Category:Meeting Agenda
MONTHYEARPMNS20211527, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211528, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211529, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211530, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211531, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211532, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211533, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211534, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports ML21004A2372021-01-0404 January 2021 Standard Design Approval Teleconference ML20349D0382020-12-14014 December 2020 Standard Design Approval Teleconference ML20321A2912020-11-16016 November 2020 Standard Design Approval Teleconference ML20314A0402020-11-0909 November 2020 Standard Design Approval Teleconference ML20314A2382020-11-0909 November 2020 Standard Design Approval Teleconference ML20314A2392020-11-0909 November 2020 Standard Design Approval Teleconference ML20305A3112020-10-31031 October 2020 Standard Design Approval Teleconference ML20300A5582020-10-26026 October 2020 Standard Design Approval Teleconference ML20300A5602020-10-26026 October 2020 Standard Design Approval Teleconference ML20300A5612020-10-26026 October 2020 Standard Design Approval Teleconference ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML19282B1202019-10-12012 October 2019 Summary of January 9, March 5, April and August 1, 2019, Public Teleconference with NuScale Power, LLC, Regarding NON-LOCA TR RAI Responses (PROJ0769) ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19240A3892019-10-0303 October 2019 Summary of January 8 and 29, 2019 and April 17, 2019, Public Teleconference with NuScale Power, LLC, Regarding Responses to Staff Request for Additional Information (52-048) ML19256B7002019-09-23023 September 2019 Summary of Public Meeting with NuScale to Discuss Test #107 and Test #47 in the Initial Test Program ML19260G5382019-09-23023 September 2019 Summary of 9-4-19 Public Meeting with NuScale to Discuss ITAAC ML19256B4942019-09-18018 September 2019 Summary of Public Meeting with NuScale to Discuss Radiation Shielding ITAAC ML19247C0342019-09-18018 September 2019 Summary of August 26 2019 Public Meeting with NuScale on Chapter 20 ML19252A0212019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting with NuScale to Discuss Test #6, Test #47, and Test #50 in the Initial Test Program ML19255D2722019-09-12012 September 2019 Aug 26, 2019, Summary of Public Teleconference on NuScale Chapter 4 ML19228A2502019-08-27027 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19217A3082019-08-15015 August 2019 Summary of Public Meeting with NuScale to Discuss Initial Test Program Test #107 for the Remote Shutdown Workstation ML19212A6882019-08-12012 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19199A0152019-07-31031 July 2019 Summary of Public Meeting on Various ITAAC Issues ML19204A2772019-07-22022 July 2019 Discussion Topic July 22, 2019 Public Meeting to Discuss Interface Requirement Associated with the NuScale Design Certification Application ML19134A3632019-07-0808 July 2019 Summary of the April 9, 2019 Public Meeting to Discuss Accident Source Term (AST) Methodology and Post Exemption Associated with the NuScale Design Certification Application ML19176A2502019-07-0808 July 2019 Summary of June 17, 2019 Public Meeting with NuScale on MBDBE ML19151A3382019-06-0505 June 2019 Summary of Public Meeting with NuScale to Discuss ITAAC for the Module Protection System and Safety Display and Indication System ML18340A0132019-04-17017 April 2019 July 24, 2018, Summary of Category 1 Public Teleconference with Nuscale Power, LLC, Design Certification Application Section 3.7, Seismic Design, and 3.8, Design of Category I Structures. ML19084A1782019-04-16016 April 2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC, to Discuss the NuScale Turbine Missile Analysis ML18333A3612019-04-11011 April 2019 & 08/28/18 Summary of Public Teleconference with Nuscale Power, LLC, Regarding Responses to Staff Requests for Additional Information ML19065A1242019-04-0505 April 2019 Summary of the February 14 and 27, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the Nuscale Design Certification Application ML19085A0412019-03-26026 March 2019 02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application ML19084A1362019-03-25025 March 2019 Summary of Meeting with NuScale Power, LLC to Discuss Nuclear Regulatory Commission Staff'S Options to Review Nuscale'S Design Certification Application, Tier 2, Chapter 20, Mitigation of Beyond-Design-Basis Events ML19017A1532019-02-0606 February 2019 Summary of Public Meeting with NuScale to Discuss Response to Request for Additional Information 8894 Question 03.11-15 ML19010A0932019-02-0404 February 2019 December 19, 2018, and January 9, 2019 - Summary of Public Meeting with NuScale to Discuss ITAAC Related to Electrical Penetration Assemblies ML18337A0192018-12-0606 December 2018 Summary of Category 1 Public Teleconference to Discuss Technical Specification Potential Phase 2 Open Items Associated with the NuScale Power, LLC Design Certification Application 2021-12-03
[Table view] Category:Meeting Summary
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss Nuscale’S Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20216A5462020-08-19019 August 2020 Public Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19302E4602019-10-29029 October 2019 July 22, 2019 Public Meeting - NuScale Interface Items for Penetrations and Ventilation Ducts ML19297C8772019-10-24024 October 2019 Summary of Public Meeting with NuScale to Discuss ECCS Test #47 ML19291A8872019-10-21021 October 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory Close-out Audit of NuScale Power, LLC, Component Design Specification ML19282B1202019-10-12012 October 2019 Summary of January 9, March 5, April and August 1, 2019, Public Teleconference with NuScale Power, LLC, Regarding NON-LOCA TR RAI Responses (PROJ0769) ML19289C3982019-10-12012 October 2019 Summary of the January 9, 2019, March 5, 2019, April 23, 2019, and August 12, 2019, Public Teleconferences with NuScale Power, LLC ML19281B3982019-10-10010 October 2019 Summary of September 23, 2019 - Public Teleconference on NuScale Chapter 4 ML19281B2612019-10-0909 October 2019 Sept 25, 2019 - Public Teleconference on NuScale SDA ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19240A3892019-10-0303 October 2019 Summary of January 8 and 29, 2019 and April 17, 2019, Public Teleconference with NuScale Power, LLC, Regarding Responses to Staff Request for Additional Information (52-048) ML19256B7002019-09-23023 September 2019 Summary of Public Meeting with NuScale to Discuss Test #107 and Test #47 in the Initial Test Program ML19260G5382019-09-23023 September 2019 Summary of 9-4-19 Public Meeting with NuScale to Discuss ITAAC ML19256B4942019-09-18018 September 2019 Summary of Public Meeting with NuScale to Discuss Radiation Shielding ITAAC ML19247C0342019-09-18018 September 2019 Summary of August 26 2019 Public Meeting with NuScale on Chapter 20 ML19252A0212019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting with NuScale to Discuss Test #6, Test #47, and Test #50 in the Initial Test Program ML19255D2722019-09-12012 September 2019 Aug 26, 2019, Summary of Public Teleconference on NuScale Chapter 4 ML19242B8092019-08-30030 August 2019 Discussion Topic for August 13 and August 19, 2019, Public Meeting to Discuss AST Methodology and H2 and O2 Monitoring for the NuScale Design Certification Application ML19242B8802019-08-30030 August 2019 Discussion Topic for July 24, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application ML19242B9932019-08-30030 August 2019 Discussion Topic May 14, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the NuScale Design Certification Application ML19242C0162019-08-30030 August 2019 Discussion Topic May 8, 2019, Public Meeting to Discuss Post-Accident Sampling Exemption Request Associated with the NuScale Design Certification Application ML19242C4792019-08-30030 August 2019 Discussion Topics for the March 12 2019 Public Meeting to Discuss Neutron Absorbers ITAAC and COL Information Item 9.1-8 Associated with the NuScale Design Certification Application ML19228A2502019-08-27027 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19217A3082019-08-15015 August 2019 Summary of Public Meeting with NuScale to Discuss Initial Test Program Test #107 for the Remote Shutdown Workstation ML19212A6882019-08-12012 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19199A0152019-07-31031 July 2019 Summary of Public Meeting on Various ITAAC Issues ML19149A5052019-07-22022 July 2019 May 22 2019 NRC-NuScale Public Meeting Summary_Reduced Staffing Plan Validation Activities ML19171A1292019-07-17017 July 2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss of Section 3.9.4 Control Rod Drive System of the Design Certification Application ML19134A3632019-07-0808 July 2019 Summary of the April 9, 2019 Public Meeting to Discuss Accident Source Term (AST) Methodology and Post Exemption Associated with the NuScale Design Certification Application ML19176A2502019-07-0808 July 2019 Summary of June 17, 2019 Public Meeting with NuScale on MBDBE ML19178A3502019-06-27027 June 2019 Discussion Topics for April 09, 2019 Public Meeting with NuScale - Public Version ML19242B9342019-06-12012 June 2019 Discussion Topic for June 12, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application ML19151A3382019-06-0505 June 2019 Summary of Public Meeting with NuScale to Discuss ITAAC for the Module Protection System and Safety Display and Indication System ML19087A2402019-05-0606 May 2019 Summary of March 5, 2019 Public Meeting on NuScale EPZ Sizing Methodology TR ML19106A0452019-04-24024 April 2019 Summary of Public Teleconference Held April 15, 2019, Regarding the Inspections, Tests, Analyses, and Acceptance Criteria in NuScale Power Llc'S Design Certification Application ML18340A0132019-04-17017 April 2019 July 24, 2018, Summary of Category 1 Public Teleconference with Nuscale Power, LLC, Design Certification Application Section 3.7, Seismic Design, and 3.8, Design of Category I Structures. ML18348A9442019-04-17017 April 2019 Summary of the Category 1 Public Teleconference with NuScale Power, LLC Design Certification Application Section 3.6.3, Leak-Before-Break Evaluation Procedures, and Section 3.9.4, Control Rod Drive System. ML18333A3612019-04-11011 April 2019 & 08/28/18 Summary of Public Teleconference with Nuscale Power, LLC, Regarding Responses to Staff Requests for Additional Information ML19065A1242019-04-0505 April 2019 Summary of the February 14 and 27, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the Nuscale Design Certification Application ML19085A0412019-03-26026 March 2019 02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application 2024-01-31
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss Nuscale’S Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
June 21, 2018 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Sitting, and Environmental Assessment, Office of New Reactors FROM: Marieliz Vera, Project Manager /RA/
Licensing Branch 1 Division of Licensing, Sitting, and Environmental Assessment, Office of New Reactors
SUBJECT:
SUMMARY
OF THE MAY 29, 2018, CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION SECTION 3.7 "SEISMIC DESIGN," AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference on May 29, 2018, to discuss Final Safety Analysis Report Tier 2, Chapter 3, Design of Structures, Systems, Components and Equipment. Sections 3.7, Seismic Design and 3.8, Designs of Category I Structures, of the NuScale Power, LLC (NuScale) Design Certification. Participants included personnel from NuScale and members of the public.
The public meeting notice can be found in the Agencywide Documents Access and Management Systems under Accession No. ML18136A534. This meeting notice was also posted on the NRC public Web site.
The meeting agenda and list of participants can be found in Enclosures 1 and 2, respectively.
CONTACT: Marieliz Vera, NRO/DNRL 301-415-5861
S. Lee 2 Summary:
The purpose of this meeting was to discuss the responses for Requests for Additional Information (RAI) 8934, Question 03.07.02-15 (ML18127B711), 8936, Question 03.07.02-7 (ML18031B204), 8970, Question 03.08.04-10 (ML18031A915) 8963, Question 03.08.05-12 (ML18074A257) and RAI Question 03.08.05-13 (ML18094B105).
First NRC staff discussed RAI 8934, Question 03.07.02-15 regarding the hydrodynamic pressure accounting for 3D fluid-structure interaction (FSI) effects of ultimate heat sink pool.
The staff asked for NuScale to clarify if the methodology of FSI correction for foundation is the same as that for walls, and the staff will provide written feedback on other technical issues addressed in the RAI response prior to next bi-weekly meeting. NuScale will submit a supplemental response addressing the staff comments.
NuScale asked for further clarification on NRC Feedback for RAI 8936, Question 03.07.02-7S1 (Enclosure3). The staff indicated that NuScale should provide specific clarification questions on the feedback. This item will be discussed on the next public meeting.
For RAI 8970, Question 03.08.04-10, the NRC staff asked NuScale to clarify whether, American National Standards Institute/ American Society of Civil Engineers 8 was used as per N690-12, Section NA3 for the design evaluations of stainless steel members, assemblies and connections as per N690-12, Section NA3 (e.g., for the evaluation of ASTM A479, Type UNS S21800 bolts) and if not used, to provide justification for the use of alternative criteria. NuScale will submit a supplemental response addressing the staff comments.
With respect to the staffs request for wall in-structure response spectra (ISRS) as per NRC Feedback for RAI 8974, Question 03.08.04-23, NuScale committed to submit a supplemental response addressing the lack of safety-related equipment attached to the Reactor Building (RXB) walls, and description of their change process for equipment that may need to be attached to the RXB walls, including the development of wall ISRS used for the design or qualification of such equipment with consideration of the amplified out-of plane response near the center of the wall.
RAI 8963, Question 03.08.05-12: Applicant is requested to incorporate the information (as markups) that was provided in its response on October 17, 2017 (ML17290B267), to the final safety analysis report (FSAR). Furthermore, the applicant is also requested to incorporate a similar information (as markups) in tabular format for the Control Building (CRB) to the FSAR.
NuScale will submit a supplemental response addressing the staff comments.
RAI 8963, Question 03.08.05-13: Applicant did not provided sufficient information in its response on October 17, 2017 (ML17290B267). In its supplemental response on April 4, 2018 (ML18094B106 and ML18094B107, Enclosure 1), the applicant only listed five (5) types of design checks for the RXB and CRB resulted from 50 percent reduced soil stiffness to the entire free-field of soil below the triple-building model. However, it is not clear to the staff whether the listed design checks include all possible combinations; e.g.; Maximum Foundation bottom tilt angle of the RXB, was not considered. Furthermore, the applicant did not provided the results of these design checks, in its markups to the FSAR; and whether these design checks were considered in the final design and/or needed to be considered in the load combinations of RXB and CRB foundations. NuScale will submit a supplemental response addressing the staff comments.
S. Lee 3 For RAI 8963, Question 03.08.05-22, the discussion of staff feedback was postponed for the next meeting.
Docket No.52-048
Enclosures:
- 1. Meeting Agenda
- 2. List of Attendees cc w/encls.: DC NuScale Power, LLC Listserv
ML18159A424 *via email NRC-002 OFFICE NRO/DLSE/LB1: PM NRO/DLSE/LB1: LA NRO/DNRL/LB1: PM NAME MVera SGreen MVera DATE 6/07/2018 06/12/2018 6/20/2018
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION SECTION 3.7, "SEISMIC DESIGN," AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" May 29, 2018 11:00 p.m. - 12:00 p.m.
AGENDA Public Meeting 11:00-11:05am Welcome and Introductions 11:05-11:55am Discussion of the Request for Additional Information (RAI) 8934, 8970 and 8963 11:55-12:00pm Public - Questions and Comments Enclosure 1
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION SECTION 3.7, "SEISMIC DESIGN," AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" LIST OF ATTENDEES May 29, 2018 NAME AFFILIATION Marieliz Vera U.S. Nuclear regulatory Commission (NRC)
Manas Chakravorty NRC John Ma NRC Ata Istar NRC Bhagwat Jain NRC Robert Roche-Rivera NRC Vaughn Thomas NRC Alissa Neuhausen NRC Pravin Patel NRC George Wang NRC Sunwoo Park NRC Marty Bryan NuScale Power, LLC (NuScale)
Josh Parker NuScale Evren Ulku NuScale Andre LEplattenier NuScale Giulio Flores NuScale Craig Harwood NuScale Tom Ryan NuScale Kirsten McKay NuScale Ed Heald NuScale Jeremy Aartun NuScale Wayne Massie NuScale Mohsin Kahn NuScale Marvin Lewis Public Sarah Fields Public Enclosure 2
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION SECTION 3.7, "SEISMIC DESIGN," AND 3.8, "DESIGN OF CATEGORY I STRUCTURES" Staff Feedback on Request Additional for Information 8936 Question 03.07.02-07 In response to Request for Additional Information (RAI) 8936, Question 03.07.02-7, the applicant provided information concerning the validation and verification (V&V) of the computer programs mentioned in Design Control Document (DCD) Tier 2, Section 3.7.5. The staff reviewed the RAI response and identified the following issues that need to be addressed by the applicant:
(a) The applicant stated in the RAI response that the software V&V covers the full range of parameters used in NuScale design-basis seismic demand calculations including the discretization and aspect ratio of finite elements, Poissons ratio, frequencies of analysis, and other parameters pertinent to seismic system analyses. However, the staff identified no such information included in the RAI response. Tables 8 through 16 in the RAI response cover 30 test cases developed from 9 different problems and the applicant states that these problems are designed to check the capabilities of SASSI2010 under various conditions. The staff notes that these test cases address certain aspects of SASSI2010; however, it appears that they do not specifically address those parameters mentioned in the staffs RAI question.
The applicant is requested to provide in its supplemental or revised RAI response information pertaining to SASSI2010 V&V for the range of parameters used in NuScale seismic demand calculations including the evaluation of (1) mesh size of finite elements, (2) aspect ratio of finite elements, (3) Poissons ratio, (4) frequencies of analysis, and (5) other pertinent capabilities of the program such as the maximum number of interaction nodes, the maximum number of soil layers, accuracy of interpolated transfer functions, and accuracy of the Extended Subtraction Method (ESM) employed. The applicant should also describe the acceptance criteria used in its V&V process. The staff recognize that studies of certain parameters may be captured in separate RAI responses (e.g., finite element mesh sensitivity, aspect ratio, ESM validation) and, in such cases, the applicant may provide appropriate references to these RAIs.
(b) In the RAI response, the applicant included Tables 8 through 16 covering 9 problems and 30 test cases considered for SASSI2010 V&V. These tables include descriptions of the test cases analyzed, such as the element types, model configurations, and excitations applied. However, the methods and results of verification for test cases analyzed are not provided in the tables. The applicant is requested to provide in the tables the methods and results for V&V test cases analyzed, or provide references to documentations that contain such information.
Enclosure 3
(c) Table 17 of the RAI response describes comparison of dynamic characteristics between the SASSI2000 and SAP2000 models. The applicant indicates that Problem 10, Cases 1 and 2 deal with a nuclear reactor building and control building, respectively.
The staff notes the topic on the comparison of SASSI2010 and SAP2000 models is discussed in DCD Tier 2, Section 3.7.2.1.2.6. However, the staff finds the information about the reactor and control building SASSI models in Table 17 of the RAI response is similar to but not quite the same as the information about the corresponding models presented in DCD Tier 2, Tables 3.7.2-1 and 3.7.2-9. The applicant is requested to clarify if the reactor and control building models described in Table 17 of the RAI response represent the models used in design-basis seismic demand calculations for the NuScale RXB and CRB; if not, justify how the findings from analysis cases described in Table 17 of the RAI response apply to the comparison of SASSI2010 and SAP2000 models for NuScale RXB and CRB.
In Table 17 of the RAI response, the applicant states that the models used in SASSI2010 Verification Problem 10 is described in Reference 14 of ERF010-6084, Rev. 0; however, the source is not identified. Please provide the source of the reference as appropriate.
(d) In DCD Tier 2, Section 3.7.5, the applicant states that software validation and verification was performed in accordance with the NuScale Quality Assurance program.
The applicant should make calculations and documentations pertaining to the validation and verification of computer programs discussed in DCD Tier 2, Section 3.7.5 available for staffs regulatory audit as necessary.
Based on above review, RAI 8936 Question 03.07.02-7 will be tracked as an open item and the applicant should address staffs concern in its supplemental or revised RAI response.