Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019
ML19008A494
Person / Time
Site: Pilgrim
Issue date: 01/15/2019
From: John Lamb, Bruce Watson
Reactor Decommissioning Branch, Special Projects and Process Branch
To:
Lamb J, NRR/DORL/LSPB, 301-415-3100
References
Download: ML19008A494 (16)


Text

Pilgrim Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting January 15, 2019 Plymouth, Massachusetts Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Office of Nuclear Material Safety and Safeguards Tonights meeting is on the proposed decommissioning activities after Pilgrim permanently ceases operation on June 1, 2019.

NRC will hold a separate public meeting in March on NRCs assessment of Pilgrims operating performance.

Agenda

  • NRC Category III public meeting to obtain comments on the Entergy PSDAR and on the Holtec International license transfer application and supplemental PSDAR
  • Introductions
  • NRC presentations
  • Entergy and Holtec presentations
  • Ground rules
  • Public comments
  • Close the meeting at 9 p.m.

Decommissioning Experience

  • NRCs decommissioning regulations are performance-based and risk-informed
  • Extensive decommissioning experience
  • A total of 10 power reactor sites have completed decommissioning, had the reactor licenses terminated and released for unrestricted use 3

NRC Decommissioning Yankee Rowe, Rowe Massachusetts Post-Decommissioning

Reactor Decommissioning Options

  • DECON: Equipment, structures, etc. are promptly removed or decontaminated to a level that permits radiological release (6 plants in DECON)
  • SAFSTOR: Plant placed in a safe, stable condition and maintained in that condition until it is subsequently decontaminated to a level that permits radiological release (15 plants in SAFSTOR)
  • Radiological Decommissioning must be completed within 60 years of permanent cessation of operations

Thank You

  • Reminders We are here to listen to your comments on the Pilgrim decommissioning The meeting is being transcribed and the transcript will be publicly available A meeting summary will be published and will be publicly available
  • The NRC staff will do our best to answer your questions

Pilgrim PSDAR and License Transfer Application The NRC Review Process January 15, 2019 Plymouth, Massachusetts John G. Lamb, Senior Project Manager Special Projects and Process Branch Office of Nuclear Reactor Regulation

NRCs PSDAR Review Process:

Evaluation Criteria

  • Major radiological decommissioning activities may start after Pilgrim permanently ceases operations, Entergy permanently removes fuel from the Pilgrim reactor vessel, and 90 days after the NRC receives the PSDAR.
  • Decommissioning activities must not endanger the public health and safety or result in significant environmental impacts not previously reviewed.

NRCs PSDAR Review Process:

Environmental Review

  • Provides reasons for concluding that environmental impacts of site-specific decommissioning activities are bounded by previous Environmental Impact Statement (EIS)

- NUREG-0586 (ML023470304), Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities

- Consider site-specific impacts in NUREG-1437, Supplement 29 (ML0719900020) and impacts not addressed in prior EISs

- Inspection program

NRCs PSDAR Review Process

  • Staff will make the PSDAR available for public comment and hold a public meeting
  • Staff will notify the licensee if additional information is required

- Document the NRC review

- Address the comments received

  • If the NRC finds the PSDAR meets the regulation after its review, a letter will be sent to the licensee.
  • The licensee shall notify the NRC in writing and send a copy to the State before performing any decommissioning activity inconsistent with, or making a significant schedule change from, those actions and schedules described in the PSDAR

NRCs License Transfer Application Review Process

  • Consistent with NRC Regulation 10 CFR 50.80, the NRC must determine that the proposed transferee is qualified to be holder of the license
  • Areas that NRC reviews for license transfers:

Financial qualifications Decommissioning funding assurance Foreign ownership, control, or domination Technical qualifications Insurance and indemnity

  • If approved, an order and conforming amendment are issued

NRCs License Transfer Application Review Process

  • License transfer applications are noticed in the Federal Register (www.govinfo.gov/app/collection/fr) and the public can:

- Request a hearing within 20 days of publication of the Federal Register Notice (FRN), and/or

- Provide comments within 30 days of publication of the FRN.

  • The Pilgrim license transfer application contains proprietary information. A redacted, non-proprietary version of the application is available to the public; the FRN will describe the process for requesting access to the proprietary information.
  • The Pilgrim license transfer application was submitted November 16, 2018 (ML18320A031). An FRN regarding the application has not yet been published.

NRCs License Transfer Application Review Process

  • Holtec submitted a proposed revised PSDAR (ML18320A040), dated November 16, 2018.
  • This PSDAR is a supplement to the license transfer application, and therefore, is part of the license transfer application action and not part of the Pilgrim PSDAR action (ML18333A240); however, this public meeting is accepting comments on both actions.
  • The proposed Holtec PSDAR is contingent upon the approval of the license transfer and equity sale closure.

NRCs License Transfer Application Review Process

  • Holtec has also submitted a decommissioning trust fund (DTF) exemption request (ML188320A031) to allow it to use the DTF not only for radiological decommissioning, but also for spent fuel management and site restoration.
  • Holtec requested a regulatory decision on the exemption request at the same time as the decision on the license transfer application.

Comment Periods on the PSDAR and License Transfer Application License Transfer PSDAR and Holtec PSDAR

  • This public meeting
  • This public meeting
  • Federal Rulemaking Web
  • Federal Rulemaking Web site: site:

http://www.regulations.gov http://www.regulations.gov

- Search for Docket ID - Search for Docket ID NRC20180286 NRC20180279

- Due by March 21, 2019 - Publication of FRN and due date TBD

Comments on the PSDAR and License Transfer Application

  • By Mail:

May Ma Office of Administration Mail Stop: TWFN-7-A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001