NRCWebinar DryCaskStorageofNuclearFuel atPilgrimNuclearPowerPlant Dec. 12, 2013

OverviewofPresentation

  • DryCaskStorageandHowItWorks
  • Licensing&CertificationProcess
  • NRCInspection&Oversight
  • PlansforDryCaskStorageatPilgrim
  • Summary

WhytheNeed forDryCask?

Reprocessingofspent fuelnotanoption Nonationalrepository forspentfueltodate Poolsmeantfor temporarystorage encountercapacityissues

HistoricalandProjectedSNFDischarges

0 10 20 30 40 50 60 70 80 Number of ISFSIs Year Specific Licensees General Licensees Total ISFSIs

  • Morethan 1,160loaded drycasks DryCaskStorage

SpentFuelStorageCasks

BWRAssemblyDecayHeatCurve

TheLoading Process Stainlesssteelcask isplacedintopool Techniciansmove spentfuel assembliesintothe cask

TransferofCaskintoOverpack

WeldedCanister-OverpackSystem

VideoofDryCaskStorageProcess http://www.youtube.com/watch?v=mILvWNgggfU

Regulatedunder10CFRPart72 TwoLicensingOptions:

SiteSpecificLicense:

Availabletoanyapplicants Requiredforawayfromreactorsites ApplicationsubmittedtoNRCforapproval OpportunityforHearing GeneralLicense(10CFRPart72,SubpartK):

Addedin1990inresponsetoNuclearWastePolicyActof1982 Availableonlytonuclearreactor(Part50/Part52)licensees RequiresuseofstoragecaskcertifiedbyNRCthroughrulemaking (72.214)

Requiressiteevaluationforcompatibilitywithcaskdesign,subjectto inspection(72.212)

ThisistheoptionthatEntergyispursuingforPilgrim ISFSILicensingOptions

StorageCaskLicensing

&CertificationProcess

  • TechnicalAreas Considered:

Structural Thermal Shielding Criticality Confinement Materials QualityAssurance

  • AccidentsConsidered:

Earthquakes Fires Floods Lightning Tornado-AirFlow Blockage CaskDrops-CaskTip Over

FloodingEvaluationforDryCaskStorage Casksmustbedesignedtowithstandsevereflooding

NRCInspection&Oversight

  • Vendordesignandfabricationprogramsinspected every3yearsbyheadquartersinspectors
  • InitialISFSIoperationsprogram inspectedbyheadquartersand regionalinspectorsduringpad constructionthroughfirstcaskloading
  • ISFSIoperationsprograminspectedevery2yearsby regionalinspectors
  • ResidentInspectorsperformdaytodayoversightof plantoperations
  • GeneralLicense(10CFRPart50&72)
  • 18thISFSIinRegionI
  • PlantModifications&Construction inFall2013Spring2014
  • CaskLoadinginSummer/Fall2014
  • InitialCampaign 3Casks PilgrimDryCaskStoragePlans

Summary

  • Sincethelate1980s,plantownershaveeffectively demonstratedthattheycansafelyloadspentfuelinto drycaskstoragesystemsandtransferloadedcasksto ISFSIs
  • PilgrimplanstoconstructandoperateanISFSIin accordancewiththeNRCsGeneralLicense requirements
  • NRChasextensiveexperienceintheregulationand oversightofISFSIsandplanstoperformongoingand comprehensiveinspectionactivitiesatPilgrim

Questions Questionsmay alsoemailedto opa1@nrc.gov