ML19065A258
Letter Sequence Request | |
---|---|
EPID:L-2020-LLE-0050, Township of Lacey'S Petition for Leave to Intervene and Hearing Request (Open) | |
Initiation
Administration | |
MONTHYEARML18312A2512018-11-0808 November 2018
[Table View]Township of Lacey'S Petition for Leave to Intervene and Hearing Request Project stage: Request ML18324A6382018-11-16016 November 2018 Comments from the Concerned Citizens for Lacey Coalition Regarding the Oyster Creek Nuclear Generating Station Application for Direct Transfer of License Project stage: Request ML18337A4192018-12-0303 December 2018 Applicants' Joint Answer to Township of Lacey Project stage: Request ML19009A3262019-01-0707 January 2019 Comments from the Concerned Citizens of Lacey Coalition on Oyster Creek Nuclear Plant License Transfer Project stage: Request ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 Project stage: Request ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 Project stage: Request ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 Project stage: Request ML19032A0732019-01-31031 January 2019 Comment (1) from Anonymous on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19046A0172019-02-13013 February 2019 Comment (2) from Anonymous on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19051A0192019-02-20020 February 2019 Watch Petition to Intervene and Hearing Request Project stage: Request ML19051A1142019-02-20020 February 2019 Commonwealth of Massachusetts' Petition for Leave to Intervene and Hearing Request Project stage: Request ML19057A1882019-02-24024 February 2019 Comment (3) of Anonymous Individual on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19057A1902019-02-24024 February 2019 Comment (4) from Anonymous Regarding Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19057A5692019-02-25025 February 2019 Comment from Jim R. Garb on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19060A2282019-02-26026 February 2019 Comment from Henrietta Cosentino on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19059A0232019-02-27027 February 2019 Comment (5) of Rebecca Chin on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19065A1872019-03-0101 March 2019 Comment (7) of Henrietta Cosentino on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19060A2272019-03-0101 March 2019 Comment from the Associated Industries of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19065A1802019-03-0101 March 2019 Comment (6) of David Noyes Supporting Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19070A1612019-03-0101 March 2019 Comments from Chris Riger on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1762019-03-0101 March 2019 Comments from Carolyn Barthel on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1622019-03-0202 March 2019 Comments from David Agnew on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1672019-03-0202 March 2019 Comments from Irene Paine on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1662019-03-0202 March 2019 Comments from Gertrude Carter on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19065A2582019-03-0202 March 2019 Comment from James Sinclair on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19065A2572019-03-0202 March 2019 Comments from William Stewart on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1642019-03-0303 March 2019 Comments from Diana Maher on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1752019-03-0303 March 2019 Comments from Betsy Smith on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1742019-03-0303 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1722019-03-0303 March 2019 Comments from Alex Bally on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1712019-03-0303 March 2019 Comments from Nicola Blake on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1702019-03-0303 March 2019 Comments from Lillia Frantin on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1692019-03-0303 March 2019 Comments from Lesley Phillips on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1682019-03-0303 March 2019 Comments from Joan Holt on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19064B3302019-03-0303 March 2019 Comment from James B. Lampert on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19065A1922019-03-0303 March 2019 Comment (9) of James B. Lampert on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19065A1882019-03-0303 March 2019 Comment (8) of Mary Gatslick on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19065A1982019-03-0404 March 2019 Comment (12) of Brad Ferland on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19070A1772019-03-0404 March 2019 Comments from Catherine Berkey on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19065A1932019-03-0404 March 2019 Comment (10) of J. B. Lampert on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19065A1962019-03-0404 March 2019 Comment (11) of Guy Page on Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment Project stage: Request ML19072A3142019-03-0404 March 2019 Comments from Commonwealth of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19064B3312019-03-0404 March 2019 Comments from the Cape Downwinders and Boston Downwinders on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19064B3322019-03-0404 March 2019 Comment from Pilgrim Watch on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19064B3452019-03-0404 March 2019 Comment from Pine Dubois on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19070A1652019-03-0404 March 2019 Comments Received from Concerned Citizens of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19072A3122019-03-0404 March 2019 Comments from Guy Page on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) Project stage: Request ML19109A1772019-04-17017 April 2019 Response to NRC Request for Additional Information Project stage: Response to RAI ML19114A5192019-04-24024 April 2019 Motion of the Commonwealth of Massachusetts to Supplement Its Petition with New Information Project stage: Request ML19129A4732019-05-0909 May 2019 Watch Motion to Supplement Its Motion to Intervene and Request for Hearing, Biodiversity (05.09.19) Project stage: Request 2019-02-25 |
ML19065A258 | |
Person / Time | |
---|---|
Site: | Pilgrim, HI-STORE |
Issue date: | 03/02/2019 |
From: | Sinclair J - No Known Affiliation |
To: | NRC/SECY |
SECY/RAS | |
References | |
NRC-2018-0279 | |
Download: ML19065A258 (1) | |
Category:E-Mail
MONTHYEARML23240A6902023-08-27027 August 2023
[Table view]LTR-23-0197 Marcia Schneider, E-mail Concerns About Holtec Operating Their Spent Fuel Repository in New Mexico ML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21201A1392021-07-19019 July 2021 Double Eagle Water Supply Email Correspondence ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20183A2942020-07-0101 July 2020 CISF Env - Holtec CISF Tribal Responses to Consultation Request ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19352G6852019-12-18018 December 2019 Holtec - Cisf Env - Background Information for Holtec Cisf EIS ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275F3802019-10-0202 October 2019 Holtec - Cisf Env S-106 - FW: Message from KM_C308 ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19162A3722019-06-11011 June 2019 Holtec - Cisf Env - FW: (External) Holtec Cisf Application EIS Development ML19162A3712019-06-11011 June 2019 Holtec - Cisf Env - Regional Information Inquiry for Proposed Consolidated Interim Storage Facilities 2023-08-27 Category:Legal-Correspondence/Miscellaneous MONTHYEARML23195A0142023-07-13013 July 2023
[Table view]7-13-23 Sierra Club Docketing Statement (DC Cir.)(Case No. 21-1104) ML21004A1552021-01-0404 January 2021 Notice of Withdrawal of Joe Gillespie on Behalf of NRC Staff ML20225A2972020-08-12012 August 2020 Fasken & Pblro Letter of Protest Regarding August 5, 2020 Hearing ML20171A6762020-06-19019 June 2020 Commonwealth of Massachusetts' Notice of Withdrawal of Its Petition for Leave to Intervene and Hearing Request ML20167A3352020-06-15015 June 2020 Joint Status Report ML20156A3162020-06-0404 June 2020 Notice of Appearance of Sidney L. Fowler ML20098F9702020-04-0707 April 2020 Letter from Beyond Nuclear to NRC Commissioners Regarding Holtec Draft Environmental Impact Statement ML20097E0352020-04-0606 April 2020 Notice of Withdrawal of Timothy J. Laughlin on Behalf of Fasken and Pblro ML20063M9722020-02-26026 February 2020 2-26-20 Docketing Statement (DC Cir.)(Case No. 20-1019) ML19296A0192019-10-23023 October 2019 Notice of Appearance for Jeremy L. Wachutka ML19296A0492019-10-23023 October 2019 Notice of Withdrawal for Jennifer Scro ML19239A4102019-08-27027 August 2019 Notification of Issuance of Conforming Amendment ML19235A2972019-08-23023 August 2019 Attachment 1 - License Transfer Cover Letter ML19235A3022019-08-23023 August 2019 Attachment 6 - Exemption ML19235A3012019-08-23023 August 2019 Attachment 5 - Exemption Letter ML19235A3002019-08-23023 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19235A2992019-08-23023 August 2019 Attachment 3 - Draft Conforming Amendment ML19235A2982019-08-23023 August 2019 Attachment 2 - License Transfer Order ML19235A2962019-08-23023 August 2019 NRC Staff Notification Re License Transfer Documents ML19234A3652019-08-22022 August 2019 Attachment 5 - Exemption Cover Letter ML19234A3632019-08-22022 August 2019 Attachment 3 - Draft Conforming Amendment ML19234A3622019-08-22022 August 2019 Attachment 2 - License Transfer Order ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3602019-08-22022 August 2019 NRC Staff Notification Re Issuance of License Transfer ML19234A3662019-08-22022 August 2019 Attachment 6 - Exemption ML19234A3642019-08-22022 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19225D0062019-08-13013 August 2019 NRC Staff Notification Re Nsla ML19225C2422019-08-13013 August 2019 Notice of Appearance for Jennifer Scro ML19154A4822019-06-0303 June 2019 Notice of Appearance for Thomas Steinfeldt on Behalf of NRC Staff ML19120A5002019-04-30030 April 2019 Notice of Appearance for Meghan C. Hammond ML19080A2042019-03-21021 March 2019 Notice of Appearance of Peter D. Lejeune, Alan D. Lovett, and Andrew R. Ryan ML19074A2862019-03-15015 March 2019 Notice of Appearance for Joseph Dorfler ML19074A2892019-03-15015 March 2019 Notice of Appearance for Seth Schofield ML19070A1652019-03-0404 March 2019 Comments Received from Concerned Citizens of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3452019-03-0404 March 2019 Comment from Pine Dubois on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3322019-03-0404 March 2019 Comment from Pilgrim Watch on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3142019-03-0404 March 2019 Comments from Commonwealth of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3132019-03-0404 March 2019 Comments from Brad Ferland on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3122019-03-0404 March 2019 Comments from Guy Page on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3312019-03-0404 March 2019 Comments from the Cape Downwinders and Boston Downwinders on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1732019-03-0404 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1772019-03-0404 March 2019 Comments from Catherine Berkey on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1642019-03-0303 March 2019 Comments from Diana Maher on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1752019-03-0303 March 2019 Comments from Betsy Smith on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1742019-03-0303 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1722019-03-0303 March 2019 Comments from Alex Bally on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1712019-03-0303 March 2019 Comments from Nicola Blake on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1702019-03-0303 March 2019 Comments from Lillia Frantin on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1692019-03-0303 March 2019 Comments from Lesley Phillips on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3302019-03-0303 March 2019 Comment from James B. Lampert on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) 2023-07-13 Category:Rulemaking- Final Rule MONTHYEARML19065A2582019-03-0202 March 2019
[Table view]Comment from James Sinclair on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) 2019-03-02 |
Text
From: A. L. Avery & Son To: Docket, Hearing
Subject:
[External_Sender] FW: Docket ID NRC-2018-0279 Date: Saturday, March 02, 2019 11:25:13 AM To whom it may concern:
I am a former Pilgrim and Entergy employee. Pilgrim has supplied clean power to
Massachusetts and provided thousands of jobs for nearly 50 years. The early closure of
Pilgrim poses many critical challenges not the least of which is returning the site to its
full potential as an economic engine. This is among the reasons why Holtec's proposed
decommissioning plan is so important. Holtec's plan puts Plymouth ahead on an
economic development path by about 50 years, giving the town and the state the
opportunity to reap benefits sooner than under Entergy's SAFSTOR proposal. I support
the proposed sale of Pilgrim to Holtec and urge the NRC to approve this transaction
(Docket ID NRC-2018-0279).
Sincerely, James Sinclair