4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation SlidesML16111A889 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
04/13/2016 |
---|
From: |
NRC/RGN-I/DRP/PB5 |
---|
To: |
|
---|
Burritt A |
References |
---|
Download: ML16111A889 (13) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 HDI ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1009900312010-04-13013 April 2010 Entergy Nuclear Operations (Entergy): Meeting Presentation 2009 Nuclear Safety Culture Assessment Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0809403832008-03-26026 March 2008 Attendance List for Pilgrim Annual Assessment Meeting ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0507500022005-03-16016 March 2005 NRC Slides - Pilgrim Annual Assessment Meeting ML0309001032003-03-26026 March 2003 Annual Assessment Meeting Slides ML0225302662002-09-0909 September 2002 Attachment 2 to Summary of 07/24/2002 Meeting with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station Proposed Safety-Relief Valve Seismic Analysis Methodology ML0210802402002-03-28028 March 2002 Annual Assessment Meeting Slides ML0212004532002-03-28028 March 2002 Entergy Nuclear Generation Company - Pilgrim Nuclear Power Station Annual Assessment Meeting Slides ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-04-11
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 HDI ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17191A7872017-07-13013 July 2017 Regulatory Conference Presentation 07-13-17 ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12262A3282012-09-13013 September 2012 9/13/2012 Pilgrim Watch Final Presentation NUREG-0654 Public Mtg ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1118105122011-06-30030 June 2011 Aam Slides ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0807011352008-03-10010 March 2008 Slides for the Pilgrim Station Annual Assessment Meeting CY2007 - ROP8 - 03/26/2008 ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0710102652007-04-11011 April 2007 Slides for 2006 Annual Assessment Meeting, NRC Annual Performance Assessment of Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0704304762007-01-30030 January 2007 License Renewal Inspection Exit Meeting - Slides with Notes ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0634800262006-12-0606 December 2006 Drop-In Visit (Entergy) Slides ML0609404082006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0632802522005-07-18018 July 2005 Briefing Slides for 07/18/2005, Pilgrim Station Force-on-Force Inspection 2023-04-11
[Table view] |
Text
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
- Discussion of NRC Oversight Results
- Entergy Response and Remarks
Robust NRC Oversight
- Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
- Ongoing NRC oversight to ensure safety margins maintained
- Current regulatory actions are adequate
Pilgrim Performance Problems
- Degraded Cornerstone Column (since 4th Quarter 2013)
- Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
- Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
- White Finding in September 2015 for not identifying and correcting a safety relief valve failure
- White Finding combined with performance within the Degraded Cornerstone for more than five quarters
- Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
- Ensure adequate safety margins maintained
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
- Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
- Additional Resident Inspector was assigned to site
- Quarterly Assessments - increased management oversight
- Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment
Future Action to Monitor Pilgrim
- Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
- Public Electronic Reading Room
- www.nrc.gov/reading-rm.html
- 800-397-4209
Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889
Agenda
- Discussion of NRC Oversight Results
- Entergy Response and Remarks
Robust NRC Oversight
- Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
- Ongoing NRC oversight to ensure safety margins maintained
- Current regulatory actions are adequate
Pilgrim Performance Problems
- Degraded Cornerstone Column (since 4th Quarter 2013)
- Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
- Two White Parallel Findings:
o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters
Pilgrim Performance Problems
- White Finding in September 2015 for not identifying and correcting a safety relief valve failure
- White Finding combined with performance within the Degraded Cornerstone for more than five quarters
- Led to Pilgrim performance transition to Column 4
NRC Oversight Actions Are Comprehensive
- Ensure adequate safety margins maintained
o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines
- Increased Problem Identification and Resolution samples on previously identified performance issues
NRC Oversight Actions Are Comprehensive
- Additional Resident Inspector was assigned to site
- Quarterly Assessments - increased management oversight
- Current regulatory actions are adequate
Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:
report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C
PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment
Future Action to Monitor Pilgrim
- Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Annual Assessment Meeting NRC Closing Remarks
Contacting the NRC
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:
- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html
- Public Electronic Reading Room
- www.nrc.gov/reading-rm.html
- 800-397-4209