ML17305A347
| ML17305A347 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/24/1989 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17305A348 | List: |
| References | |
| NUDOCS 8911060106 | |
| Download: ML17305A347 (4) | |
Text
gg gg~RATZD DlPXF UTION DEMONSTRA,
~N SYSTEM REGULATORY AFORMATION DISTRIBUTION S EM (RIDS)
- rl e
'"ACCESSION NBR:8911060106 DOC.DATE: 89/10/24 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION CONWAYPW.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) s ~L
SUBJECT:
Forwards reload analysis rept supporting Cycle 3 operation of plant.
DISTRIBUTION CODE A001D COPIES RECEIVED LTR L ENCL I SIZE TITLE: OR Submittal: General Distribution NOTES:Standardized plant.
/+/4 D
05000529 S
RECIPIENT ID CODE/NAME PD5 LA CHAN,T
=%INTERNAL:"ACRS NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC LFMB EC F Ol EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL
'1 1
5' 6
6 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD5 PD DAVISPM.
NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 h
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 33 ENCL 31
0
> i,~p
,e g
t
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX. ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-02524-tItFC/RAB/KLHC October 24, 1989 Docket; No.
STN 50-529 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.
C.
20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Reload Safety Analysis Report for Unit, 2, Cycle 3
File: 89-056-026 Attached, for your information, is the Reload Analysis Report (RAR) which supports Cycle 3
operation of PVNGS Unit 2.
The RAR describes the Cycle 3 core parameters for Unit 2.
Additionally, the RAR supports the proposed Technical Specification changes for Unit 2, Cycle 3 operation.
The Technical Specification change requests are being submitted separately.
lf you should have any questions concerning this information, contact Mr. R. A. Bernier at (602) 371-4295.
Sincerely, WFC/RAB/ELMC Attachment CC T. L. Chan M. J.
Davis J.
B. Martin T. Z. Polich (all w/Attachment)
J 891 iso>
~DR
~>
Og 8 F
OCg OSO OQSp9 PgQ fjoof I t
I
~4 ~
1I