Category:Meeting Agenda
MONTHYEARPMNS20211527, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211528, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211529, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211530, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211531, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211532, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211533, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports PMNS20211534, Meeting with NuScale Power, LLC on NuScale Topical Reports2021-12-0303 December 2021 Meeting with NuScale Power, LLC on NuScale Topical Reports ML21004A2372021-01-0404 January 2021 Standard Design Approval Teleconference ML20349D0382020-12-14014 December 2020 Standard Design Approval Teleconference ML20321A2912020-11-16016 November 2020 Standard Design Approval Teleconference ML20314A0402020-11-0909 November 2020 Standard Design Approval Teleconference ML20314A2382020-11-0909 November 2020 Standard Design Approval Teleconference ML20314A2392020-11-0909 November 2020 Standard Design Approval Teleconference ML20305A3112020-10-31031 October 2020 Standard Design Approval Teleconference ML20300A5582020-10-26026 October 2020 Standard Design Approval Teleconference ML20300A5602020-10-26026 October 2020 Standard Design Approval Teleconference ML20300A5612020-10-26026 October 2020 Standard Design Approval Teleconference ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML19282B1202019-10-12012 October 2019 Summary of January 9, March 5, April and August 1, 2019, Public Teleconference with NuScale Power, LLC, Regarding NON-LOCA TR RAI Responses (PROJ0769) ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19240A3892019-10-0303 October 2019 Summary of January 8 and 29, 2019 and April 17, 2019, Public Teleconference with NuScale Power, LLC, Regarding Responses to Staff Request for Additional Information (52-048) ML19256B7002019-09-23023 September 2019 Summary of Public Meeting with NuScale to Discuss Test #107 and Test #47 in the Initial Test Program ML19260G5382019-09-23023 September 2019 Summary of 9-4-19 Public Meeting with NuScale to Discuss ITAAC ML19256B4942019-09-18018 September 2019 Summary of Public Meeting with NuScale to Discuss Radiation Shielding ITAAC ML19247C0342019-09-18018 September 2019 Summary of August 26 2019 Public Meeting with NuScale on Chapter 20 ML19252A0212019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting with NuScale to Discuss Test #6, Test #47, and Test #50 in the Initial Test Program ML19255D2722019-09-12012 September 2019 Aug 26, 2019, Summary of Public Teleconference on NuScale Chapter 4 ML19228A2502019-08-27027 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19217A3082019-08-15015 August 2019 Summary of Public Meeting with NuScale to Discuss Initial Test Program Test #107 for the Remote Shutdown Workstation ML19212A6882019-08-12012 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19199A0152019-07-31031 July 2019 Summary of Public Meeting on Various ITAAC Issues ML19204A2772019-07-22022 July 2019 Discussion Topic July 22, 2019 Public Meeting to Discuss Interface Requirement Associated with the NuScale Design Certification Application ML19134A3632019-07-0808 July 2019 Summary of the April 9, 2019 Public Meeting to Discuss Accident Source Term (AST) Methodology and Post Exemption Associated with the NuScale Design Certification Application ML19176A2502019-07-0808 July 2019 Summary of June 17, 2019 Public Meeting with NuScale on MBDBE ML19151A3382019-06-0505 June 2019 Summary of Public Meeting with NuScale to Discuss ITAAC for the Module Protection System and Safety Display and Indication System ML18340A0132019-04-17017 April 2019 July 24, 2018, Summary of Category 1 Public Teleconference with Nuscale Power, LLC, Design Certification Application Section 3.7, Seismic Design, and 3.8, Design of Category I Structures. ML19084A1782019-04-16016 April 2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC, to Discuss the NuScale Turbine Missile Analysis ML18333A3612019-04-11011 April 2019 & 08/28/18 Summary of Public Teleconference with Nuscale Power, LLC, Regarding Responses to Staff Requests for Additional Information ML19065A1242019-04-0505 April 2019 Summary of the February 14 and 27, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the Nuscale Design Certification Application ML19085A0412019-03-26026 March 2019 02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application ML19084A1362019-03-25025 March 2019 Summary of Meeting with NuScale Power, LLC to Discuss Nuclear Regulatory Commission Staff'S Options to Review Nuscale'S Design Certification Application, Tier 2, Chapter 20, Mitigation of Beyond-Design-Basis Events ML19017A1532019-02-0606 February 2019 Summary of Public Meeting with NuScale to Discuss Response to Request for Additional Information 8894 Question 03.11-15 ML19010A0932019-02-0404 February 2019 December 19, 2018, and January 9, 2019 - Summary of Public Meeting with NuScale to Discuss ITAAC Related to Electrical Penetration Assemblies ML18337A0192018-12-0606 December 2018 Summary of Category 1 Public Teleconference to Discuss Technical Specification Potential Phase 2 Open Items Associated with the NuScale Power, LLC Design Certification Application 2021-12-03
[Table view] Category:Meeting Summary
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20216A5462020-08-19019 August 2020 Public Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19302E4602019-10-29029 October 2019 July 22, 2019 Public Meeting - NuScale Interface Items for Penetrations and Ventilation Ducts ML19297C8772019-10-24024 October 2019 Summary of Public Meeting with NuScale to Discuss ECCS Test #47 ML19291A8872019-10-21021 October 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory Close-out Audit of NuScale Power, LLC, Component Design Specification ML19282B1202019-10-12012 October 2019 Summary of January 9, March 5, April and August 1, 2019, Public Teleconference with NuScale Power, LLC, Regarding NON-LOCA TR RAI Responses (PROJ0769) ML19289C3982019-10-12012 October 2019 Summary of the January 9, 2019, March 5, 2019, April 23, 2019, and August 12, 2019, Public Teleconferences with NuScale Power, LLC ML19281B3982019-10-10010 October 2019 Summary of September 23, 2019 - Public Teleconference on NuScale Chapter 4 ML19281B2612019-10-0909 October 2019 Sept 25, 2019 - Public Teleconference on NuScale SDA ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19240A3892019-10-0303 October 2019 Summary of January 8 and 29, 2019 and April 17, 2019, Public Teleconference with NuScale Power, LLC, Regarding Responses to Staff Request for Additional Information (52-048) ML19256B7002019-09-23023 September 2019 Summary of Public Meeting with NuScale to Discuss Test #107 and Test #47 in the Initial Test Program ML19260G5382019-09-23023 September 2019 Summary of 9-4-19 Public Meeting with NuScale to Discuss ITAAC ML19256B4942019-09-18018 September 2019 Summary of Public Meeting with NuScale to Discuss Radiation Shielding ITAAC ML19247C0342019-09-18018 September 2019 Summary of August 26 2019 Public Meeting with NuScale on Chapter 20 ML19252A0212019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting with NuScale to Discuss Test #6, Test #47, and Test #50 in the Initial Test Program ML19255D2722019-09-12012 September 2019 Aug 26, 2019, Summary of Public Teleconference on NuScale Chapter 4 ML19242B8092019-08-30030 August 2019 Discussion Topic for August 13 and August 19, 2019, Public Meeting to Discuss AST Methodology and H2 and O2 Monitoring for the NuScale Design Certification Application ML19242B8802019-08-30030 August 2019 Discussion Topic for July 24, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application ML19242B9932019-08-30030 August 2019 Discussion Topic May 14, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the NuScale Design Certification Application ML19242C0162019-08-30030 August 2019 Discussion Topic May 8, 2019, Public Meeting to Discuss Post-Accident Sampling Exemption Request Associated with the NuScale Design Certification Application ML19242C4792019-08-30030 August 2019 Discussion Topics for the March 12 2019 Public Meeting to Discuss Neutron Absorbers ITAAC and COL Information Item 9.1-8 Associated with the NuScale Design Certification Application ML19228A2502019-08-27027 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19217A3082019-08-15015 August 2019 Summary of Public Meeting with NuScale to Discuss Initial Test Program Test #107 for the Remote Shutdown Workstation ML19212A6882019-08-12012 August 2019 Summary of Public Meeting with NuScale to Discuss Structural ITAAC ML19199A0152019-07-31031 July 2019 Summary of Public Meeting on Various ITAAC Issues ML19149A5052019-07-22022 July 2019 May 22 2019 NRC-NuScale Public Meeting Summary_Reduced Staffing Plan Validation Activities ML19171A1292019-07-17017 July 2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss of Section 3.9.4 Control Rod Drive System of the Design Certification Application ML19134A3632019-07-0808 July 2019 Summary of the April 9, 2019 Public Meeting to Discuss Accident Source Term (AST) Methodology and Post Exemption Associated with the NuScale Design Certification Application ML19176A2502019-07-0808 July 2019 Summary of June 17, 2019 Public Meeting with NuScale on MBDBE ML19178A3502019-06-27027 June 2019 Discussion Topics for April 09, 2019 Public Meeting with NuScale - Public Version ML19242B9342019-06-12012 June 2019 Discussion Topic for June 12, 2019, Public Meeting to Discuss Technical Specifications for the NuScale Design Certification Application ML19151A3382019-06-0505 June 2019 Summary of Public Meeting with NuScale to Discuss ITAAC for the Module Protection System and Safety Display and Indication System ML19087A2402019-05-0606 May 2019 Summary of March 5, 2019 Public Meeting on NuScale EPZ Sizing Methodology TR ML19106A0452019-04-24024 April 2019 Summary of Public Teleconference Held April 15, 2019, Regarding the Inspections, Tests, Analyses, and Acceptance Criteria in NuScale Power Llc'S Design Certification Application ML18340A0132019-04-17017 April 2019 July 24, 2018, Summary of Category 1 Public Teleconference with Nuscale Power, LLC, Design Certification Application Section 3.7, Seismic Design, and 3.8, Design of Category I Structures. ML18348A9442019-04-17017 April 2019 Summary of the Category 1 Public Teleconference with NuScale Power, LLC Design Certification Application Section 3.6.3, Leak-Before-Break Evaluation Procedures, and Section 3.9.4, Control Rod Drive System. ML18333A3612019-04-11011 April 2019 & 08/28/18 Summary of Public Teleconference with Nuscale Power, LLC, Regarding Responses to Staff Requests for Additional Information ML19065A1242019-04-0505 April 2019 Summary of the February 14 and 27, 2019, Public Meeting to Discuss Accident Source Term (AST) Methodology Associated with the Nuscale Design Certification Application ML19085A0412019-03-26026 March 2019 02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application 2024-01-31
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
April 5, 2019 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Getachew Tesfaye, Senior Project Manager /RA/
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF THE FEBRUARY 14, 2019, AND FEBRUARY 27, 2019, CATEGORY 1 PUBLIC TELECONFERENCES TO DISCUSS ACCIDENT SOURCE TERM METHODOLOGY ASSOCIATED WITH THE NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference meeting on February 14, 2019, and February 27, 2019, to discuss the NuScale Power, LLC (NuScale) accident source term methodology associated with its design certification application.
These teleconferences were follow-ups to the June 7, 2018, June 27, 2018, August 9, 2018, August 29, 2018, and December 12, 2018, meetings on the same subject. The meeting attendees were personnel from NuScale and members of the general public.
The public meeting notices dated February 14, 2019, and February 27, 2019, can be found in the NRCs Agencywide Documents Access and Management Systems under Accession Nos.
ML19044A499 and ML19056A434, respectively. These meeting notices were also posted on the NRC public Website.
Enclosed is the Meeting Agenda (Enclosure 1), List of Attendees (Enclosure 2), and a Meeting Overview (Enclosure 3).
Docket No.: 52-048
Enclosures:
As stated cc w/encl.: DC NuScale Power, LLC Listserv CONTACT: Getachew Tesfaye, NRO/DLSE 301-415-8013
ML19065A124 *via email NRO-002 OFFICE DLSE/LB1:PM DLSE/LB1:LA DLSE/RPAC NRR/DE/EENB DSRA/SPRA DLSE/LB1:PM NAME GTesfaye(c) CSmith* MHart
- JCintron-Rivera* JSchaperow
DATE 03/06/2018 04/5/2019 04/05/2019 04/04/2019 04/02/2019 04/05 /2019 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC MEETING TO DISCUSS ACCIDENT SOURCE TERM METHODOLOGY ASSOCIATED WITH THE NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION MEETING AGENDA February 14, 2019, and February 27, 2019 Time Topic 1:00 p.m. - 1:15 p.m. Introductions and Identification of Topics 1:15 p.m. - 2:20 p.m. Discussion of Accident Source Term Methodology 2:20 p.m. - 2:30 p.m. Public Comments/Questions 2:30 p.m. Meeting Adjourn Enclosure 1
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC MEETING TO DISCUSS ACCIDENT SOURCE TERM METHODOLOGY ASSOCIATED WITH THE NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION LIST OF ATTENDEES February 14, 2019, and February 27, 2019 Name Organization Getachew Tesfaye U.S. Nuclear Regulatory Commission (NRC)
Zachary Gran* NRC Ronald LaVera* NRC Michelle Hart NRC Michael Dudek NRC Robert Taylor NRC Michelle Hayes* NRC Anne Marie Grady NRC Olivia Mikula NRC Sheila Ray NRC Tania Martinez Navedo NRC Andy Campbell* NRC Jorge Cintron-Rivera* NRC Jason Schaperow NRC Edward Stutzcage NRC Kevin Coyne* NRC John Parillo* NRC Sam Lee** NRC Dan Barss NRC Kenny Thomas* NRC Mike Melton NuScale Power, LLC (NuScale)
Gary Becker NuScale Peter Subaiya NuScale Robert Gamble NuScale Mark Shaver NuScale Scott Weber NuScale Paul Guinn NuScale Sarah Bristol NuScale Greg Myers NuScale Patrick Conley NuScale Bill Galyean NuScale Marvin Louis Public
- Did not attend the 2-27-2019 meeting. ** Did not attend the 2-14-2019 meeting.
Enclosure 2
U.S. NUCLEAR REGULATORY COMMISSION OVERVIEW OF THE FEBRUARY 14, 2019, AND FEBRUARY 27, 2019, PUBLIC MEETINGS ON ACCIDENT SOURCE TERM METHODOLOGY ASSOCIATED WITH THE NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION The purpose of this meeting was for the U.S. Nuclear Regulatory Commission (NRC) staff to continue the dialogue on NuScale Power, LLCs (NuScale) planned changes to the methodology for accident source term that was previously discussed in public meetings on June 7, 2018 (Agencywide Documents Management and Access System (ADAMS) Accession No. ML18173A260), June 27, 2018 (ML18206A933), August 9, 2009 (ML18240A210), August 29, 2018 (ML18249A261), and December 12, 2018 (ML18351A110).
The specific objective of the February 14, 2019, and February 27, 2019, meetings was to discuss the content of a white paper submitted by NuScale on January 31, 2019, titled Accident Source Terms Regulatory Framework, Revision 1 (ML19032A146). NuScale gave a high-level summary of the white paper and addressed the staffs questions provided in writing as talking points prior to the meeting. The staff noted that the questions were intended to get a better understanding of the methodology and should not be construed as formal review questions of the methodology that can be used in a finding. These discussions were intended to help the staff get a high-level understanding of the NuScales proposed approach. The staff will ultimately determine its technical viability after review and evaluation of Revision 3 of TR-0915-17565, and proposed revisions to the NuScale design certification application, when they are submitted.
NuScale informed the staff that it plans to submit Revision 3 of the TR and conforming FSAR changes for all the affected FSAR chapters, except Chapter 19, by April 17, 2019. NuScale plans to submit conforming Chapter 19 changes by May 23, 2019.
The following are the staffs questions and comments followed by NuScales responses:
A. General (February 14, 2019):
- 1. The staff would like to understand more about the following statement, which is made both on pages 15 and 16 with respect to the core damage source term offsite and control room dose evaluations, respectively: NuScale seeks agreement with NRC staff that a future licensing action could consider reduced conservatism in the CDST offsite [control room]
dose evaluation.
NuScales Response: The DCA application will use more conservative options from the TR. However, future applicants may choose to use less conservative options from the approved TR that are not used in the current DCA. The staff noted that such an approach may unnecessarily slow down the review process and NuScale should consider including in the TR only options that are needed for the DCA application and request approval for the less conservative options in future revisions to the TR.
- 2. The iodine spike source term will be reviewed in more detail when the topical report is submitted, however, please provide more detail regarding the iodine spike source term.
Describe at a high-level, the assumptions made in developing the source term. Does the Enclosure 3
iodine spike source term only consider iodine or is the potential spiking of other radionuclides considered (the consideration of other radionuclides that may spike in a transient may be important for environmental qualification purposes)?
NuScales Response: iodine concentration is estimated using RG 1.183 guidance for a spiking model that assumes that the iodine release rate from the fuel rods to the primary coolant increases to a value 500 times greater than the release rate corresponding to the iodine concentration at the equilibrium value specified in technical specifications. The staff noted that RG 1.183 discusses iodine spiking in the context of potential offsite dose and control room dose and does not include all radionuclide contained within the building that may impact environmental qualification (EQ). The staff suggested that NuScale provide justification why other radionuclides besides iodine that may spike are not considered for EQ purposes.
- 3. Section 7.5 of the white paper appears to indicate that the timespan in which the under-the-bioshield radiation monitors are needed for equipment survivability space is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> because this is the potential period in which core damage is progressing and conditions within the containment are rapidly changing. However, in FSAR, Table 3.11-1, regarding the environmental qualification, the monitors are required to be operational for 100 days. Please provide more information regarding why, for equipment survivability, the monitors are only needed for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the discrepancy with the 100 days for environmental qualification. Wouldnt the monitors potentially be valuable beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if there was a scenario in which the event is progressing differently than expected?
NuScales Response: There is a fundamental difference between environmental qualification and equipment survivability. The 100 days duration is for environmental qualification based on guidance from the Institute of Electrical and Electronics Engineers (IEEE) 297 as endorsed by RG 1.47. NuScale is using the 100 days duration for environmental qualification. For equipment survivability, NuScale indicated that the guidance is very clear that the duration is based on the duration in which the equipment is needed to mitigate a severe accident. It is important to note that the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration NuScale uses for equipment survivability, is time beyond core damage, not from the start of the transient. NuScales research has not identified any transient that is not at a stable end stage within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after core damage.
- 4. In Section 7.4 regarding containment integrity, it indicates that beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the containment integrity will be qualitatively assessed. If needed, is there any qualitative assessment of the under-the-bioshield monitors capability beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />? Please explain.
NuScales Response: Yes, NuScale plans to provide qualitative assessment of the under-the-bioshield monitors capability beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. NuScale expects that the assessment will be based primarily on industry and vendor data for radiation monitors that are in current operating plants. NuScale also emphasized that they have a number of radiation monitors outside the bioshield regions that can detect radionuclide release at all possible release points.
- 5. Where qualitative assessment of equipment survivability is used, provide additional information regarding what the qualitative assessment will entail.
NuScales Response: The qualitative assessments have not yet been finalized. The intent is to use existing vendor and industry data, including doses that similar types of equipment
have been previously tested to and known and expected failure modes that the equipment has. If there is insufficient data, NuScale plans to do additional testing as the bases for survivability. All the specifics are still being finalized and will be included in the revised TR and FSAR changes. In response to the staffs question about the applicability of existing data to NuScales design, NuScale responded that if there is doubt about the applicability of existing data, it will do its own test.
- 6. Any additional information that can be given to provide reasonable assurance that equipment will not unacceptably fail under the equipment survivability analysis will be helpful. For example, are synergistic effects (for example, temperature and radiation considered in the equipment survivability analysis). Are there any processes or procedures that will be used by the licensee to provide some level of assurance that there is not unexpected degradation of the penetration assemblies during operation which could challenge the survivability analysis? What provides assurance that survivability of equipment is maintained if there are any design or analytical changes?
NuScales Response: NuScales plan is to evaluate temperature, pressures and radiation effects independently for equipment survivability unless there is a known synergistic effect.
The staff noted that this approach differs from what was done previously by other applicants and will consider sharing that information to NuScale. Regarding procedures that will be used by the licensee to provide some level of assurance that there is not unexpected degradation of the penetration assemblies during operation, NuScale stated that licensees will follow their normal procedures to ensure containment leakage integrity. Therefore, for equipment survivability analysis, the electrical penetration assemblies (EPAs) will be in the state that is expected when they are relied on for severe accident. If additional measures are needed by future licensees, NuScale will evaluate the need for an additional COL information item as part of their survivability evaluation.
- 7. Please provide additional information regarding why 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is used for the qualitative assessment of containment penetrations since as long as there is a higher pressure in containment than on the outside, if the penetrations were to fail it would result in a release.
NuScales Response: The intent of equipment survivability and containment performance goal is to prevent large early release in the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and unmitigated release after that point. Therefore, the goal of survivability evaluation is not to prevent release in the later stages of an accident. Based on vendor information, the EPAs are not expected to experience catastrophic failure within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Additionally, NuScales research on severe accidents has shown that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after core melt, the radionuclides that have been released would have been substantially deposited on the containment surfaces. Therefore, if there is degradation of the EPAs after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, it will not result in large release.
B. Environmental Qualification (EQ) Specific (February 14, 2019):
- 1. 10 CFR 50.49 states, in part:
The time-dependent temperature and pressure at the location of the electric equipment important to safety must be established for the most severe design basis accident during or following which this equipment is required to remain functional.
10 CFR 50.49 requires the applicant to establish a program for qualifying the electric equipment important to safety located in harsh environment. IEEE Std 323-1974 as endorsed by RG 1.89 describes the methodology accepted by the staff to qualify electrical
equipment important to safety located in a harsh environment. Environmental qualification is an assessment of equipment functionality during and after DBA. Whereas, equipment survivability evaluates equipment functionality during and after a severe accident. In other words, environmental qualification is a well-defined, established process that could be more rigorous than equipment survivability.
Based on the above, please describe the methodology used to assess equipment survivability for the NuScale design. Will equipment survivability be determined by testing, analysis, or testing in combination with analysis. If only analysis is used, please discuss the technical basis for the specific equipment. Discuss for EPAs and post-accident monitoring (PAM).
NuScales Response: We are still developing the equipment survivability evaluation exact approach for different components. We plan to adopt approaches previously used such as in the CE System 80+ survivability evaluation. In response to the staffs question on PRA insight for equipment survivability, NuScale stated that there is currently a discussion in FSAR Section 19.2 about extreme temperatures and pressures for equipment survivability but not for extreme radiological conditions since that was not an issue prior to the planned revision to the accident source term. The planned revision to FSAR Section 19.2 will address PRA insight on equipment survivability for the revised accident radiological source term that is not covered by FSAR Section 3.11 environmental qualification.
- 2. 10 CFR 50.49 requires the equipment to perform under conditions existing during and following design basis accidents. The applicant stated that the survivability evaluation will be performed to demonstrate equipment will survive for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> maximum duration, and analysis thereafter. Additional basis for the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> maximum duration is needed. How will survivability be demonstrated for the specific equipment (i.e., EPA, PAM, and containment isolation valves (CIVs)) and how will the survivability evaluation show equipment function, if the duration of the equipment is greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />?
NuScales Response: This is addressed in Part A above.
- 3. Please provide a list of equipment that will be assessed for equipment survivability. Will there be changes to the EQ list in NuScale FSAR Section 3.11? If the answer is yes, please discuss the changes.
NuScales Response: The list of items that will be assessed for equipment survivability include equipment that support functions that are needed for severe accident mitigation such as containment isolation valves, EPAs, post-accident monitoring, and equipment used to monitor combustible gases. There is no plan to change the EQ list in FSAR Section 3.11.
C. Additional questions discussed on February 27, 2019.
- 1. The staff needs to have a discussion with NuScale to clarify their proposed approach on 10 CFR 50.34(f)(2)(vii) compliance. In particular, the staff asks NuScale to clarify whether they intend the entirety of 10 CFR 50.34(f)(2)(vii) to be assessed using the core melt source term or whether part of 10 CFR 50.34(f)(2)(vii) is being met using the iodine spike source term.
The white paper indicates that control room dose is being addressed with the core melt source term, but it isnt clear regarding other aspects of 10 CFR 50.34(f)(2)(vii), particularly as it relates to equipment protection.
In addition, FSAR Chapter 12, Section 12.2.1.13, Revision 2, indicates that 10 CFR 50.34(f)(2)(vii) is being evaluated to the iodine spike source term. Specifically, FSAR Section 12.2.1.13 references 10 CFR 50.34(f)(2)(vii) and discusses accident source terms and discusses several accident source term tables. NuScale indicated previously in a clarification call this past December that this FSAR Chapter 12 information has been revised to reflect the iodine Spike source term. Therefore, it would appear that the design basis iodine spike source term is being relied on for at least part of 10 CFR 50.34(f)(2)(vii) compliance.
NuScales Response: We realize FSAR Revision 2 is inconsistent with the proposed path forward, and it will be updated in the next revision. NuScales approach to comply with 10 CFR 50.34(f)(2)(vii) is through use of core damage source term. As noted by the staff, NuScale discussed the implication of that in the whitepaper. To meet the regulation, the control room dose is being addressed with the core melt source term. The FSAR will be revised to reflect the exemption request submitted for post-accident sampling. The part of 10 CFR 50.34(f)(2)(vii) requirement for protecting safety equipment from the radiation environment is being addressed with the core melt source term using equipment survivability evaluation.
- 2. TR-0716-50424-P, Revision 0, Combustible Gas Control, and NuScales response to RAI 8862, Question 6.2.5-2, states that the following components are required to mitigate severe accident conditions.
TR Table 3-16 Reflected DDT Load Detonation Performance Treatment Component Treatment Requirement CIVs Remain closed ECCS main valves Remain open ECCS trip and reset valve Preserve containment ASME Service ASME Service Electrical structural Level C Level D penetration integrity Cables and wiring Do not generate debris Environmental Qualification Please confirm that the above table is accurate and complete.
NuScales Response: We have not completed identifying the components that should be on the equipment survivability list to mitigate severe accidents as part of the FSAR Chapter 19 review. The components listed in the combustible gas control TR table is to comply with 10 CFR 50.44(c) for inside containment. The list that will be generated as part of the accident source term methodology TR revision may not have a one-to-one correspondence with the list for combustible gas control.
D. Next steps:
- 1. NuScale submits Revision 3 of the accident source term methodology TR and conforming FSAR changes for all the affected FSAR chapters, except Chapter 19, by April 17, 2019.
- 2. NuScale submits conforming Chapter 19 changes by May 23, 2019.