Page 1 of 2 Crystal River 03/04/2011 07:04:23 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site SGRP - SGRP ACTIVITIES 2 3 03/01/2011 04/01/2011 IP 50001 Steam Generator Replacement Inspection TFPI - 805 TFPI 6 3 04/04/2011 04/08/2011 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]
3 04/18/2011 04/22/2011 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]
PSB1-RP - RAD ENVIRONMENTAL MONITORING PROGRAM 1 3 06/13/2011 06/17/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment EB3-HS - HEAT SINK 1 3 06/20/2011 06/24/2011 IP 7111107T Heat Sink Performance OL EXAM - INIITIAL EXAM PREP 5 3 08/22/2011 08/26/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INIITIAL EXAM - WEEK 1 5 3 09/12/2011 09/16/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 3 09/12/2011 09/16/2011 IP 7111402 Alert and Notification System Testing 3 09/12/2011 09/16/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 09/12/2011 09/16/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 09/12/2011 09/16/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 3 09/12/2011 09/16/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 2 4 3 09/19/2011 09/23/2011 V23355 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3 10/31/2011 11/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 10/31/2011 11/04/2011 IP 71124.02 Occupational ALARA Planning and Controls 3 10/31/2011 11/04/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 10/31/2011 11/04/2011 IP 71124.04 Occupational Dose Assessment 3 10/31/2011 11/04/2011 IP 71124.05 Radiation Monitoring Instrumentation 3 10/31/2011 11/04/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK 2 4 3 11/14/2011 11/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/14/2011 11/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 3 11/14/2011 11/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3 11/14/2011 11/18/2011 IP 71124.04 Occupational Dose Assessment 3 11/14/2011 11/18/2011 IP 71124.05 Radiation Monitoring Instrumentation 3 11/14/2011 11/18/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Crystal River 03/04/2011 07:04:23 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 01/17/2012 01/20/2012 IP 71152B Identification and Resolution of Problems 3 01/30/2012 02/03/2012 IP 71152B Identification and Resolution of Problems MOD - MODIFICATION INSPECTION 3 3 04/16/2012 04/20/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3 04/30/2012 05/04/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications ISFSI - ISFSI PAD CONCRETE POUR 2 3 06/18/2012 06/22/2012 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3 06/25/2012 06/29/2012 IP 7111401 Exercise Evaluation 3 06/25/2012 06/29/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 06/25/2012 06/29/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.