Responds to NRC 761105 Ltr Re Violations Noted in IE Insp Rept 50-313/76-15.Corrective Actions:Ql Control Group to Provide Surveillance of Contractor Const Procedures to Assure Compliance
ML19309D825
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/01/1976
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19309D822 List:
References
1-116-15, NUDOCS 8004110688
Download: ML19309D825 (3)


Text

__ _

.

.O

.

.

.

~ ~

n (v e

.

z. , .

H E L PIN G OUILO ARKANSAG A AK ANS AS POWE A & LIGHT COMPA NY PO. sox 551 UTTLE AOCK. A AK ANS AS 72203*(5013371-4000 December 1, 1976 1-116-15 Reactor Construction and Operations Branch United States Nuclear Regulatory Commission Office of Inspection ar.d Enforcement Region IV 611 Ryan Drive, Suite 1000 Arlington, Texas 76012 Attention: Mr. G. L. Madsen

Subject:

Arkansas Power S Light Company Arkansas Nuclear One-Unit 1

,

' Docket No. 50-313

-

License No. DPR-51 Inspection Report No. 50-313/76-15 (File: 0232)

Gentlemen:

The subject inspection report identified two violations of 10 CFR50, Appendix B. As applicable, our response includes (1) corrective steps ,

which have been taken and the results achieved; (2) corrective steps which will be taken to as-id further non-compliance; and (3) the date when full compliance will be achieved. The NRC position on the cited violation and the corresponding AP6L response are provided below:

1. NRC Position 10CFR50, Appendix B, Criterion V, req 2 ires in part that " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."

Bechtel procedure WFMC-1 " Welding Filler Material Control Procedure Specification", paragraph 6.5, requires that " Individual welders shall keep their work areas clear of unauthorized and discarded welding

{x filler materials. Damaged electrodes shall be placed in waste bins i

o) and removed from the area."

800413o

/ g; oy

)

\

Contrary to the above requirements, discarded weld filler materia was observed on the floor in the work area where work had been in progress on the installation of the Unit 2 regenerative waste system within the Unit I confines. This is an infractinn.

.

-. - ..

.

-

.

'

'

  • Mr. Madsen December 1, 1976

.f' 'y 1-116-15 t  !.

V ..

AP6L Response The discarded weld filler material which was observed on the floor in the work area where the installation of the Unit 2 regenerative waste system was in progress has been removed from the work area in accor-I dance with Bechtel procedure WFMC-1, " Welding Filler Material Control Procedure Specification".

'

The Bechtel Corporation (Russellville, Arkansas) has been made aware of the above infraction and has been directed to stress adherence to Bechtel procedure NFMC-1 among its personnel.

As control over contractor and constructor performing activities and services in ANO-Unit 1, the Quality Control group will provide surveillance to assure compliance to established procedures. In the case where the installation of a Unit 2 system is physically located within

!

the confines of Unit 1, the Quality Control Engineer or his representa-tive will coordinate with the APSL Quality Assurance group to provide surveillance, in order to assure compliance to established procedures.

,

2. NRC Position

=

hs_,/

\

10CFR50, Appendix B, Criterion V, requires in part that " Activities affecting quality shall be prescribed by documented instructions,

, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."

,

Contrary to the above requirements, the procedure 1004.23 for the control

'

of drawings was not found to be appropriate to the circumstances and

'

did not provide instructions for the control of drawings during the design change and modification process. Drawings associated with DCN *

  1. 436 were found in the file room and the mechanical shop which did not reflect that modifications had been made to the Control Room Ventila-tion System, nor did they note or otherwise indicate that a design change had been approved and completed which modified the system. This is an infraction.

AP5L Response

.

Procedure 1004.23 (Drawing Control) is being revised to provide.instruc-tion for the control of drawings during the design change and modifica-tion process. Those drawings identified have been " flagged" and issued

to shops.

.

Drawing control for the issuance of shop drawings is being investigated :

to assure that correct drawings are located at appropriate work loca-I' tions. In addition, interim measures are being taken to identify l .) drawings which have changes pending, prior to receipt of "as-built" s_ / drawings from APSL Engineering.

.

,.. - . . v.. .- , , - _ . , .

..- . . - . . . . -.. . - . .. . -. . ._.. . -- .....__-. ._.. . .-.. - - - - . . -_ _ _ _

_ - .

.

, .

,

.

'

. .- , '

.

- Mr. Madsen December 1, 1976

-

  • 1-116-15 i

,

. It is anticipated that review of ANO-Unit One drawing control

,

program will be completed April 1, 1977.

{ Very truly yours, i

'

i

/ /

i 4

Donald A. Rueter

Manager, Licensing l l

l DAR:ay

!

l

. u

!

!

! l 1

1

! I i l

-

1 t l i-

,

i

'

i i

6

.

,

r 6

,+e,.y --.-,_ew,...,-_,..wme-...,-,-ev.,.. .m,em,--m,--w,,y-.y,,