4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides
ML16111A889
Person / Time
Site: Pilgrim
Issue date: 04/13/2016
From:
NRC/RGN-I/DRP/PB5
To:
Burritt A
References
Download: ML16111A889 (13)


Text

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Pilgrim Performance Problems

  • Degraded Cornerstone Column (since 4th Quarter 2013)
  • Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications
  • Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o Did not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters

Pilgrim Performance Problems

  • White Finding in September 2015 for not identifying and correcting a safety relief valve failure
  • White Finding combined with performance within the Degraded Cornerstone for more than five quarters
  • Led to Pilgrim performance transition to Column 4

NRC Oversight Actions Are Comprehensive

  • Ensure adequate safety margins maintained

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines

  • Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

Key Inspections & Milestones 3/4: annual 9/01: MC 12/01: assessment 4/13: annual letter/final security 2/11: 4Q15 letters assessment White report issued report issued issued meeting 11/12: 3Q 12/21: FP 2/29: Phase A 4/4-4/8: 5/2-5/20:

report issued triennial issued Phase B Mods Team report issued inspection 4Q2015 January 11-15, 2016 1Q2016 TBD C

PI&R Samples Phase A PI&R Sample IP 92723 COMPLETE COMPLETE Security baseline Report Issue 12/11 Report Issue 2/29 Four SL IV violations Three operations- follow-up Snapshot of (impeding regulatory focused (complete) process) corrective action Adverse weather preps (resident inspectors) program performance April 4-8, 2016 April 2016 May 2-20, 2016 TBD Phase B Public Meeting Mods Team Phase C Six-month review of IP 95003 items not Baseline triennial the corrective action 95003 update modification team already covered in program to determine Annual assessment inspection Phases A and B improvement progress meeting Safety culture assessment

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

- www.nrc.gov/reading-rm.html

  • Public Document Room

- 800-397-4209