Owner'S Activity Report
ML062370350
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/18/2006
From: Gerald Bichof
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
06-648
Download: ML062370350 (7)


Text

VIRGINIA ELECTRIC AND POWER COMPANY V RICHMOND, VIRGINIA 23261 August 18. 2006 U.S. Nuclear Regulatory Commission Serial No.: 06-648 Attention: Document Control Desk NLOS/vlh: RD Washington, D.C. 20555 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT .1 OWNER'S ACTIVITY REPORT As allowed by ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1," the Form OAR-1 for Surry Unit 1 refueling outage SIR20 is enclosed. This document contains reporting requirements for the first period of the fourth ten-year inservice inspection interval for Surry Unit 1 from December 4, 2004, through the duration of the S1 R20 refueling outage completed on May 27, 2006. The first period ends on October 13, 2006.

Should you have any questions regarding this submittal, please contact Mr. Gary Miller at (804) 273-2771.

Very truly yours, Gerald T. Bischo~f Vice President - Nuclear Engineering

Attachment:

1. S1 R20 Owner's Activity Report (Form OAR-i)

Commitments made in this letter: None A-r,,V-

Serial No.06-648 Docket No. 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 Mr. N. P. Garrett NRC Senior Resident Inspector Surry Power Station Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852 Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.06-648 Docket No. 50-280 Attachment Owner's Activity Report (Form OAR-i)

Surry Unit I Refueling Outage S1 R20 First Period of the Fourth Ten-Year ISI Interval Virginia Electric and Power Company (Dominion)

SURRY POWER STATION, SI R20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number. 1-4-1-2 (Unit 114th IntervalIst1'Pprind 2nd RApnrt)

Owner: Virainia Electric and Power Company. 5000 Dominion Boulevard, Glen Allen, VA 23060 Plant: Surrv Power Station. 5570 Hoo Island Rd. Surry. VA 23883 Unit No. I Commercial service date 12/22/72 Refueling outage no. S1 R20 Current inspection interval Ath Current inspection period Edition and Addenda of Section XI applicable to the inspection plan 1998 Edition through 2000 Addendum Date and revision of inspection plan Surry Unit 1 4eh Interval ISI Plan Revision 3, February 2006 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan N/A CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date N/A Signed j151r?-v. or S $Ow5Pners* 4.169. DateT4?

(Owner's or Owner's Desig nee, Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virainia and employed by H.S.B. - CT of Hatford. CT have inspected the items described In this Owner's Activity Report, during the period -124/04 to 5/2706 , and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs. replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable, in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection.

~ ~ 4A ~Commissions VAMII Inspector's Signature National Board, State. Province, and Endorsements Date- C2

Serial No.06-648 Docket No. 50-280 Attachment SURRY POWER STATION SI R20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE I ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) To Examination Required for Credited for Credited (%) For Date for The Category The Interval This Period The Period Interval Remarks B-A 10 0.3 3.0% 3.0% Note 6 B-B 5 1.3 26.0% 26.0%

B-D 30 6 20.0% 20.0%

B-G-1 345 88 25.5% 25.5% Note 1 B-G-2 95 7 7.4% 7.4% Note 1 B-K 28 6.3 22.5% 22.5%

B-L-1 1 0 0% 0% Note 6 B-L-2 1 0 0% 0% Note 1 B-M-2 7 1 14.3% 14.3% Note 1 B-N-1 3 1 33.3% 33.3%

B-N-2 1 0 0% 0% Note 6 B-N-3 1 0 0% 0% Note 6 B-O 3 0 0% 0% Note 6 B-P 7 2 28.6% 28.6% Note 2 B-Q 9 2 22.2% 22.2% Note 3 C-A 7 1.7 24.3% 24.3%

C-B 15 3.3 22.0% 22.0%

C-C 16 4 25.0% 25.0%

C-G 36 0 0% 0% Note 4 C-H 3 0 0% 0% Note 5 D-A 51 12 23.5% 23.5%

D-B 3 0 0% 0% Note 5 F-A 277 71 25.6% 25.6%

R-A 136 48 35.3% 35.3%

Note 1: Many exams presently scheduled are required only ifcomponent is disassembled for maintenance.

Total examinations and percentages required may change according to maintenance activities.

Note 2: The Class 1 leakage test is required to be performed every refueling outage. The numbers and percentages represent the total number of refueling outages planned for the 4th Interval. The reactor coolant system VT-2 exam, 1-PT-11, was performed on May 23, 2006.

Note 3: Total examinations required may change dependent on the S/G Eddy Current Program.

Serial No.06-648 Docket No. 50-280 Attachment Note 4: Total examinations required will be determined by maintenance performed on any C-G pump.

Exams are required only when a pump is disassembled for maintenance.

Note 5: The numbers and percentages represent the total number of periods over the inspection interval. All 1st Period Class 2 and 3 System Pressure Tests are scheduled for completion by the end of the 1st Period, October 13, 2006.

Note 6: Deferral is permissable.

Serial No.06-648 Docket No. 50-280 Attachment SURRY POWER STATION SIR20 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE Flaw or Relevant Condition Found During Scheduled Exam Item Flaw Characterization Section X) Exam or Category Number Item Description (IWA-3300) Test (Yes or No)

F-A F1.30 1-WCMU-H008 Loosened pipe clamp components Yes, Support B-G-2 B7.70 1-SI-147 Thread damage Yes 2 Bolting Notes:

I Scope expanded to cover additional supports; all additional inspections were satisfactory.

2 Damage occurred by wrench during maintenance activity, not a service induced flaw. Evaluated satisfactory as found.

No scope expansion required.