Issue date | Title | Topic | |
---|---|---|---|
ML24004A047 | 31 January 2024 | U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request | Exemption Request |
ML20274A108 | 30 September 2020 | Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics | |
ML20216A546 | 19 August 2020 | Public Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System | |
ML20219A411 | 10 August 2020 | Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 | |
ML20108F508 | 27 May 2020 | Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR | Safe Shutdown Earthquake Probabilistic Risk Assessment Incorporated by reference Earthquake |
ML20114E216 | 4 May 2020 | Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application | |
ML20114E019 | 27 April 2020 | Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application | |
ML20114E039 | 23 April 2020 | Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process | |
ML20097C229 | 7 April 2020 | Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution | |
ML20072M798 | 19 March 2020 | Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan | |
ML20072K523 | 11 March 2020 | Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) | Probabilistic Risk Assessment |
ML19345E936 | 13 January 2020 | Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference | Incorporated by reference |
ML19302E460 | 29 October 2019 | July 22, 2019 Public Meeting - NuScale Interface Items for Penetrations and Ventilation Ducts | Fire Barrier |
ML19297C877 | 24 October 2019 | Summary of Public Meeting with NuScale to Discuss ECCS Test #47 | |
ML19291A887 | 21 October 2019 | U.S. Nuclear Regulatory Commission Summary Report of Regulatory Close-out Audit of NuScale Power, LLC, Component Design Specification | Weak link |
ML19282B120 | 12 October 2019 | Summary of January 9, March 5, April and August 1, 2019, Public Teleconference with NuScale Power, LLC, Regarding NON-LOCA TR RAI Responses (PROJ0769) | |
ML19289C398 | 12 October 2019 | Summary of the January 9, 2019, March 5, 2019, April 23, 2019, and August 12, 2019, Public Teleconferences with NuScale Power, LLC | |
ML19281B398 | 10 October 2019 | Summary of September 23, 2019 - Public Teleconference on NuScale Chapter 4 | |
ML19281B261 | 9 October 2019 | Sept 25, 2019 - Public Teleconference on NuScale SDA | |
ML19260G735 | 7 October 2019 | Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 | |
ML19240A389 | 3 October 2019 | Summary of January 8 and 29, 2019 and April 17, 2019, Public Teleconference with NuScale Power, LLC, Regarding Responses to Staff Request for Additional Information (52-048) | Probabilistic Risk Assessment |
ML19256B700 | 23 September 2019 | Summary of Public Meeting with NuScale to Discuss Test #107 and Test #47 in the Initial Test Program | Exemption Request |
ML19260G538 | 23 September 2019 | Summary of 9-4-19 Public Meeting with NuScale to Discuss ITAAC | |
ML19256B494 | 18 September 2019 | Summary of Public Meeting with NuScale to Discuss Radiation Shielding ITAAC | |
ML19247C034 | 18 September 2019 | Summary of August 26 2019 Public Meeting with NuScale on Chapter 20 | |
ML19252A021 | 12 September 2019 | August 27, 2019, Summary of Public Meeting with NuScale to Discuss Test #6, Test #47, and Test #50 in the Initial Test Program | Ultimate heat sink |
ML19255D272 | 12 September 2019 | Aug 26, 2019, Summary of Public Teleconference on NuScale Chapter 4 | |
ML19242B809 | 30 August 2019 | Discussion Topic for August 13 and August 19, 2019, Public Meeting to Discuss AST Methodology and H2 and O2 Monitoring for the NuScale Design Certification Application | |
ML19242B880 | 30 August 2019 | Discussion Topic for July 24, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application | Surveillance Frequency Control Program |
ML19242B993 | 30 August 2019 | Discussion Topic May 14, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the NuScale Design Certification Application | Coatings |
ML19242C016 | 30 August 2019 | Discussion Topic May 8, 2019, Public Meeting to Discuss Post-Accident Sampling Exemption Request Associated with the NuScale Design Certification Application | Exemption Request |
ML19242C479 | 30 August 2019 | Discussion Topics for the March 12 2019 Public Meeting to Discuss Neutron Absorbers ITAAC and COL Information Item 9.1-8 Associated with the NuScale Design Certification Application | |
ML19228A250 | 27 August 2019 | Summary of Public Meeting with NuScale to Discuss Structural ITAAC | |
ML19217A308 | 15 August 2019 | Summary of Public Meeting with NuScale to Discuss Initial Test Program Test #107 for the Remote Shutdown Workstation | |
ML19212A688 | 12 August 2019 | Summary of Public Meeting with NuScale to Discuss Structural ITAAC | |
ML19199A015 | 31 July 2019 | Summary of Public Meeting on Various ITAAC Issues | |
ML19149A505 | 22 July 2019 | May 22 2019 NRC-NuScale Public Meeting Summary_Reduced Staffing Plan Validation Activities | |
ML19171A129 | 17 July 2019 | Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss of Section 3.9.4 Control Rod Drive System of the Design Certification Application | Boric Acid Ultimate heat sink |
ML19134A363 | 8 July 2019 | Summary of the April 9, 2019 Public Meeting to Discuss Accident Source Term (AST) Methodology and Post Exemption Associated with the NuScale Design Certification Application | Exemption Request |
ML19176A250 | 8 July 2019 | Summary of June 17, 2019 Public Meeting with NuScale on MBDBE | |
ML19178A350 | 27 June 2019 | Discussion Topics for April 09, 2019 Public Meeting with NuScale - Public Version | Exemption Request |
ML19242B934 | 12 June 2019 | Discussion Topic for June 12, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application | High Radiation Area Operator Manual Action Surveillance Frequency Control Program |
ML19151A338 | 5 June 2019 | Summary of Public Meeting with NuScale to Discuss ITAAC for the Module Protection System and Safety Display and Indication System | |
ML19087A240 | 6 May 2019 | Summary of March 5, 2019 Public Meeting on NuScale EPZ Sizing Methodology TR | Probabilistic Risk Assessment Earthquake |
ML19106A045 | 24 April 2019 | Summary of Public Teleconference Held April 15, 2019, Regarding the Inspections, Tests, Analyses, and Acceptance Criteria in NuScale Power Llc'S Design Certification Application | |
ML18340A013 | 17 April 2019 | July 24, 2018, Summary of Category 1 Public Teleconference with Nuscale Power, LLC, Design Certification Application Section 3.7, Seismic Design, and 3.8, Design of Category I Structures. | Hydrostatic |
ML18348A944 | 17 April 2019 | Summary of the Category 1 Public Teleconference with NuScale Power, LLC Design Certification Application Section 3.6.3, Leak-Before-Break Evaluation Procedures, and Section 3.9.4, Control Rod Drive System. | Safe Shutdown Earthquake |
ML18333A361 | 11 April 2019 | & 08/28/18 Summary of Public Teleconference with Nuscale Power, LLC, Regarding Responses to Staff Requests for Additional Information | Probabilistic Risk Assessment |
ML19065A124 | 5 April 2019 | Summary of the February 14 and 27, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the Nuscale Design Certification Application | Exemption Request |
ML19085A041 | 26 March 2019 | 02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application | Boric Acid Stroke time |