MONTHYEARIR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) IR 05000443/20220062023-03-0101 March 2023 Annual Assessment Letter for Seabrook Station (Report 05000443/2022006) IR 05000443/20220052022-08-31031 August 2022 Updated Inspection Plan for Seabrook Station (Report 05000443/2022005) IR 05000443/20210062022-03-0202 March 2022 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2021006) ML21322A2612021-11-18018 November 2021 Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Teams); Inspection Report 05000443/2022011 IR 05000443/20210052021-09-0101 September 2021 Updated Inspection Plan for the Seabrook Station (Report 05000443/2021005) IR 05000443/20200062021-03-0303 March 2021 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2020006) IR 05000443/20210132021-01-20020 January 2021 Information Request to Support Triennial Baseline Design-Basis Capabilities of Power-Operated Valves Inspection; Inspection Reportt 05000443/2021013 IR 05000443/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000443/2020005) IR 05000443/20190062020-03-0303 March 2020 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2019006) IR 05000443/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000443/2019005) ML19141A0552019-05-21021 May 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000443/2019403 IR 05000443/20180062019-03-0404 March 2019 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2018006) IR 05000443/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000443/2018005) IR 05000443/20170062018-02-28028 February 2018 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Reports 05000443/2017006, 05000443/2017402, And05000443/2017501) IR 05000443/20170052017-08-28028 August 2017 Updated Inspection Plan for Seabrook Station, Unit No. 1 (Report 05000443/2017005) IR 05000443/20160062017-03-0101 March 2017 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2016006) IR 05000443/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Seabrook Nuclear Power Plant, Unit No. 1 (Report 05000443/2016005) IR 05000443/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2015006) IR 05000443/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2014001) IR 05000443/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000443/2014006 IR 05000443/20130012014-03-0404 March 2014 ROP-14 2013 Seabrook Station Unit 1 Annual Assessment Letter, Report 05000443/2013001, and Inspection Plan ML13246A1072013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000443/2013006 IR 05000443/20120012013-03-0404 March 2013 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2012001) IR 05000443/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Seabrook Station Unit 1 (Report 05000443/2012006) ML12174A0192012-06-0404 June 2012 Paper - Inspection Planned for Week of 9/26/11 with Modes, Chaudhary, Thomas, Sheikh, and Erickson, USNRC IR 05000443/20110012012-03-0505 March 2012 Annual Assessment Letter for Seabrook Station, Unit 1 (Report No. 05000443-11-001) ML1124113402011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Seabrook Station, Unit 1 IR 05000443/20100012011-03-0404 March 2011 Annual Assessment Letter for Seabrook Station, Unit 1, EOC-11 (Report 05000443-10-001) ML1024403952010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Seabrook Station, Unit 1 ML1006208582010-03-0303 March 2010 EOC Annual Assessment Letter and Report 22 ML0924403172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Seabrook Station, Unit 1 IR 05000443/20090012009-03-0404 March 2009 Annual Assessment Letter - Seabrook Station Unit 1 (05000443/2009001) ML0824700702008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Seabrook, Unit 1 IR 05000443/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Seabrook Station 05000443-08-001) ML0734706872007-12-13013 December 2007 ROP 8 - Seabrook - Change to Inspection Plan, 12/13/07 ML0724309432007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan IR 05000443/20060012006-03-0202 March 2006 Annual Assessment Letter - Seabrook Nuclear Power Station (Report 05000443/2006001) ML0524207202005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Seabrook IR 05000443/20050012005-03-0202 March 2005 Annual Assessment Letter - Seabrook Nuclear Generating Station (Report 05000443/2005001) ML0424402002004-08-30030 August 2004 Seabrook ROP5 Mid-Cycle Performance Review and Inspection Plan ML0406301482004-03-0303 March 2004 Annual Assessment Letter - Seabrook IR 05000443/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Seabrook Station (Report No. 50-443/03-001) IR 05000443/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Seabrook Station (Report No. 50-443/02-001) 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ptember 4, 2012
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2012006)
Dear Mr. Walsh:
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Seabrook during the most recent quarter was within the Regulatory Response column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one low (i.e., white) safety significance Emergency Preparedness cornerstone input described in IR 05000443/2012503, dated April 19, 2012 (ML12151A036)1. This finding involved not identifying an exercise weakness during the post-exercise critique for an April 17, 2012, full-participation emergency exercise. The significance determination for this finding was finalized in our August 7, 2012, letter to you (ML12220A471)1. As stated in that letter, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, when you inform us of your readiness. This inspection is conducted to provide assurance that the root cause and contributing causes of any performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The NRC will also be conducting IP 92702, Follow-up on Traditional
Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS. Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders, which will review actions taken in response to the confirmatory action letter dated May 15, 2012, (ML12125A172)1 which addressed the Alkali-Silica Reaction degradation of certain Seabrook concrete structures and IP 60855.1, Operation of an ISFSI at Operating Plants, which will review operations during the 2013 ISFSI loading campaign. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agency-wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-443 License Nos.: NPF-86 Enclosure: Seabrook Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML12248A087 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME JGreives/LC for LCline/LC ABurritt/LC for DRoberts/DJR DATE 08/27/12 08/27/12 08/27/12 09/04/12
Page 1 of 2 Seabrook 08/31/2012 14:47:30 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 92702 - LR-ASR FOLLOWUP INSPECTION 6 1 07/16/2012 07/20/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - OCC RADIATION SAFETY 1 1 07/16/2012 07/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/16/2012 07/20/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 07/16/2012 07/20/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/16/2012 07/20/2012 IP 71124.04 Occupational Dose Assessment TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 1 08/06/2012 08/10/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - RADWASTE 1 1 08/27/2012 08/31/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TI-188 - TI-188 - SEISMIC WALKDOWNS 2 1 08/29/2012 12/31/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns TI-187 - TI-187 - FLOODING WALKDOWNS 2 1 09/03/2012 12/31/2012 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 7111108P - INSERVICE INSPECTION 1 1 09/17/2012 09/21/2012 IP 7111108P Inservice Inspection Activities - PWR 1 10/01/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR EXM 7/16 - SEABROOK INITIAL EXAM 4 1 06/17/2013 06/22/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM 1 07/15/2013 07/20/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM 71124 - OCC RADIATION SAFETY 1 1 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 60855 - ISFSI LOADING INSPECTION 2 1 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 1 03/01/2013 06/30/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 7111121 - CDBI 9 1 03/25/2013 03/29/2013 IP 7111121 Component Design Bases Inspection 1 04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection 1 04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Seabrook 08/31/2012 14:47:30 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP PROGR - EP PROGRAM INSPECTION 1 1 05/06/2013 05/10/2013 IP 7111402 Alert and Notification System Testing 1 05/06/2013 05/10/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/06/2013 05/10/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/06/2013 05/10/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RADIO EFFLUENTS 1 1 05/20/2013 05/23/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - REMP 1 1 07/22/2013 07/26/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111111B - SEABROOK REQUAL INSP WITH P/F RESULTS 2 1 12/09/2013 12/13/2013 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.