|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000443/20124042012-06-13013 June 2012 IR 05000443-12-404, 07200063-12-401; 4/30/2012 - 5/4/2012; Seabrook Station, Unit 1; Access Control Letter Only IR 05000443/20084022008-05-0505 May 2008 IR 05000443-08-402, on 04/04/2008 - 04/11/2008, Seabrook Station; Physical Protection IR 05000443/20070052008-02-12012 February 2008 IR 05000443-07-005, on 10/01/2007 - 12/31/2007; Seabrook, Unit No. 1, Operability Determinations, Maintenance Risk Assessment and Emergent Work Control IR 05000443/20074022007-08-10010 August 2007 IR 05000443-07-402, on 06/29/2007, Seabrook Station, NRC Physical Security Baseline Inspection Report IR 05000443/20070062007-06-0808 June 2007 IR 05000443-07-006, on 03/19/2007 - 04/26/2007, Seabrook Station, Unit 1, Component Design Bases Inspection IR 05000443/20060042006-10-26026 October 2006 IR 05000443-06-004; 7/1/2006 - 9/30/2006; Seabrook Station, Unit 1; Operability Evaluation IR 05000443/20060152006-08-25025 August 2006 IR 05000443/2006015, Seabrook Station Unit 1; Ti 2515/168 IR 05000443/20060032006-07-25025 July 2006 IR 05000443-06-003; on 04/01/2006 - 06/30/2006; Seabrook Station, Unit 1 ML0504002172005-01-26026 January 2005 Inspection Requests; Seabrook Ssdi - IR 2005-002 IR 05000443/20040032004-12-0202 December 2004 Exercise of Enforcement Discretion Seabrook Station - (NRC Integrated Inspection Report 05000443-04-003) IR 05000443/20020022002-04-19019 April 2002 IR 05000443/2002-002, North Atlantic Energy Service Corporation, Seabrook Station Unit 1, Resident Inspection on 02/17/2002 - 03/30/2002. No Significant Findings Identified IR 05000443/20010142002-03-0707 March 2002 IR 05000443/2001-014, on 12/30/01 - 02/16/02; North Atlantic Energy Service Corporation; Seabrook Station; Unit 1; Resident Inspection Report. No Violations Identified IR 05000443/20010112002-01-16016 January 2002 IR 05000443/2001-011, North Atlantic Energy Service Corporation; Seabrook Station; Unit 1. Event Follow-up on 11/18-12/29, 2001 2012-06-13
[Table view] |
Text
OFFICIAT USE ONIY SEGURITY_REtATED INFORMATION UNITED STATES
"ffi NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE KING OF PRUSSIA, PENNSYLVANIA 19406-2713 1OO June 13,2012 Mr. Paul Freeman Site Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. Michael O'Keefe P.O. Box 300 Seabrook, NH 03874 SUBJECT: SEABROOK STATION, UNIT 1 - NRC BASELINE SECURIry INSPECTION REPORT O5OOO443/2012404 AND INDEPENDENT SPENT FUEL STORAGE SECURITY INSPECTION REPORT 07200063/201 2401
Dear Mr. Freeman:
On May 4,2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Seabrook Station, Unit 1, and Independent Spent Fuel Storage Installation.
The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on May 4,2012, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
One NRC identified finding of very low security significance (i.e., Green as determined by the Baseline Security Significance Determination Process) was identified during this inspection.
The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. This finding was determined to involve a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy.
lf you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the RegionalAdministrator, Region l; the Director, Office of Enforcement, United States Nuclear Regulatory Gommission, Washington, DC 20555-0001; and the NRC Resident lnspector at Seabrook Station, Unit 1.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled.
OFFICIAT USE ONIY _ SEEURIry_REtATED INFERMATIEN
oFFICIAt USE ONtY _ SEEURITY-REtATED INFORMATIEN P. Freeman 2 One cross-cutting aspect was assigned to a finding in the area of Human Performance because the licensee failed to maintain complete and accurate procedures H.2(c). lf you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I and the NRC Resident Inspector at Seabrook Station, Unit 1.
ln accordance with 10 CFR 52.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the materialenclosed herewith contains Security-Related lnformation in accordance with 10 CFR S2.390(dX1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencyruide Document Access and Management System (ADAMS). lf you choose to provide a response and Security-Related lnformation is necessary to provide an acceptable response, please mark your entire response "security-Related lnformation - Withhold from public disclosure under 10 CFR 52.390" in accordance with 10 CFR S2.390(dX1)and follow the instructions for withholding in 10 CFR S2.390(bX1). In accordance with 10 CFR S2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-443,72-063 License No. NPF-86 Nonpublic Enclosure:
I ns pection Report 05000443/201 2404 a nd 07200 063 l 20 1 240 1 w/Attachment: Supplemental lnformation (OUO-SRI)
cc w/encl: wiOUO-SRl:
M. O'Keefe, Licensing Manager J. Giarrusso, Division Chief, MA Emergency Management Agency C. Pope, Director, State of NH Homeland Security cc w/o enclosure: Distribution via ListServ OFFICIAT USE ENIY SEEURIW_REIATEB INFERMATION
ML12165A396(Cover ADAMS ACCESSION NUMBER: M12165A357 (Cover letterw/enclosure)
Cover Letter: JRB E Non-Sensitive El Publicly Available E sut'tst Review E Sensitive E Non-Publicly Available Cover Letter w/ Enclosure: JRB E Non-Sensitive E Publicly Available El suNsl Review El Sensitive E Non-Publicly Available OFFICE RIIDRS RI/DRS RIIDRS RI/DRP RVDRS NAME JBream DEverhart* DCaron' ABurrift* JTrapp DATE 6t4t12 5t30t12 5t31t12 6t8t12 6113112
- See Previous EFFIEIAT USE ENtY SEEURITY_REtATED INFERMATION Distribution w/o OUO-SRI: (via E-Mail)
W. Dean, RA (RI OMMAlL Resource)
D. Lew, DRA (RIORAMAlL Resource)
D. Roberts, DRP (RIDRPMAlL Resource)
J. Clifford, DRP (RlDRPMail Resource)
C. Miller, DRS (Rl DRSMail Resource)
P. Wilson, DRS (RlDRSMail Resource)
A. Burritt, DRP L. Cline, DRP A. Turilin, DRP R. Montgomery, DRP W. Raymond, DRP, SRI M. Jennerich, DRP, Rl @zurz)
J. DeBoer, Acting Rl A. Cass, DRP, Resident AA M. McCoppin, Rl, OEDO RidsNrrPMSeabrook Resource Rids NrrDorlLpll -2 Resou rce ROPreports Resource D. Bearde, DRS Distribution MOUO-SRI: (via E-Mail)
D. Caron, DRS J. Trapp, DRS R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, Rll R. Skokowski, DRS, Rlll M. Hay, DRS, RIV EFFIElAT USE ONtY SEEURITY_REIATED INFERMATION