ML18068A492

From kanterella
Revision as of 19:43, 13 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr
ML18068A492
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1998
From: HANDLOVITS S M, HAWN R S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811100334
Download: ML18068A492 (5)


Text

(

  • A CMS Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 November 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of October 1998. If you'have any questions or concerns, please contact me at (616) 764-3179.

Sincerely, R. S. Hawn Reactor Engineering Supervisor CC: AMDavis, Palisades GABaustian, Palisades Senior Resident Inspector, _Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RDWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA SMMclntyre, P26-204 Region Ill Administrator, USNRC Pal. Eng. Records Center, 950*22*35*1 O/L Cycle 14 Reports (SMH 98*11) ......_ __ -----. G 9811100334

-, ADOCK 05000255

  • R PDR :" . ', -*. ----------------1;,

, .. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 11/03/98 ' COMPLETED BY SMHandlovits MONTH October TELEPHONE (616)764-3262 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 777 17. 777 2. 781 18. 783 3. 783 19. 786 4. 784 20. 786 5. 779 21. 787 6. 773 22. 791 7. 780 23. 786 8. 782 24. 786 9. 784 25. 785 10. 783 26. 784 11. 781 27. 781 12. 781 28. 782 13. 781 29. 784 14. 783 30. 784 15. 787 31. 784 16. 782 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR OCTOBER 1998 The Plant began the month of October at 99.9% power and operated at nominal full power for the entire month.

REPORT MONTH __ _,,O""C'"'"T"'O"'B,,.ER.,_,_19"'9"'8'----

No. Date NONE 1. F: Forced S: Scheduled Type 1 2. Reason: Duration (Hours) Reason 2 A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor 3. Method: 1-Manual 2-Manual Scram 3-Au1omatic Scram Licensee Event Report# 4. System Code 4 Component Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File 5. Cause & Corrective Action to Prevent Recurrence Exhibit I -Same Source 4-0ther (Explain) (NUREG-0161)

DOCKET NO 50-255 UNIT Palisades DA TE 11 /03/98 COMPLETED BY SMHandlovits TELEPHONE 616-764-3262 OPERATING STATUS: 1. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) OPERATING DATA REP.ORT Palisades 981001-981031 2530 811. 7 805 770 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 730 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7 AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): 10 REASONS FOR RESTRICTIONS, IF ANY: 11 HOURS IN REPORTING PERIOD 12 NUMBER OF HOURS REACTOR WAS CRITICAL 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 18 NET ELECTRICAL ENERGY GENERATED (MWH) 19 UNIT SERVICE FACTOR 20 UNIT AVAILABILITY FACTOR 21 UNIT CAPACITY FACTOR (USING MDC NET) 22 UNIT CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE This Month 745.0 745.0 745.0 1879383.0 612419 583190 100.0% 100.0% 107.2% 97.2% 0.0% 24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): 25 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Yr-to-Date 7296.0 6284.0 6114. 5 14935388.6 4818881 4579111 83.8%

83.8% 86.0% 78.0% 2.6% Forecast INITIAL* CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985) DOCKET NO 50-255 DATE 11-2-98 COMPLETED BY SMHandlovi ts TELEPHONE (616)764-3262 NOTES: Cumulative 235527.0 142253.5 137055.7 305616192.

8 96990015 91650327 58.2% 58.2% 56. 7%

  • 48.3% 26.1% Achieved