ML17305A347

From kanterella
Revision as of 10:33, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Reload Analysis Rept Supporting Cycle 3 Operation of Facility.Rept Describes Cycle 3 Core Parameters & Supports Proposed Tech Spec Changes for Operation
ML17305A347
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/24/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305A348 List:
References
NUDOCS 8911060106
Download: ML17305A347 (4)


Text

gg gg~RATZD Dl PXF UTION DEMON STRA, ~N SYSTEM REGULATORY AFORMATION DISTRIBUTION S EM (RIDS)

  • rl e

'"ACCESSION NBR:8911060106 DOC.DATE: 89/10/24 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION CONWAYPW.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) s ~L

SUBJECT:

Forwards reload analysis rept supporting Cycle 3 operation of plant.

DISTRIBUTION TITLE: OR CODE A001D Submittal: General COPIES RECEIVED LTR Distribution L ENCL I SIZE /+/4 D

NOTES:Standardized plant. 05000529 S

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA '1 1 PD5 PD 1 . 1 CHAN,T 5' DAVISPM. 5 5

=%INTERNAL:"ACRS

  • 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 ' NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS1 1 0 EC F Ol 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 h

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 31

0 >

i,~p

,e g

t

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX. ARIZONA 85072<999 WILLIAMF. CONWAY 161-02524-tItFC/RAB/KLHC EXECUTIVEVICE PRESIDENT NUCLEAR October 24, 1989 Docket; No. STN 50-529 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Reload Safety Analysis Report for Unit, 2, Cycle 3 File: 89-056-026 Attached, for your information, is the Reload Analysis Report (RAR) which supports Cycle 3 operation of PVNGS Unit 2. The RAR describes the Cycle 3 core parameters for Unit 2. Additionally, the RAR supports the proposed Technical Specification changes for Unit 2, Cycle 3 operation. The Technical Specification change requests are being submitted separately.

lf you contact Mr.

should have any questions R. A. Bernier at (602) 371-4295.

concerning this information, Sincerely, WFC/RAB/ELMC Attachment CC T. L. Chan (all w/Attachment)

M. J. Davis J. B. Martin T. Z. Polich J

891

~DR iso>

~> Og 8 F OCg OSO fjoof OQSp9 PgQ I t

I

~4 ~

1I