Discusses Review of Des Re Steam Generator Repair. Replacement of Steam Generators Is Normal Operating Procedure.Separate EIS Not Required.Des for New Facilities Should Include Steam Generator Replacement
ML17340A750
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/19/1981
From: Hagan J
ENVIRONMENTAL PROTECTION AGENCY
To: Varga S
Office of Nuclear Reactor Regulation
References
4SA-EIS, NUDOCS 8102250235
Download: ML17340A750 (4)


Text

REGULATORY iIFORMATION DISTRIBUTION SY iM (RIDS)

ACCESSION NBR:8102250235 DOC ~ DATE: 81/02/19 NOTARIZED: NO DOCKET ¹ FACIL:

AUTH INANE 'AUTHOR AFFILIATION Env'ironmental otection N~/

HAGANPJ ~ ED Pr Agency REC IP ~ NAME REC IPIENT AFFILIATION VARGAPS ~ A, Operating Reactors Branch 1

SUBJECT:

Discusses review of DES re steam generator repairs Replacement of steam generators is normal operating procedure<Separate EIS not required,DES for new, facilities should include steam generator replacement.

DISTRIBUTION CODE: COORS COPIES RECEIYED:LTR ENCL SIZEt TITLE: Environ ~ Comments.

NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: BC 17 PM , 05 INTERNAL: ACCIDNT EVAL BR 1 1 EF TREAT SYS BR ENV ENG BR 09 1 1 HYD/GEO BR HYDRO GEO BR 1 ISE 07 NRC PDR 02 1 1 OELD RAD ASSESSMT BR 1 1 FILE 01 SIT ANAL BR 10 1 TI NCE BR EXTERNAL: ACRS LPDR 03 NATL LAB 20 NSIC 04 pze s6 195 TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL

6CD $ //I/

UNITED STATES ENVIRONMENTALPROTECTION AGENCY

>AC pRol~C REGION IV 345 COURTLAND STREET ATLANTA.GEORGIA 30365 M

CD cc-~ebruag~ 19, f981 r.

'-,')SA-EIS, b

~ \

C/)

. Mr. SFgren A.~Varga, Chief Operating Reactors Branch i/1 Division of Licensing Nuclear Regulatory Commission Washington, D. C. 20555

Dear 'Mr. Varga:

We have reviewed the Draft Environmental Impact- Statement(DEIS),relating to steam generator repair at Florida Power and Light's Turkey Point Nuclear Power Plant Units 3 and 4 and do not have any substantive comments to offer.

We believe that the replacement of steam generators is a normal operating procedure in a nuclear facility and as..such, does not require a separate EIS.

In this view we would suggest that future DEIS's addressing new nuclear fa-cilities expand their coverage to include replacement of steam generators.

We have rated the DEIS LO-l, that is, we do not have any significant environ-mental concerns with the project and we do not need any additional information.

Sincerely yours, ohn E. Hagan III Chief, EIS Branch