ML19121A217

From kanterella
Revision as of 02:58, 30 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Meeting for Pilgrim Nuclear Power Station - Meeting Summary
ML19121A217
Person / Time
Site: Pilgrim
Issue date: 04/30/2019
From: Anthony Dimitriadis
NRC/RGN-I/DRP/PB5
To:
Dimitriadis A
References
MN 19-001
Download: ML19121A217 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 April 30, 2019 MEETING

SUMMARY

MN No.19-001 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PILGRIM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC MEETING The U.S. Nuclear Regulatory Commission (NRC) staff met with the public on March 26, 2019, at 6:00 p.m., at Hotel 1620 in Plymouth, MA, to discuss the NRCs assessment of safety performance of the Pilgrim Nuclear Power Station (Pilgrim) during the 2018 calendar year. The NRC presented its assessment of the safety performance of Pilgrim for calendar year 2018, and specifically discussed the basis for transitioning Pilgrim from Column 4 of the NRCs Action Matrix to Column 1 of the NRCs Action Matrix as of March 4, 2019. The staff then conducted a question and answer session.

Additional information on the NRCs Annual Assessment Process and safety performance of Pilgrim can be found on the NRCs website at: https://www.nrc.gov/reactors/operating/

oversight/actionmatrix-summary.html. Further information regarding the additional NRC oversight at Pilgrim due to their Column 4 performance can be found on the NRCs website at:

https://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html Copies of the slides presented by the NRC and a transcript for the evening are included as enclosures to this meeting summary.

Feedback forms submitted by members of the public following the meeting will be evaluated.

The public meeting notice can be found in in ADAMS with Accession Number ML19070A096.

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

________/RA/_____________________

Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects

Enclosures:

1. NRC Slides (ML19119A088)
2. Meeting Transcript (ML19119A072)

ML19121A217 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ZHollcraft ADimitriadis DATE 4/30/19 4/30/19