . _
  • i; !!!!  !!!"!!  !!! @ hi ll Ulh! IF H .;l:. ihi ii "!ii  !!P' ~  !!N '
                                                                                                                                      .
      *
                                                                                                                                           .

RECOMMENDATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS G. Contractors

1. General -

Prior to a restart of safety-related work on This contractual review has been partially completed. Marble Hill, two actions should be taken ' with respect to the contractors. A general Commitments to the Quality Assurance Program are review of contractual commitments should be satisfactory with the exception that the implementation made to define in detail the commitments of of stop-work authority in some instances is not the contractors to implementation of the QA sufficiently defined. Contractors are being directed to Program. This should specifically address make the necessary corrections. staffing levels, qualifications and number and level of work instructions required to Review of contractor's staffing levels, qualifications support the crafts. An in-depth quality of personnel, and work instructions is being conducted. [ assurance audit should be conducted on each Where deemed inadequate, the contractors are being 7 major contractor to evaluate their overall directed to correct these inadequacies. T QA programs.

 '

d - Quality Assurance audits on U.S. Testing, Cherne, and

    '

Newberg have been completed. U.S. Testing's audit reply with corrective action will be completed in February. Cherne's and Newberg's audit replies have been completed. Some of Newberg's audit items remain open and are being evaluated. Cherne's audit reply is

  • satisfactory.

Prior to start of receipt inspection activities, audits of staffing levels, qualifications, procedure preparation and training relative to receipt inspection activities will be performed by PSI. These audits will be conducted on each site contractor and subcontractor receiving and inspecting safety-related items in order to verify readiness to commence receipt inspection in compliance with PSI commitments.

In addition, audits of site contractor and subcontractor Quality Assurance programs will be conductegt to assure that the Quality Assurance Program of each site - contractor and subcontractor is acceptable prior to unrestricted release to perform safety-related work.

                                                                                                                                             ~
                                                                        ,           ,     .--m..         e   w e -o etw+v tt   r  + ?
  • t-

ih: M* "%  !:' in

                             '

lli!!!

                                            '

41; li"" ~iii :q g!!: pj 1;U

                                                                                                                   

liiPii M it

                                                                                                                                                     .
  • RECOMMEt1DATION RESOLUTION SPECIFIC IMPLEMENTING RECOMMENDATIONS
2. JJewherg As a cesult of the contractual review and 1. A joint review of work procedures has'been audit noted above, a determination of action initiated between Newberg and PSI Construction items required prior to restartup should be Management, Project Engineering, and Quality made and documented. The action list should Assurance in accordance with priorities necessary include all QA requirements as well as any to start work.

additional project management requirements and should be pursued in weekly meetings 2. A program is being initiated to requalify welders which include the Project Managers and QA and cadwelders. Managers of both PSI, Newberg, and MAC recommends that Newberg continue to acquire 3. Quality Assurance and Quality Control personnel supervision with nuclear experience and staff is being increased. New personnel have provide additional training in placement of been added and are being trained for Level II s Category 1' concrete. This program must be qualification. A Manager of Power Construction M expanded to develop detailed training for has been added to the organization reporting to E crafts personnel in areas for which they are Newberg's Vice President, and is assigned full 6 going to participate in the placement time to the site. A new labor Superintendent has " activities, been assigned and a new Project Manager is in

     '

place.

4. Concrete placement crews are being trained prior to placements in the specific requirements of
                                                        .              cach work procedure.
5. Newberg will utilize PSI training media relative to the importance of quality, the uniqueness of the Marble liill facility, the importance of Title 10, Code of Federal Regulations, Part 21 reporting and the capability of reporting quality
3. Cherne and Commonwealth-Lord p'roblems without recrimination.

Cherne and Commonwealth-Lord QA programs Cherne and Commonwealth-Lord will be monitored were looked at in detail. With the closely under the revised Quality Assurance Program. exception of the review and approval problem associated with Cherne isometric drawings, there is not a notable QA problem. These contractors should be monitored closely, however, as they are in the early stages of , program implementation. _ . , , . , , , ,, m , , _ . ~ . . . , . . . . .

                                                                                                   . ,.   ,c-.   , . _ _ .

n ,

                                                    -
   -

o . n

                                                                                                               .

VICE PRESIDENT ' ELECTRIC SYSTEM PROJECT PERSONNEL DIRECTOR

                            ..
             -
                                                        ,
                          . . _ . .

VICE PRESIDENT A U iE PROJECT DIRECTOR'~ ENGINEERING CONSTRUCTION tiANAGER = T T u PROJECT PROJECT PROJECT CONTROL

               . CONSTRUCTION                                          "        "

ADMINISTRATOR MANAGER MANAGER y a

                                           .
                                                               .

REVISED PROJECT PUBLIC ORGANIZATION SERVICE INDIANA FIGURE B-I - AS OF 2-80 _ _ . .

                                                                                                ,

e9+

            *
=.

C. DESCRIPTION OF STAFFING AND QUALIFICATIONS

#

Item (3) of Part IV of the Confirming Order is whether and the extent

        ,

to which PSI has:

                                               .
 ' I                 Described the number, qualifications, and experience of the Licensee's quality assurance, quality control, and engineering Ef                  and construction management- staff broken down by construction

, $; activity, the degree to which contract staff will be utilized for

                                                                                             '

these activities, and the relationship between the quality

 ;;

assurance and quality control staffs and their responsibilities. As identified by the NRC and in the MAC diagnostic, the major cause of the construction difficulties was lack of nuclear experienced '= ' personnel. This section addresses PSI'm staffing and experience levels as of June 1979, the date of the first cessation of Safety Category I work, and the plan to upgrade both experience and numbers of personnel to the point where safety related work can be resumed in _ accordance with 10 CFR 50, Appendix B, and better overall management control can be provided. PSI has also determined that, in order to add additional assurance of the overall quality of the construction at Marble Hill, it would be beneficial not only to increase the experience level of its Quality

   ,

Assurance Organization, but also the experience level of its project

G staff. PSI also determined that this overall experience could most effectively be utilized through a restructured organization. A brief E description of the project staff, as reorganized, as well as a

'! discussion of the project staff's experience level follows:

   =           1. Personnel Plan t=
                                                                *
a. Prior Organization
   $                       Prior to shutdown, the PSI organizations were as shown on
Figures C-1 and C-2. Prior personnel qualifications are shown on Tables C-1 through C-4.
    ;:-

59 b. Plan to Correct g i. Reorganization With some minimal changes to meet specific job sitc

     ._            .             requirements that have been encountered, PSI is
     ??
  • implementing the organization structure recommended by MAC's independent review. The project has been reorganized as shown in Figure B-1. This organization i structure has significant advantages ovet the prior
   ?                             organization. The assignment of a Project Director and a Quality Assurance Manager reporting to the Vice President-Electric System assures the identification
     '" '                                                                                      )
     "

and timely response to project needs in both areas of project management and Quality Assurance.

     ??   .                      Descriptions of the components of the new organization 2

and their functions follow.

=
     ;2                                          III-C-1
                                                       - -__      - _ _ _ _             .. _

f

               .
 =..  -
           .

(1) Projset Mcnngemtnt End Quslity Assurance yt= Organizations ' :- The key positions of the organization are the ,.._. Project Director, Quality Assurance Manager, j[s Construction Manager, Project Control Manager, ~~ Project Engineering Manager, and Project Administrator. 4= N The Project Director will coordinate the varied ' I aspects of the project except for Quality _

  =                    Assurance and will report directly to the Vice
E President - Electric System. The Quality Assurance Manager directs the Quality Assurance

,. Program and also reports directly to the Vice El President - Electric System. _

.

The functions of the remaining positions and their .

                                                                              '

respective organizations are discussed in the g.

   =-                  following subsections.

7 (2) Quality Assurance Organization The functions of Quality Assurance and Quality Control organizations have been reunit'ed under one manager and relocated to the site. The Quality Assurance organization as rhown on 5 Figure C-3 consists of three separate quality

I assurance functions; namely, inspection, quality engineering and quality systeme.
  =

5 Inspection performs sourge inspections at suppliers' facilities, receipt inspections of material and equipment shipped to the job site, and survcillance and inspection of storage

   "                    conditions and construction activities at the job site. This organization is responsible for p                    documenting inspections and identifying

' 6: unacceptable work and material and stopping further processing of unacceptable work. The

   -                    surveillances and inspections performed by this
   .

organization are conducted in accordance with inspection plans prepared by Quality Engineers. 5 Quality Engineering reviews technical requirements, identifies characteristics to be

        ..

inspected, prescribes inspection methods and "p quantities to be inspected, and documentation methods. Quality Engineers assure adequate i I definition of accept / reject criteria in all f documents by review and comment on drawings,

     "                  specifications, and contractor procedures.

Quality Engineers participate in the verification

     ..                 and disposition of nonconformances and their j5      .
                                         .

E . III-C-2

     !?
i. _.. *
          .

causes, and tha dstcrminscion of tha need for

;:.3 corrective action.

J.i. The Quality Systems Group is responsible for the preparation of the Quality' Assurance Program,

 .

preparation of implementing procedures for the Quality Assurance organization, performance of , n.. Quality Assurance audits, review and maintenance <. of records, and tracking, trending and reporting ,

 -

of quality deficiencies. , The functions and responsibilities of the Quality {" 7 Assurance organization are defined in more detail in the description of the revised Quality Assurance Program in Part II of this report.

r_
  '

(3) Project Engineering Organization I.5 The Project Engineering function has been reorganized as shown on Figure C-4. This new organization provides improved support to the Construction Management Organization, improved methods of handling design changes, and additional numbers of people to support the project. The S&L Engineering Group provides an on-site group from the design organization to review,

   ,_                  evaluate, and approve design changes which arise from construction interfaces. This on-site group can be further supplemented by the architect-engineer as the needs arise and is
   -

supported by the architect-engineer's staff by normal communications channels.

    =                  The Design Engineering Group is responsible for
        -

the design overview within PSI for the project. This group's responsibilities include interfacing with S&L and equipment suppliers and the i# coordination and resolution of special problems. The Nuclear Safety and Licensing Group provides licensing support for Project Engineering. This includes preparation and coordination of Safety Analysis Reports, coordinating architect-engineer

                -

efforts relative to licensing and acting as the

    ,?:                 primary contact with the Nuclear Regulatory
    ~

Commission project managcuent. The Nuclear Safety a_ and Licensing Group is also responsible for 7 maintaining cognizance of the applicable codes and standards for the Marble Hill Project. [2 The Project Engineering Administration Group

     -

provides clerical services to Project Engineering and administers site document control.

    =

I e

      ~
                                        .

III-C-3 a

Y

            .
    ..
        ~

(4) Construction Min 2hement Organizstion ,

                                                                             ,

!3 The Construction Management Organization has been i b reorganized as shown on Figure C-5 to incorporate [

 .

the area concept of management an'd contract i U administration. This separation of constr:ction [

  • management and contract administration allows the construction engineers to devote their efforts to

": preplan the work with the contractors and identify [ and resolve potential problems.

                                                                           .

- The Construction Manager has Area Construction Managers reporting to him and each is assigned one of these specific areas: turbine building, , auxiliary bu;1 ding, reactor building and general - facilities. .4 The Resident Field Engineering Group is provided ^ _ to give support, by discipline to the area , managers. This group will receive and process contractor change requests and other field generated engineering-related documents, disallow those which are inappropriate, and coordinate the balance with Project Engineering. .

~

The Contract Administration function has been instituted as a part of the Construction Management Organization. The function will include: direction of administration, monitoring, I- and auditing of architect-engineer and Prime Contractor activities for contract performance. _." The Systems Turnover Group will manage construction testing, master completion list and system turnover to operations. The Constru. tion Staff Manager will assist the Construction Manager in the administrative y.; functions, such as staff coordination, staff 5: augmentation, contractor prepared procedure review and correspondence control. (5) Project Control Organization

              .       The Project Contro Organization, as shown on Figure C-6, is comtrised of three (3) main 2; ,

sections: Plannin;/ Scheduling / Cost, Area Control and Material Management.

The Project Planniag/ Scheduling / Cost Section is charged with the esponsibility of providing

                             '

viabie project pl anning, control and cost / management ,ystems. s . 1 i

III,-C-4
      -                                                                        l 1

l

                                                                               !
                                                                                ,

g, . The Aras Control Szctions are organizad by major e., construction areas, (i.e., auxiliary building,. E reactor building, turbine building, and general

   '~

facilities' . d are comprised of both cost

   . . .

engineers anu construction schedulers. These 4 s[ groups are charged'with the responsibility of E5 providing the PSI Area Construction Managers with the cost and schedule support. b

   ,

The Material Management Section has the basic objectives of providing an organization and system to monitor, review, and modity all planned

    ~ - . .~

activity on a component or item to make certain that mate, rial and equipment is properly stored and

     . . . .

maintained. In addition, this section provides

    "

material control support to the project.

,

(6) Project Administration -: The Project Administration function as shown on Figure C-7 provides assistance to the project in the areas of procedural support, facilities support, personnel support and general administrative support. l ii. Personnel Qualification Requirements E9 PSI has reviewed and defined the personnel

     +                qualification requirements, both in experience and in

[... education, for the project. Additional staffing is being implemented based on these qualifications.

          '

iii. Staffing PSI's approach to increasing experience level of the if?._ project management and Quality Assurance staffs is as l

          =

follows:

 .
 ; ?]          -

(1) Reassignment of Personnel

Quality Assurance personnel experiene.e is being reviewed against required training and experience levels needed for qualification; only persons qualified in accordance with ANSI N45.2.6 will be

       ..

placed in those positions performing verification M of quality. In functions not covered by ANSI

      '7 N45.2.6, PSI has reviewed personnel qualifications and has reassigned personnel to positions EE -                 commensurate with their experience. Where EE                   appropriate, other personnel will be trained to qualify for positions in the overall Marble Hill
       ,                    organization or reassigned to other positions within PSI.
      =

LE

= -

III-C-5 l

       \
             ~
                                                                    , - , .
                                                                              . _ _.
b. .

h (2) Hiring of New PSI Personnal 5 Recruiting of additional personnel is being 4 accomplished through the use of personnel placement services, PSI personnel recruiters, th. executive search firms and media advertisements.

CL (3) Use of Contract Personnel r.m ' '@ PSI has upgraded its current level of experience through the use of contract personnel. Selected m.. positions have been staffed with qualified MAC personnel who are maneging certain key functions

        .

s and the recruiting, hiring, and training of qualified PSI counterparts. The key positions in t= project management and Quality Assurance are being staffed with qualified MAC and PSI employees.

  -

It it planned that during the term of MAC's

        -                 involvement on the project, the PSI counterpart in each of these positions will be indoctrinated to assume the project responsibilities. Specific plans for implementing this transition will be developed. The NRC and ANI will be notified prior to release of such contract personnel at 7;                     supervisory levels.

' LE Contract personnel will be used in other areas of e: the project to supplement existing staff as needed. I

  '

Training iv. PSI is developing a comprehensive training program.

  • P This program is intended to supplement the technical expertise of project personnel in specific areas, to provide familiarization in project procedures, and to
   =                 indoctrinate project personnel in site rules. The program will also provide documentation of training.
      .

_ PSI now has on-site a Training Manager and a Training

   ~"

Coordinator. The Training Manager reports directly to the Project Personnel Director who reports to the Vice President - Electric System. The Training Manager is 2 also supported by an educator on contract to PSI for assistance in the development of the training program. It is anticipated that the training function will be 52- reassigned to Project Administration at a future date.

    -
  • The first level of training will consist of  !

EE indoctrination for all site personnel. This aspect of the program will cover such typical topics as: f

                      -

Importance of Quality 1

                      -

Nonrecrimination aspects of reporting I 1 _- i l l I

            -                        III-C-6
     .
                                                                                     .

l

            .                                                                        1
      .   .

The sscond Icyc1 of trcining will censist of training

. . _

rnd indcctrinction for PSI projcet cnd Quality Assurance personnel. This portion of the training program will include the following: I - Teaching programs for individuals who will c instruct other project individuals

                            -

Indoctrination in Project Management Procedures

                            -

Indoctrination in the PSI Quality Assurance Pro l; ram The third level of training vill consist of job " specific training for appropriate groups within the project. This* portion of the training program will include the following typical topics:

=
                             -

Construction practices Uf - Quality Assurance inspection procedures

                             -

ASME Code requirements

=

This training program will be updated periodically as the project proceeds to meet specific needs which have been identified. Training in some areas, such as

 *~

Quality Assurance inspection procedures, has begun. The training necessary to support specific activities

will be in place prior to the start of those activities.
 .

Numbers, Qualifications, and Experience of Project Personnel

'

2. [ Tables C-1, C-2, and C-3 have been developed to show June 1979, "2 January 1980, and projected levels of staffing for restart. Table C-4 has been developed to show experience summaries for PSI llj staffing as of June 1979, PSI and contract staffing as of January 7 1980, and projected PSI and contract staffing required to support start of installation activities. The staffing shown in the

 ;             January 1980 column will support the start of PSI receipt g;            inspection activities. The projected staffing will support the start of installation activities. Full construction activities
 ,

will be supported by additional staffing as required after restart. PSI Construction staffing has increased by a factor of 1.3; when

   =           contract staffing is included, total Construction staffing 2           increases by a factor of 1.9. PSI Construction staff experience has increased by a factor of 1.9; when contract staffing is
   ;,          included, the total Construction experience increases by a factor of 4.2. This total includes construction support functions such
   '

as training and staff management.

   -

E III-C-7

        -

__.

           .   .

PSI Engin23 ring stcffing his remainsd the sema; whsn contract f staffing is included, the total Engineering staffing increases by .j a factor of 1.6. PSI Engineering experience has decreased by a factor of 1.1 due to transfers of personnel to other positions in .g field organizations. When contract (S&L) experience is included,

 .

the total Engineering experience increases by a factor of 1.8.

 . . _

PSI Quality Assurance staffing has increased by a factor of 1.2; [" when contract staffing is included, total Quality Assurance > PI- staffing increases by a factor of 1.4. PSI Quality Assurance experience has increased by a factor of 1.2; when contract . "# experience is included, the total Quality Assurance experience

  ;              increases by a factor of 1.7.

PSI project staffing has increased by a factor of 1.2; when contract staffing is included, the project staffing increases by a factor of 1.6. PSI project experience has increased by a

  ~

factor of 1.2; when contract experience is included, the project experience increases by a factor of 2.3. This level of experience includes experienced project administration and project control functions which are not a part of the direct construction function. ,;

  .
         .

[.:: 5::. F

  =:a A;
    ,.-.

4tn

    . *
      ,.l i
    ; :L III-C-8
             .
 '

lihi" fihii' !!!!!!! '!!!  !!!! " "t 'D '!!!!;i  ?!!.

                                                                                                                             ~
                                                                                                                                         ~'i*          '
                                                                                                                                                          .j   di         ' d[i"
                                                                                                                                                                            ;

in [[h ~l WP" {{~ .

                                                                                                                                                                                                           .

TABLE C-1 PROJECT DIRECTOR AND CONSTRUCTION PERSONNEL Prcjected Staffing Required to Support Start of Staffing Staffing Installation As of 6/1979 As of 1/1980 Activities Contract PSI Applic. Applic. Applic. Exper. Exper. Exper. Contract PSI Position No. Educ. (Yrs.) No. Educ. (Yrs.) No. Educ. (Yrs.) No. No. B.S. 5 1 P.E. 15.5 - - - 1 0 Project Director 1 4 II . S . 17.5 - - - 1 0 Construction Manager 1 li . S . 1 Area Managers Turbine Building - - - 1 II . S . 23 1 li . S . 27 1 1 0 Auxiliary Building 1 B.S. 3.5 1 B.S. 8 1 B.S. 4 1 1 7 o

   'o        Reactor Building                                           i                 B.S.             2.5           1       II . S .       3           1    B.S.               3           1         1 General Facilities                                          1                B.S.            4              1       li . S .       9           1    B.S.               4.5         1         1 Civil Engineers                                              7                  B.S.           13               1      B.S.           7           7    B.S.              16.5         3         5 Mech. Engineers                                              4                  B.S.             7             4       2 II.S.       35.5         5    B.S.               9.5        4          6 1 B.S.

1 Assoc. Deg. 20.5 - 5 2 II . S . 23 3 4 Elect. Engineers 4 2 B.S. - - 2 H.S. 2 B.S. I Assoc. Deg.

                                                                       -                       -             -           -             -        -

1 II . S . 4 0 1 Const. Train. Coord. Resident Engineer - - - - - - 1 B.S. 8.5 0 1 2 B.S. 5 0 4 Resident Engineers - - -

                                                                       -                       -             -

22 - - 1 0 Const. Staff Manager - - - I ll . S . - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _

M

                                      '                                            ~

I p5 ~ r-

                                         ;[                                                                 m        h;                      -
 "

i: ' ;i! , 1- lpi

                                                *
                                                    ' ,3  tg
                                                             "        -
                                                                                                                                                   .

. TABLE C-2 , PROJECT ENGINEERING PERSONNEL Projected Staffing Required to Support Start of Staffing Installation Staffing As of 6/1979 As of 1/1980 Activities Contract PSI Applic. Applic. Applic. Exper. Exper. Contract PSI Exper. No. Educ. (Yrs.) No. Educ. (Yrs.) No. Educ. (Yrs.) No. No. Position 1 M.S. 11 1 B.S. 12 1 H.S. 11.5 1 1 Proj. Engr. Manager I M.S. 5.5 - - - 1 M.S. 10.5 0 1 Design Supvr. B.S. 4 0 1 M.S.

                                                                                         -

10 - - 1 Mech. Supvr. 1 6 B.S. 13.5 - - - 4 B.S. 8.5 0 4 Mech. Engrs. H.S. 28.5 - -- - 1 0

                                          -            -

1 [ Elect. Supvr. - s 1 Elect. Enges. 1 M.S. 6 - - - 1 M.S. 6.5 0 1

   ?

E 5.5 - - 1 M.S. 6 0 1 Civil Supvr. I M.S. -

                                            -          -        -           -             -

1 B.S. 2 0 2 Civil Engrs. - 3.5 M.S. 4 0 1 H.S. 1

                                                                -           -             -

Nucl. Supvr. 1

                                            -           -       -           -             -

2 B.S. 1.5 0 2 Nucl. Engrs. - 1 M.S. 7 - - - 1 H.S. 7.5 0 1 Nucl. Safety & I.ic. Supvr. 3 1 B.S. 15 0 3 Nucl. Engineers 3 1 B.S. 13.5 - - - 1 M.S. 1 M.S. 1 PhD 1 PhD 8 i B.S. 10 - - - 1 0 S&l. Design Supvr. 1 B.S. 1 II . S . 25 - - - 7 0 S&L Engineers - - - 7 4 B.S. 2 M.S.

                                                                                             .                                      -
                                                                                                                                                                      .-
                                                                    ,,.,-_
                                                            . . _ =            _.                _       -
                                                                                                                      . .

_

                                                                                                                           ,                .,
                       .g a
                                                                                           ,
                -
                   <
                                       ;;       . . r, 3                                                             .       :.               n
                                                                                                                                                                       ,
                          .
 .

TABLE C-3 . QUALITY ASSURANCE PERSONNEL 2 Projected Staffing Required to Support Start of , Staffing Installation Staffing As of 1/1980 Activities As of 6/1979 Contract PSI Applic. Applic. Applic. Exper. Exper. Contract PSI Exper. No. Educ. (Yrs.) No. Educ. (Yrs.) No. Educ. (Yrs.) No. No. Position 1 1 Quality Assurance Manager I li . S . 6.5 1 B.S. 11.5 - - -

II . S . 14 0 1 Supt. Insp. 1 II . S . 13.5 - - - 1 II . S . 20 20 2 B.S. 53 17 24

          ;

I.spectors 18 . 2 B.S. 47 3 15 li.S. 17 H.S. 1 Assoc. Deg. 1 Assoc. Deg. . s U Mgr. Qual. Engr. - - - 1 H.S. 21.5 - - - 1 1 5 17.5 10 4 B.S. 69 4 9 l d. Qual. Engrs. 7 3 B.S. 51.5 3 B.S.

   "

3 li.S. 5 II.S.

                                                                                                                    -

' 1 B.A. 1 B.A. i M.S. 11 - - - 1 M.S. 11.5 0- 1 Supt. Qual. Systems 1

                                                                                                     -

8 5 B.S. 39.5 2 8 I Qual. System & 6 3 B.S. 35 - -

                                                                                                                                                            '

3 !!.S. Prog. Support 3 it.S. i i I B.S. 1.5 i B.S. 14 1 B.S. 2 1 1

QA Records Supvr. 6 1 B.A. 5.5 5 4 Records Reviewers 5 1 B.A. 2.5 - - - 3 II.S. 5 li. S. 1 B.S. B.S. 8.5 - - - 1 0 , Quality Assurance Staff - - - 1

                                                                                                                                                                           ,

_-___

7!!" 11 !! !!jn :p;

                                                                                                          '
                                                                                                             +
                                                                                                                            ,g; '   '        ,y      !:          i;! '
                                                                                                                                                                               '3   djiijg   "ri;;i q;*;m g
  .

O TABLE C-4 EXPERIENCE

SUMMARY

Projected Staffing Required to

  • Support Start of Staffing Staffing Installation As of 6/1979 As of 1/1980 Activities Contract PSI Applic. Applic. Applic.

Exper. Exper. Exper, Contract PSI Position No. (Yrs.) No. (Yrs.) No. (Yrs.) No. No. 5 1 15.5 - - 1 0 Project Director 1 54.5 11 125 25 105 16 25 Construction 19 75.5 17 77 to 18 Project Engineering 17 83.5 to 40 168.5 10 93 47 194.5 32 - 50 Quality Assurance n 93 SUBTOTALS 77 311.5 32 309 89 376.5 59 h Project Support 1 4 4 43 2 11.5 4 2 315.5 36 352 91 388 63 95 TOTALS 78 ,

 . . _ _ _ _ _ . - - . _ _ _ _ _ _ _ _ _ _ - _ .              _ ___- - - _ _ . - - -
                                                                                                                                                                                                                                                   -
                                                                                                                          - .                                                           ,.
                                                                                                                                                                                                     .

7..., ,,r. . -. 2.

                                                                                                                                                                                                                                                 '
                                          .

. e ClkCCitR tEJCi t fJt 6 IVANCT *

                                                                                                                                                                                                                                                     .
                                                                                                                            ]

I I I I Svihrl53NC 'NATIU ' I A55th1N4T 7kDR SIM i~ Slalfsvisti C fis.tif f M ui t,l EtM.18 04 54ATRifHLittNT tlLita l R g,4;g'[[jg I gm (mlLCT ff$iNMus It'5fita; E SJ g i-CP IPNIRu tudf AL te r lint ra* a siV (f.qpAgf g _ PWaviR ' 1 . _L Sl t61t u

                                                                                                                                   $LNlW                          SU t ,, t,N 51/J f                              , p SIN F                  l                                                                     l                            '

I!I'# ' surt.I.vls!!:c COM)ltiAIIP4 SUFf.RYisING DG!ta IE EFs.ita 1 R [f 5.lt(LR C l V I 1. Ft.ICTRILAL Ff O W410M l ("'S h i8"' ("6 m 'il"i l COST c Sottar - DCit& LR Fl[LD LP68tELR g rilog MTST SOFDtF tAILLENt

                             $1 Ag r tisfratRS                                                                                                   ,                                l SLNICS                          ASS 15144T STAFF                         CuGTRutil0t4 ftCitaIRS                     FifLD DElttfR
                                                                                                                                                          ^:-:--- ----- :-                 - = - - - - - - - - - - - ^- ==
                                          - -__--_ ---                    -----          - - ---------- --- - ------ - - - -

CLt6 t WUC18tte FRELD FifLD PRulECT Fts;ltti R

                                                            '

J L-_--- J L-~~-~~~ (________-------__-- Cu61RUCllOP4 fl[LD . Euckt lei [

 .**

LC5f tJ4 LudikOL SUPf RVISGt DAItLtR CONTPol. Cn5T E 50E tttE StJY RVISOR I SITF O I I A5555Tn4T o* U CuisTAK.TIu4 Fl[LD UC1tEER I 1

                                                                                                                                                                                                                "' 6 * " "i CusrRutilus                                                                                             Fikt f1tLViti!!ON
                                                                                                         "'*IIIE"                                                                                                COC8Dite10R I                                                                                                          I Ctf 619UCIl(84 l                                                                                                                            FlkC I1tLNtt4 Tiff 8
                                                                  '.f Niut ((461>UCilltl                                         '434IM CE'I    U I NN                                                            A5 ISTMG IIILD Unitit h                                                IIIk[p'd't g      NT Civil C ff 0W41CA1                                            J            1R I CM_

l I I l C(# 61FtKilt *4 Uf 61kiK.11(ta us6TRtETlue Cordi!4Cilai flLLD lis.It(ER r![lb t.tElia [R Fit'lD t tCit(ER 8If4D DCitELR it O pt41CA1. It61Rif t tJT tiTCTRICAI. Civit I l A55151N41 i A55551N4I I A5515TM41 A55151/J4I Cit 6TRUCTICte Cu6THUCTIff4 CCtGTRtJCTICel Cfr61RLCil0P4 ' fitLD Iri.itLER FIELD EPCita [R FIELD ftCltitR FILID tt#;1tif R J NUQfAR PROJECT PUBLIC Grgp i SERVICE ~ -- INDIANA FIGURE C-1 AS OF 6-79

                                                   .
..

4; . - n - - mm r;r

                                                                                                                                               '-
                                              ,.
ti !i,n,
                                                   ..

e

                                                             ,.
! :.
p:
.
                                                                                                                                                  ~
                                                         .
   .
                                                                                                                                                  .
!

QUALITY ASSURANCE

MANAGER l x . 7'-

                ?

7 PROGRAM DESIGN & AUDIT ' OPERATIONS C04STRUCTIG4 DEVELOPK NT , PROCUREMENT SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR ! 4 PREVIOUS 00AlllY ASSUIWEE ORGANIZATION PUBLIC SERVICE l lNDIANA FIGURE C-2 AS OF 6-79 ' _

 - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
y. - - ---~~ n?
.
                              ...         .       .-
                                                                                                                                                                       .
                                              -
  • QUALITY ASSURANCE
                                                                                                                                                                       -

MANAGER AGER SUPERINTENDENT SUPERINTENDENT INSPECTION E I E ING

   -   SOURCE                                 RECEIPT                     CONSTRUCTION INSPECTION- SU{E li NT         Su g g tDENT     gg                    ]

OPERATIONS

                                                                                                                                                                   .
   - INSPECTION                             INSIECTION                                    kUALITY                  QUALITY       RECORDS SUPERVISOR                             SUPERVISOR                     SUPERVISOR    ENGINEERING             ENGINEERING    SUI-ERVISOR'        SUPERVISOR A                                                                                                                              '

S SUPERIN DENT SUPERINTENDENT WELDING E -- CIVIL UALI UALITY ENGINEERING EN INEERING

                                                                                                                                                -

SUPPORT SUPERVISOR AUDIT 3UPEliiNTENDENT COORDINATOR PR g'.NT

A SURANCE PROJECT QUALITY

' PUBuc ASSURANCE ORGANIZATION SERVICE INDIANA FIGURE C-3 AS OF 2-80 _ _ _ _ _ _ _ _ _ _ - _ - - - _ _ _ _ _ _ _ - _ -

                                                                                                                                                                                                          -

n: -- a

                                                                                                                                                                                                              .
                                                            '
 .

9 PROJECT ENGINEERING MANAGER I I I I PROJECT PROJECT ENGINEERING PROJECT DIGINEERING. SARGENT & LUNDY ENGINEERING SUPERVISOR NUCLEAR SUPERVISOR ENGINEERING ADMINTS17ATor. SAFETY & LICENSING DESIGN ENGINEERING I I I I SUPERVISING SUPERVISING SUPERVISING SUPERVISING ENGINEER ENGINEER ENGINEER ENGINEER MECilANICAL CIVIL ELECTRICAL NUCLEAR I l MEC11ANICAL ELECTRICAL STRUC'111RAL {

   ?

m PROJECT ENGINEERING ORGANIZATION PUBLIC SERVICE INDIANA FIGURE C-4 AS OF 2-80 l _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _

                                                              !

f

        .     .                                               lE NOs M I 05 U T E Cvl t                                                                  n 1         S lt s        t
                                                                                                                           " o    s N T I S r                                                               i v

O Nu I s 0 L OS C " T O U T 8 R I J - T S d n 2 I C N l F O G A aN O '

T I N I E S CI OR IO C D A R T5 T CI 8 N N S U3ll R C UT I 0 A I TCU SAB NN l I L E E RR Tn S I MR T E C A N t3 aI O Y O OI I OAR U S N t CMOT A C A E 4o$ t C YNAP S I ET TE tr SLu

  • UTA 7 E

R A E mPMO S RI ! ! A B L C 5 2 T TN 6A G 1 A N C1 O3 I0 QR C O 5

                                                                                                                                                                                                     -

k T5 C A C1

     .

l N UV C Rg 4 l

      ,

MTg N 0 O 51 t E ANu Sr I V 8' R E OS T C R T U R C o U 8 E r N O G I I T u C S s T F N C O C S T E N E J LOE T O IIO R VTS F I CI CUT M l ATE RS M o a EA MSNU AOE r 05 1L T0 t F t CC N I I C ANNE A5 TTt t a T LVA I I AEON EHCI EU G N M BR UE D EOt M I o N ll T N N t fAE 5 W I O PSIN UTs A A R CI T N TUV 5 S I S N Tg RB 1

                                                                                                      $

T F I S r S A A NU A S L E O $ D A C' EC L f A F I R C M t U A EE N t N N N c I C I N O 1 AN C T E MC f I O L CO s D S I O I I 0 [l A TR R RT5 TR CF UC T N TC1 CUV N E U RA O I ESt E E C pN TN 1 Tt I g I SA 3St 5 C NM A A Nu g N O E E R COS C S gE L A A C ll I t ] R Ni 3 R S OC G T E O N N C EN T R On I A O I TA O TC T N CA I D . L I 3 I CR TT UM T C L AN r0 n 1 3 G N AT RS CA >u R T URI SEU t 1 o 3 E TI =N l

                                                                                                                                                                                        .m i

Sr TGB aC T T s i 1 I NN OI I Tb Np N F O A Cf 5 I SA NN7 I m U R R 1 3 CM OO CO Tu. oat l1 CH*l mTE A M u E r jl IA C A A l A R COE l E B I g

                                                                                                                                    ,

I e.Ii A U g A g g R y g L g E N I N LO m gI ll l

 '                                                                   1 I 0                                                       g         C                         R                       5 vT 5                                                                   N                        O E          S                         4 I

I C 1 CU V R s N O IT T O T T C R A T 0 C T A o T =. AT t TC AR AR T S N .- I 2S r CA

  ;                                                                  3 N U AO C$                                                                         U$s iT T

N IN I T N D I

                                                                                                                                                                                          .-

T ( RT O I O 0 t TN CM L A SO NC O N I M D A C0 C m o. C I R N0R 1O C D A J_l h I II;[ A N T TS l C O a l C Ci A I I c i 2 3E L 0v E T Ts Cl A E Tg L L sr O I C U v O Anu R E R a R E 1s 1 T L Tr T 3 ( N E S T N 4 lI I O C A E OS N U O R 5 C O R R C T o.

  • A E

A A T& TO E Ch CT T c. N O GN R A s GLA R A I A

                                                                                                                                  .

MS T A N xo im I I I C I T C D1 I 1 A N BR I C S l I M I o Cn I TI MN I n,R O D o U BI R C Os I I 0 UMF R El A Ts N CiV mIDN CO O m A, TFU N T5 TCi l C U A C . S CB A C l S E R R i NA  ! Q Uv l IR I' l M ST FE Jl L ONE C AN &T R k E CGA A NU I1 i [ A WM Hl R S r E OE A a N u F R C E t AO s tW A R o E C SF S A T A A

  '

N N L O o k I LOI E0 l v ITs V T 5 [ i CI l I C C 1 U V C Uk V a R a A T t

   '                                                                    AT t                                                    E Sr E S r                                                  B Nu S N u                  .                                A OS AO S C -         [ IOhN                                          C
            .
                                                                                                ,
                                                         -                  --
                                                                                     ;.                                                                    ------
           ,    ..
                    ..,.

t- .: ;)

. . i!..:.
                                              ...
!: ..t
                                                                        .:              j         ;,                      ;g
                                                                                                                              '

p; > "q ii . .t

                                                                                                                                                               .
  .
                                                                                                                                                               .

PROJECT C04 TROL f%flAGER 1 MANAGER MP4AGER AREA

                                                   . PLAT # JING,                      CONTROL SCK DULE, AND COST                                                 mat 4AGEE NT

, SUPERVISOR SUPERVISOR SUPERVISOR

!

SUPERVISOR SUPERVISOR PROJECT' STORAGE Ato - MAf4AGEKHT DATA PROJECT P!)4#11NG INFOPIATIO4 COST MAINTEt4ANCE MAtlAGENitT' AfD SCliEDULING

                                                                                                                .
    %

7

    ?
    -
    "                                                                                                             C04STRUCTIG4 STOREKEEPER

, I PROJECT CONTROL PUBUC ORGANIZATION SERVICE INDIANA FIGURE C-6 AS OF 2-80 f

                                                                                                           -
                                                                                                              --                    . - - . . . .    . . . . . . .
                                                                                               .:!!       !!!                     !!
                                        .

.

                                                                                                                                            .

PROJECT ADMINISTRATOR STEtD-CLERK -- STEtJO-CLERK I t%It4T , t4ENCE TJUCLEAR PROJECT ADMINISTRATOR SUPERVISOR ACCOt1JTING BUILDItJGS SUPERVISOR ANAL.YST

                                                                                                     .

NUCLEAR NUCLEAR pp JANITORS COrtS R TION CLERK -- LITILITYF%N -- cot R TION -- PROCESSItG A

  • S SE OR
                                                                                  ~

4l ADMINISTRATIVE AC k G -- ACC  ; ASSISTANT ASSISTNJT ASSI STM4T SENIOR SENIOR ACCOutlTIt0 -- ACCOt#4TitG ASSISTAtiT ASSISTANT CLERKS -- CLERKS PROJECT SENIOR ACCCitlTitG ADMINISTRATION ASSISTANT PUBUC ORGANIZATION SERVICE INDIANA FIGURE C-7 AS OF 2-80

                                                                                                                                              .
                  - - . _ _ - _ _ - - _ -
                              . _ -
       ,     .                                                                             .

_

  ~

D. REVIEW OF SAFETY-RELATED CONTRACTS h Item (4) of Part IV of the Confirming Order is whether and the extent i

 -

to which PSI has:

         '

u Reviewed all contracts of contractors and subcontractors doing C; safety related work to assure the adequacy of their quality assurance and quality control responsibilities and programs including conditions of such contracts that may impact negatively on quality, identified the specific steps to be taken to assure such conditions do not reduce the quality of safety-related work, _ and submitted the schedule to implement such steps.

    -

PSI has reviewed all safety-related agreements entered into prior to August 15, 1979. As a standard to review these agreements against, PSI first determined that its standard quality assurance requirements adequately addressed the quality requirements for a nuclear plant. All agreements including safety-related work were then reviewed and it was determined that they included these requirements. Commitments to the Quality Assurance Program are satisfactory with the exception that the implementation of stop-work authority in some instances is not sufficiently defined. Contractors are being directed to make the necessary corrections. When exceptions or clarificatio.ts were taken to PSI's specification terms, an in-depth review of the exceptions or clarifications was made by PSI Quality Assurance. Based upon this review, PSI has determined l that none of the safety-related agreements contain conditions which impact negatively on the contractor's quality obligations. '

  =                                                                                The exceptions or clarifications were either acceptable or were not included in the agreement. In addition, a review is being made of the requirements of the commercial aspects of various specifications and industry standards to identify any terms or conditions that conflict with controls established by the Quality Assurance Program.

PSI has verified that the on-site contractors either have no subcontractors on site, or have included the requisite quality provisions in their agreements with their on-site labor

   =                subcontractors. One instance was found where the subcontractor was E               working to the contractor's Quality Assurance Program.
   .._

2* s

    ;
T
    -

III-D-1

           .
                                                                                            .

t

. .

, . _, E. DESCRIPTION OF DEFICIENCY IDENTIFICATION AND EVALUATION c One of the NRC's concerns, identified as item IV (5) of the Confirming Order, is whether and the extent to which PSI has: =; [~ Described the mechanism for assuring timely" identification and evaluation of construction deficiencies including conflicts in _ specifications, drawings, procedures, and directions released for

'E
.                      use in construction and described the system for assuring corporate management's awareness of site problems on a timely basis and input into the evaluation and correction of these problems.

The Marble Hill Project Quality Assurance Program has been revised to more clearly define these mechanisms, and strengthen them where required.

1. Identification of Construction Deficiencies by PSI 9 a. Construction deficiencies representing departures from design requirements that are detected by PSI Quality Assurance personnel or contractor's personnel when performing
      ~

inspections (i.e., first line inspections) shall be documented on a Nonconformance Report.

b. Construction deficiencies representing departures from design requirements that are detected by PSI personnel performing surveillance inspections (i.e., not first line inspection) 1 shall be documented on a Corrective Action Request. I 1

_.

c. Deficiencies that are of a programmatic nature which have i been detected either by inspections, surveillances, or audits
      =

shall be documented on a Corrective Action Request. Where conflicts occur between drawings, specifications,

    ~

d. standards and procedures, the conflict and recommended action shall be dccumented by PSI or contractor's personnel on a , Field Change Request. l l

e. The responsibilities and methods to be used by PSI personnel to identify and document deficiencies and conflicts on technical requirements are defined in the PSI Marble Hill
    "

Project Quality Assurance Manual. l

f. The contractor's quality assurance programs are being revised to include the use of these standard forms and methods for identifying deficiencies and conflicts.

M. .

m. -

III-E-1

                                                     .
 ;e
,..

e r

2. Evaluctions of Construction Deficiencies and Conflicts 15 j5 a. Nonconformance Reports and Corrective Action Requests shall be initially evaluated by the cognizant PSI Superintendent
= Quality Engineering to verify information recorded and to

-E determine if the deficiency is a " Potential NRC Reportable Item". If it is a " Potential NRC Reportable Item", it is

*
..

submitted to the Marble Hill Safety Review Committee for evaluation and subsequent reporting, if applicable,

b. Evaluation and disposition of the Nonconformance Reports shall be done by the PSI Project Engineering Manager and E5__ approved by the appropriate Superintendent Quality Engineering and the prchitect-engineer if the disposition is
 .=                      " Repair" or " Accept As Is".

,2 "

c. The PSI Quality Assurance Manager is responsible for evaluation and followup for Corrective Action Requests that are written as a result of repetitive deficiencies, lack of
response to previous Corrective Action Requests, or for problems that cannot be resolved at the PSI Superintendent Quality Engineering level.
  --

The cognizant PSI Superintendent Quality Engineering is e responsible for evaluation, resolution, and followup action N. on all other Corrective Action Requests.

d. Field Change Requests are evaluated and approved by the same
 ."                       design organization that approved the original document (s) which the Field Change Request affects.
 ;-                       In addition, Engineering Change Notices may be used by the design organization to make changes to drawings and specifications.

k e. The responsibilities and methods for evaluation of construction deficiencies and conflicts is delegated and

  ,                       defined in the PSI Project Quality Assurance Manual.
  .=
f. The upgraded staff, the relocation of the project staff to the site to improve communication among the project groups, g and the intensified training program being implemented, along

~ IE with the programmatic controls described above, will provide more timely identification of problems in the future.

                             ,

E _,

3. Processing of Nonconformance Reports, Corrective Action Requests, and Field Change Requests
   ~~~

gg

          *
a. The Project Management Procedure, " Control of
        ~

Nonconformances" provides time limits and flow paths for the evaluation and disposition of Nonconformance Reports and

   ;                       Corrective Action Requests.

E hi:

55 III-E-2

           --                  - -              -

_ _ .

         .     .

e:

b. Provisions hcva been mada in tha edministrativo procedures to

__ jy provide timely evaluation and resolution of Nonconformance 45 Reports, Corrective Action Requests, and Field Change Requests. These provisions are briefly described as follows: f5 i. The number of forms to be used for reporting nonconforming conditions and for obtaining approval for

=

design changes has been reduced, and the use of these systems simplified. To the maximum extent possible, t.~~ these standardized forms and procedures have been established to be used by PSI and the site contractors _ . . _ to avoid confusion and dual reporting that had occurred un previously.

                                                   .
  ._.

ii. As part of the computerized tracking and trending

  =                              program, ten (10)-day and thirty (30)-day overdue reports will be used, sorted by responsible
                                          ~

organization, on outstanding Nonconformance Requests and '". . . . . Corrective Action Reports. These reports will provide visibility to the appropriate levels of management to take necessary action to maintain timely evaluation and disposition.

4. System for Assuring Management Awareness of Problems
  '
a. The Project Director reports directly to the Vice President-Electric System. This direct connunications
   -                       channel from the construction site to the corporate level provides timely corporate management awareness of site
 '

problems which require immediate corrective action.

    =                b.    "NRC Reportable Items" are submitted to the Marble Hill
   "

Safety Review Committee for review and action. PSI management is made aware of this committee's action and is 9: signatory for any reports to the NRC resulting from this

   ,;                      committee 's work.

S. c. A program has been established for recording and tracking trends on quality problems identified on Nonconformance 3='~~ Requests and Corrective Action Reports. The PSI Quality Assurance Manager shall conduct a trend analysis review of nonconformances and deficiencies of PSI and its contractors. The Quality Assurance Manager is responsible to take actions to resolve unsatisfactory quality trends.

    !b                      In addition, the Quality Assurance Manager is responsible to report the results of his review to the Vice 7:
           .                President-Electric System in writing. This report      is also P~                      reviewed by the corporate Quality Assurance Review Committee.
= Involvement of senior PSI management in site problems and
    !E                d.

P input into correction of those problems occurs in two ways. FE E III-E-3

             .

lr t ~. '

            .   .

Menthly sits progress mtstings hava been instituted and are [:; now being held. Attendance includes key site personnel, such it?: as the Project Director and the Construction, Quality Assurance, Project Control, and Engineering Managers or their

  ;:g             delegates, and the Chief Executive Officer and Vice ig              President-Electric System of PSI. These meetings are intended to provide both a project status to corporate
 ,m.

management and to obtain management direction and solution of [ll site problems. Site problems or action items are identified to management on a status list and reviewed at the meeting. This list

  =.              typically includes such items as staffing progress, development of programmatic c,ntrols, or site problems requiring management review or input. This list is revised using management input subsequent to each meeting; items
        ~

which are not dispositioned are carried forward to future meetings.

  .

The responsibility for the Quality Assurance Program rests with the Vice President - Electric System, who is accountable to the President. There is a need, however, to disseminate important information relative to the necessity for and effectiveness of the Quality Assurance Program to other areas of corporate management. Therefore, the Quality Assurance Review Committee has been restructured and is chaired by the Vice President - Electric System. The Committee will not set policy or initiate action since these responsibilities are clearly delegated to the respective line organizations as defined in the Project Quality Assurance Manual. This Committee will meet no less frequently than every two months

   ;r              and more often as project activities require.

, Fi

   -
      *
  ;.;
   -

a r

     ?;
    ..
        <
    -

p.:.

     .:.:

I III-E-4

              -
                                                                          ,_  _

r

.

le- -

                -F. DESCRIPTION OF SYSTEM TO HALT CONSTRUCTION E

[s. Item (6) of Part IV of the Confirming Order is whether and the extent to which PSI has:

       ~

hk Described the system for promptly halting construction due to

  • nonconforming circumstances or unacceptable work including criteria for defining unacceptable work and for assuring IE instructions explicitly describe how work is to be performed so IE that both production and inspection personnel understand what is not acceptable.

[ The revised PS' quality Assurance Program defines the system for halting constru.cion due to nonconforming circumstances or unacceptable n., work. i% In addition to the revisions made to the PSI Quality Assurance Program, PSI will review the programs of the contractors to assure that their programs adequately define acceptable systems for halting construction due to nonconforming circumstances or unacceptable work, including systems for defining unacceptable work and for assuring that

" instructions explicitly describe how work is to be performed so that producticn and inspec tion personnel understand what is not acceptable.
1. System for PSI to Halt Construction
a. PSI quality assurance surveillance, inspec tion, and audit personnel are authorized and assigned the responsibility to stop further processing of unacceptable items or materials by
   '

its suppliers and contractors. P The PSI quality assurance surveillance, inspec tion., and audit fi5. personnel are responsible for notifying cognizant PSI personnel, the organization being stopped, and are _ . . .

   . . . .

responsible for documenting the unacceptable condition.

b. The PSI Quality Assurance Manager is fully authorized to stop work of any PSI, contractor, or supplier organization which,
in his judgment, must be stopped to correct poor quality 1 trends or performance.

This Stop Work authority is of a broader scope than stopping a single process and may include such things as all design activities of an organization, all installation activities of a contractor, or all fabrication or processing of PSI purchased materials or items. Upon receipt of the Stop Work order, the PSI Project Director

     .._r~*                       is required to take those actions necessary to assure that the work is stopped promptly.

E ,p

     ,.3 III-F-1
            -
                                                                                                 -
                                                         -.                -      -
                                                                                     .    .-       -
                                                                                              . _ _ _
                                                                                                      .
                *
     =.

If the activity is ASME Coda related, the PSI Quality

.      .

Assurance Manager shall notify the Authorized Nuclear

9

     )E t                         Inspector.
2. Contractor's Systems to Halt Construction
                        *
~~ I
a. To provide assurance that unacceptable work is stopped,

_ qualified PSI Quality Assurance personnel are reviewing the

     @!                        quality assurance programs of site contractors to determine
     "-

if adequate authority, responsibility and systems are delegated and defined to the contractor's quality assurance

     ._

personnel, and are acceptable. The criteria used in this review shall be in consonance with the authorities, f responsibilities and, methods to be used by PSI, i.e. that the _. contractor's quality assurance personnel have full authority E and responsibility to stop unacceptable work, either of a

      "                        regular item or process nature, or in a broader sense such as stopping all quality related activities of a contractor as a

,' ' result of unacceptable conditions or quality trends; and that

     ==                         the methods for notification and documenting the stop work are clearly. defined.
          -
b. Where the contractor's quality assurance programs are found to be inadequate as a result of this PSI review, the programs are to be revised to an acceptable condition prior to start or restart of activities by that contractor.
3. System for Defining Unacceptable Work
,
a. The criteria for defining acceptable work is established by engineering drawings, design specifications, and applicable
     ==                         codes and standards. Process controls established in I                          approved work procedures necessary to meet the requirements of the engineering drawings and specifications are also

_ criteria for defining acceptable and unacceptable work.

          ~

Criteria for defining acceptable programmatic administrative

      . . .

controls are defined by codes, Federal regulations, ANSI jE standard, and regulatory guides.

b. Inspection procedures and instructions are to be used by PSI
      %#                         quality assurance personnel when conducting surveillance and
      '                          inspections. As a minimum, these procedures and instructions shall contain: (a) identification of characteristics to be

, inspected, (b) accept / reject criteria, (c) individuals or ,

'

groups responsible for the inspection, (d) method of inspection, (e) verification and certification of inspection _ and, (f) provision for recording the results of the  ; 2.

  • inspections. I
)
                                                                                                        !
2. l
       =;

4 E~ III-F-2

                  '
              -
   -
                                     -

,\

 =.         .

y::

e. Quality Assurance personnel are required to
 $5                      determine acceptable / unacceptable work based upon
 "*

the accept / reject criteria established by the

 ,_

Engineering drawings, design specification . t;[[ applicable codes and standards, and are not authorized to permit deviations from these criteria. Where conflicts occur between these criteria documents or in interpretation of the

 }i                      criteria, these conflicts are to be documented on t-a Field Change Request and resolved by the e                       cognizant. design organization.
c. Work control procedures and inspection procedures and instructions are'to be prepared by and used
 =                       by PSI contractors in performance of their
 #~                      construction.and inspection activities. These work control procedures and inspection procedures are to be reviewed and approved by PSI Quality
                 '

Assurance for assurance that qualitative and quantitative accept / reject criteria are g adequately defined.

d. PSI and contractors' procedures and instructions
                       ,

which had been approved by PSI Quality Assurance r- prior to the Confirming Order will be reviewed again and revised as necessary to assure that these documents contain the necessary accept / reject criteria and meet the requirements .{, of the PSI Project Quality Assurance Manual prior

            '

to resumption of each type of activity by PSI and

  -

the contractors. [

e. Pre planning meetings will be scheduled prior to start of critical or new types of construction activity to review the construction procedures
  -
      -

and accept / reject criteria. PSI Construction Management and contractor management are attendees at these meetings. These meetings will 1: resolve procedural conflicts and differences in interpretation of accept / reject criteria prior to commencement of the work.

4. Training im To provide assurance that the responsibility to ,
                                                                               '

exercise stop work authority when unacceptable conditions are observed and to assure the proper

        -                  understanding and interpretation of the
    '

accept / reject criteria, training programs will be i initiated to train construction and inspection )

personnel. The training program for the Marble
    "

Hill Project is described in Part III, Section C, of this report. III-F-3,

          -
                                                                       -

m

             '*
    ....-
     "?*

G. DESCRIPTION OF INSPECTION PLANNING Item (7) of Part IV of the Confirming Order is whether and the extent to which PSI has: )

   %

E::,  ! ' Es

 .

Described the system for assuring inspections on a l timely basis including complete inspection procedures . VE and preplanning of activities to assure availability

[5 of trained inspectors, j r., The ability to perform timely inspections is a direct function of the availability of inspectors. Work to be done can be matched with available inspection manpower ,

_ resources both on short and long term basis. l l IF

    =              For short term inspection planning, specific work packages,          i
                                                                                        '

consisting of discrete schedulable activities, shall be developed by Project Control and evaluated by Quality Assurance for inspection manpower requirements. Construction schedules shall be revised to make optimum use e of available human and equipment resources. Construction

    '

work shall not be scheduled beyond the capability to verify , quality. Effectiveness of the program will be assured by Quality Assurance participation in the work planning, by PSI surveillance and audit, and by the enhanced authority C of the PSI Inspectors and Quality Assurance Manager to stop processes where it appears that quality may be jeopardized.  ; E , f Long term matching of inspection resources with work will  ! be accomplished by Quality Assurance review of projected l e work forces of PSI and its contractors. This review will l [E permit recruiting and training activities to be carried out

   '

in such a manner as to provide trained Quality Assurance ' personnel necessary to assure the quality of the work. 5 As a part of the revised PSI Quality Assurance Program, > inspectors shall be provided with approved inspection

     ._

procedures, instructions, and checklists prior to

     "~

performing inspection operations. These documents shall contain identification of characteristics to be inspected, _ identification of personnel or groups performing the inspection, a description of the method of inspection, accept / reject criteria, verification of completion of inspection, and a record of the results of the inspection. To further assure that inspections are done in a timely l manner, PSI will identify specific hold points be l g- established in the contractor's planning and make i la provisions for notification on " hold" points. This program, coupled with having the work effort managed on an 4

      %             " area" basis, with inspectors assigned to each area, will b              assure timely inspections.

u _ III-G-1,

           -
                                                . ._                            - _ - .
.?

L - >

  .=
  -

H. DESCRIPTION OF PSI ASME CODE PROGRAM ,: :Ef..:

Ci Item (8) of Part IV of the Confirming Order is whether and
                '

the extent to which PSI has:

' EE
jg Described how the Licensee intends to manage the program covered by Section III of the ASME Nuclear
  .. .                          Components Code including the technical responsibility for all design efforts of the NSSS and A/E and the

. $:.~~ administrative control of design and manufacturing effort of all component manufacturers.

   .                     The PSI Project Quality Assurance Manual has been developed to address PSI's responsibilities as an Owner as defined by E.                    the ASME Code, and to address non-ASME Code activities for safety-related construction.
. The PSI ASME Quality Assurance Program has been developed Ei to assure that PSI responsibilities as an N-Certificate
    ==                   holder for piping systems comply with ASME Code requirements and to ensure achievement of the highest
    ~"

feasible degree of functional integrity of piping systems.

:: The program was approved and issued on January 2,1980 and became ef fective for implementation on February 8,1980.

m An interim letter of authorization has been issued by the 3.i. ASME. n. In addition, the concerns raised by the National and i Indiana Boiler and Pressure Vessel Boards have been

~!                         addressed.

h:. 1. General Responsibilities of PSI as Owner

a. The Project Quality Assurance Manual defines PSI's responsibility as an Owner under the applicable rules of NCA 3200 of the ASME Code.
b. PSI has obtained an Owner's Certificate of i Authorization as required by the ASME Code.
c. PSI will certify and file the Owner's Data Report
!

as required by NCA 3270 of the ASME Code.

d. PSI or its designee will assure that overpressure protection requirements are designated for each 5E component or system.
              *
e. PSI has obtained a written agreement with an Authorized Inspection Agency.

E L;;

      ?
      =
      . . .

III-H-1

                  -
                                                                                     .__

i *

; E2. . *
f. Prcperation of Dasign Specificctions is performed rd. by PSI or its Design Subcontractor. The Design
}!!l
  • Specifications are reviewed by the PSI Project Engineering Manager to assure that ASME Code requirements are met. The Design Specifications is.. are certified by PSI or its designee'in

~ Ei accordance with ASME Code requirements. 15 g. Review and release of Design Specifications is

= performed by PSI Project Engineering and Quality Assurance to assure inclusion of ASME Code requirements.

E

h. Review of component , manufacturers' Quality
      ;

Assurance Programs and ASME Code authorizations is performed by PSI Quality Assurance.

              -
i. Periodic surveillance at the component manufacturers' facilities is performed by PSI Quality Assurance to determine compliance with their approved ASME Quality Assurance Programs.
j. PSI Project Engineering reviews technical. changes to the Design Specification to assure compliance with ASME Code.
k. PSI Project Engineering or its qualified Design Subcontractor reviews and certifies the review of
l Component Design Reports.

t

1. Physical receipt inspection and review of

,_ documentation is performed by PSI Quality ' Assurance upon delivery of the component to the project site.

=
2. General Responsibilities of PSI as an N-Certificate Holder
a. The Quality Assurance Manager, under authority l from the Vice President-Electric System, has been delegated responsibility and authority for l implementation and maintenance of the ASME  !

Quality Assurance Program as well as evaluating )

                                                                             ;

its effectiveness. 2; b. The PSI Project Engineering Manager is

    "                      responsible for design activities associated with the Marble Hill Project.

h=

  • l~ c. Sargent & Lundy Enginects.have been retained by j PSI as the Design Subcontractor for all ASME Code l l piping' systems except for reactor coolant piping l systems for the Marble Hill Project.

i l =. . l 1 III-H-2 1

          -
                                                   .

__ __

          .     .
c. Enginrcring end technical documents are controlled in accordance with the document control provisions of the ASME Quality Assurance Program.
4. Acquisition of "N" Stamp
a. PSI will arrange for an ASME implementation
 =r                         survey of the Marble Hill Project timed so that ji                         the survey will start the same date the Confirming Order is lifted with respect to Code work on piping systems,
b. To assure that the program for Code activities
          -                 progresses satisfact*orily and is being
 =!                         implemented properly, the following actions are being taken:
i. PSI has retained an independent consultant (NUTECH) to:

(a) Provide development of training programs for PSI personnel on Code requirements and the ASME Quality Assurance Program. (b) Provide assistance to PSI in developing detailed implementing procedures. (c) Perform periodic reviews at the job site to assure that the program is _ being properly implemented. H (d) Perform an audit of Code activities by PSI shortly after commencement of Code activities.

.
5. National and Indiana Boards' Concerns
  . . . -
a. The National and Indiana Boards conducted a series of reviews and meetings at the Marble Hill site during the period of June 12, 1979 through
  =                          October 12, 1979. The results of these reviews were documented in two letters from the National Board to PSI which were dated July 12, 1979 and
   =                         November 12, 1979.
b. PSI has conducted a review of the items addressed
            .                in these letters and has responded in a letter from S. W. Shields to the Chief Inspector, Indiana Boiler and Pressure Vessel Board, dated
    -                        January 17, 1980, with copies to the National Board and the Nuclear Regulatory Commission, Region III.

eoe* l , ! III-H-4 i l

              .

_ be . This letter outlinrd 14 items which are included in PSI's program f or continuing with ASME Code e work and addressed the specific findings of the National and Indiana Board reviews. The 14 items

       '

are as follows:

i. PSI has had its ASME Quality Assurance Program reviewed by the ASME Survey Team and as a result of their findings, expect to

- receive an interim letter from the ASME soon. ii. PSI will request ASHE to survey its implementation of the ASME Quality Assurance Program within six months of resuming Code work on piping systees. (See Note 1 below - not part of letter). iii. PSI has an Authorized Nuclear Inspector (ANI) on site who will be kept advised of Code related activities. iv. PSI's ANI is reviewing the documentation for the Code work PSI has perf ormed in the past, to assure,that the requirements of PSI's ASME Quality Assurance Program have been met. Any variance from the Quality Assurance Program will be corrected in accordance with that program.

,
v. All records and documentation will continue to be available to PSI's ANI and all subcontractors at the site. Copies of any Code related documentation reported by PSI's subcontractorr will be provided.
   .

vi. A training program will be implemented to

 ~

assure that PSI personnel involved in Quality Assurance and Code related work

 ;;;                       understand the requirements of PSI's Quality Assurance Program and the ASME Code as these documents relate to their work.

ki vii. PSI will assure that the subcontractors at the site are advised of the elenents of PSI's ASME Quality Assurance Program and the ASME Code, as it relates to PSI's interfaces with them in PSI's capacity as an N-Certificate holder.

     .

1.) Subsequent to the January 17, 1980 letter, the decision was made to arrange for the survey to start i the same date the Confirming Order is lifted with l ur respect to Code work on piping systems. !- III-H-5

                                              .

it= .. .

,-

viii. PSI has mtda a thorough search of the ru records to determine the quantity and location of the safety-related Code h". materials furnished by PSI. Of the 87 pieces of material furnished to Cherne, four

 -

are installed (not embedded) and'the remaining are stored in place or in the laydown areas. These are in a " hold"

status. Two pieces of material were furnished to Stewart Mechanical which are installed and embedded.

       ..

ix. For the material furnished by PSI to Cherne, PSI has reviewed the documentation and determined that it is acceptable. The two 7.., pieces furnished to Stewart Mechanical are

      .

being checked. 5 x. PSI is currently searching records and documentation with its subcontractors to verify that piping subassemblies comply with

   =                          the requirements of the Code. A sampling of
   =                          data packages from each of the piping suppliers is currently underway to determine if any generic problems exist.
  ~

xi. The purchase specifications will be modified to permit radiographs to be furnished in a

    "

more logical sequence. xii. PSI will request ITT Grinnell to ask their

   -

material supplier (National Annealing Box Co.) to obtain official documentation from ASME verifying that their scope of work included the manufacture of tubular products with filler metal added. This is to cover

   "                           the period from January 1977 through January 1980.

E xiii. PSI will request ITT Grinnell to obtain verification from Gulf and Western that T/F Houston Div. and Gulf and Western Energy Products Group Plant #4 are the identical plant. i l F xiv. National and Indiana Boards will be nocified of significant events with regard to PSI's ASME Code work.

          .
c. PSI reviewed the above fourteen point program with representatives of the National and Indiana
     "~

Boards in a meeting on January 16, 1980. Those

        -

representatives indicated their concurrence with this program. III-H-6

             .
                                                                                     .
          <>    .

i _ 1 i

 =i-
                                                                                           ?

I. DESCRIPTION OF SYSTEM OF INDOCTRINATION hg , Item (9) of Part IV of the Confirming Order is whether and the extent to which PSI has: hb Described the system to train all levels of - construction personnel in the need and importance of satisfying quality requirements and to encourage all

 , , , ,EE                 personnel to communicate, without recrimination on the part of the licensee or its contractors, their concerns or knowledge of improper construction                   I I

practices to proper levels of management for I4 evaluation and resolution *. I PSI will implement indoctrination of its site personnel as a part of the training program described in Part III, Section C, above. Additionally, PSI will provide material to the contractors, who will indoctrinate craft personnel as they are assigned to the project.

1. Content W

An audio-visual presentation is currently being produced to be presented to construction personnel. This presentation will be used as an orientation 9 program for new construction personnel and is designed to address the uniqueness of building a nuclear powe.- plant. The presentation strongly emphasizes the need E for quality work and further addresses the issue of

  -

reporting without recrimination. This presentation will be available for use about March 1980. E Indoctrination for site personnel will include the requirements of 10 CFR 21. In addition to the posters

      -

required by 10 CFR 21, each employee is given a handbook, outlining the provisions of 10 CFR 21, for personal reference. This booklet stresses that recrimination is not associated with any such

  .
                                   .
    ....                    reporting.

12

2. Implemettation The indoctrination program is being developed in modular form. This program will be presented to current employees and to each new employee upon

- w. arrival at the job site.

          .

L ':: 22 Z.

I III-I-1

              -

_ , _ _ . __ _ __ _ _ -

_ . _ _

                                                                                                                 .
, . . .

63

3. Rsecrds
=

l$5 Records will be maintained identifying each employees' participation in the indoctrination program. i?;:

!: 4. Other
t
    ....,

In addition to the above, PSI is developing posters

    ',[                    and other materials that will be prcminently displayed
 '

on the job site as a reminder of PSI's concern and commitment to quality and its policy of no recrimination for reporting. '+ C.3 2 T. e gau

                     '
irs
Eii
                                                                                                               .

I.,

<=

l

!

a

  • 1
                                                                                                                   !

l

.! ::       ..

i =: , l

  !

I i += l

          =                                                                                                        l

4 ._

.n.

l

r -
        "T
       'd.'.'.
        '9 1

k

         . .

4

        .d4 III-I-2
                   *
                     .-                                          . . .-- - . . . _ . ~ , - . . - . . . . - . .}}