ML18352A357

From kanterella
Revision as of 16:45, 12 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

11/08/18 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes
ML18352A357
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/2019
From: Martha Barillas
Plant Licensing Branch II
To:
Duke Energy Progress
Barillas M DORL/LPL2-2 301-415-2760
References
EPID L-2018-LRM-0073
Download: ML18352A357 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 8, 2019 LICENSEE:

Duke Energy Progress, LLC FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF NOVEMBER 8, 2018, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, REGARDING EMERGENCY PLAN CHANGES (EPID L-2018-LRM-0073)

On November 8, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (the licensee), at NRC Headquarters, Three White Flint North, 11601 Landsdown Street, North Bethesda, Maryland.

The purpose of the meeting was to discuss the proposed license amendment request regarding emergency plan changes for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris).

Specifically, proposed changes related to the Technical Support Center {TSC) and to the Emergency Notification System were presented.

The meeting notice and agenda, dated October 29, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 18302A024.

A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML 18333A 182). The licensee discussed the reason for the proposed change of the TSC description in the emergency plan is to correct a non-conformance with the TSC documentation.

The licensee stated that Harris continues to meet the guidance provided in NUREG-0696, "Functional Criteria for Emergency Response Facilities," (ADAMS Accession No. ML051390358) and the North Carolina State's building code requirements.

The licensee also discussed the proposed changes to its Alert and Notification System. Although Harris currently credits sirens and tone alert radios as primary ways to communicate in an emergency, Harris plans to only credit the sirens as a primary means of communication in the future. Harris is currently seeking approval from the Federal Emergency Management Agency (FEMA), the State of North Carolina, and the affected counties regarding its Alert and Notification Systems change. Once these approvals are obtained, the LAR will be submitted to NRC for review. The NRC staff will provide an estimate of the review schedule after completing an acceptance review of the licensee's submittal. No regulatory decisions or commitments were made at the meeting. No members of the public were in attendance and no comments were provided.

Please direct any inquiries to me at 301-415-2760 or Martha.Barillas@nrc.gov.

Docket No. 50-400

Enclosure:

List of Attendees cc: Listserv Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATIENDEES NOVEMBER 8 1 2018, MEETING WITH DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 PROPOSED LICENSE AMENDMENT REQUEST REGARDING EMERGENCY PLAN CHANGES U.S. Nuclear Regulatory Commission Martha Barillas Michael Norris Raymond Hoffman Kara McCullough*

Duke Energy Progress, LLC Sarah McDaniel*

Jamey Sharlow* David Thompson*

Chuck Varley* Jeff Robertson*

Bentley Jones*

  • Participated by phone Enclosure

SUBJECT:

SUMMARY

OF NOVEMBER 8, 2018, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, REGARDING EMERGENCY PLAN CHANGES (L-2018-LRM-0073)

DATED JANUARY 8, 2019 DISTRIBUTION:

Public PM File Copy RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrLABClayton Resource RidsNrrPMShearonHarris Resource RidsNrrDorlLpl2-2 Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNsirDpr Resource RHoffman, NSIR JAnderson, NSIR MNorris, NSIR KMcCullough, NSIR LBurkhart, OEDO JJohnston, NRR JBowen, OEDO ADAMS Accession No.: ML 18352A357 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME MBarillas BClayton DATE 12/27/18 12/27/18 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME UShoop MBarillas DATE 01/07/19 01/08/19 OFFICIAL RECORD COPY *via email NSI R/DPR/RLB*

JAnderson (MNorris for) 12/26/18