ML17298B638

From kanterella
Revision as of 12:48, 15 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Draft Proposed FSAR Changes Revising List of Drawings Incorporated in FSAR & Revising Chapter 16 Re Tech Specs.Changes Will Be Incorporated in FSAR Amend 14 Scheduled for Feb 1985 Submittal
ML17298B638
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/10/1984
From: VAN BRUNT E E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: KNIGHTON G W
Office of Nuclear Reactor Regulation
References
ANPP-31401-EEVB, NUDOCS 8412130400
Download: ML17298B638 (17)


Text

REGULATORY INFORMATION DISTRIBUTION SY EM (RIDS)ACCESSION NBR+841 FACIL:STN 50-528 STN 50 5?9 STN"50 530 AUTH INANE VAN BRUNTeE~ED RECIP~NAME KNIGHTONtG AN~?130400 DOC~DATE e 84/12/10 NOTARIZED:

YES Palo Verde Nuclear Station~Unit 1~Arizona Publi Palo Verde Nuclear Statiani Unit 2i Arizona Publi Palo Verde Nuclear Stations Unit 3~Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co~RECIPIENT AFFILIATION Licensing Branch 3 DOCKET 05000528 05000529 05000530

SUBJECT:

Forwards draft proposed,FSAR changes revising list of drawings incorporated in FSAR 8 revising Chapter 16 re Tech Specs'hanges will be incorporated in FSAR Amend 14 scheduled for Feb 1985 submittal'ISTRIBUTION CODE: B001D COPIES RECEIVED:LTR ENCL SIZE: 'I TITLE: Licensing Submittal:

PSAR/FSAR Amdts L Related Correspondence NOTES:Standardized plant.Standardized plant.Standardized plant~05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 IE/DQAS IP/QAB21.NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR/DSI/RAB 22'4/MIB EXTERNAL: BNL(AMDTS ONLY)FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL>0 1 0 6 6 1 0 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 0 1 1 1-1 1 1 1-'1 1 1 0 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAg E 01 ADM/LFMB IE FILE IE/DEPER/IRB 35 NRR'OEgM~L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DSI/RSB 23 RGN5"'MB/DSS (AMDTS)LPDR 03 NSIC 05 PNL GRUELzR COPIES LTTR ENCL 1 0 1 1 1 0 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 1 1 1 1 1 1 1"TOTAL NUMBER OF COPIES REQUIRED: LTTR 54 ENCL 46 M r II v M c I~, IF 1VF lh"VM 1~t F M V f$,~f f Il'il ll frf r'I.I M I~h M Mir">r fl ,1~f,~O,M Fl'r fr h h FI h h', IL M

~~~~Arizona Public Service Company ANPP-31401-EEVB/WFQ December 10, 1984 Director of Nuclear Reactor Regulation Mr.George W.Knighton, Chief Licensing Branch No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 PVNGS FSAR Update-Editorial Changes File: 84-056-026 G.1.01.10

Dear Mr.Knighton:

Enclosed are draft proposed FSAR changes that revise the list of drawings incorporated in the FSAR and that revise Chapter 16 to refer to the PVNGS Technical Specifications.

These changes are expected to be incorporated in FSAR Amendment 14 to the FSAR which is scheduled for submittal in February 1985.Please contact William Quinn of my staff if you have any questions.

Very truly yours, E 4a~r,~~.E.E.Van Brunt, Jr.APS Vice President Nuclear Production ANPP Project Director EEVB/WFQ/mb 412130400 841210 PDR ADOCK 05000528 PDR kr$

ANPP-31401 STATE OF ARIZONA))sse COUNTY OF MARICOPA)I, Hdvin E.Van Brunt, Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company vith full authority to do so, that I have read such document and knov its contents, and that to the best of my knovledge and belief, the statements made therein are true.Edwin E.Van Brunt, Jr.Store to before ee thie~Dday of 1984.e I (Hy Commiss'Ion, Exp<<f(:~gg M Commission Expires Aprl Notary Public I 4 1~p , wi l

~'r;G.W.Knighton PVNGS FSAR-Update-Editorial Changes ANPP-31401 Page 2 cc: A.C.Gehr (w/a)R.P.Zimmerman (w/a)E.A.Licitra (w/a) t 0~e l 1 I PVNGS F SAR CONTENTS (cont)1.6 MATERIAL INCORPORATED BY REFERENCE 1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.7.1 ELECTRICAL, INSTRUMENTATION, AND-EMCTRXCA~

DRAWINGS Cuw~Re LP 1.7.2 PIPING AND INSTRUMENTATION DIAGRAMS 1.7.3 OTHER DETAILED INFORMATION

1.8 CONFORMANCE

TO NRC REGULATORY GUIDES 1.9 STANDARD DESIGNS 1.

9.1 REFERENCES

TO CESSAR 1.9.2 EXCEPTIONS TO CESSAR APPENDIX lA RESPONSES TO NRC RE UESTS FOR INFORMATION 2.SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY 2.1.1 SITE LOCATION AND DESCRIPTION 2.1.2 EXCLUSION AREA AUTHORITY AND CONTROL 2.1.3 POPULATION DISTRIBUTION 2.

1.4 REFERENCES

2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND Parcae 1.6-1 1~7 1 l.7-1 1~7 1 1 0 7 1 1.8-1 1.9-1 1.9-1 1.9-4 2.1-1 2.1-1 2.1-1 2.1-5 2~1 7 2~1 1 7 2.2.1 2.2.2 2.2.3 2.2.4 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.4 2.4.1 MILITARY FACILITIES LOCATIONS AND ROUTES DESCRIPTIONS EUALUATION OF POTENTIAL ACCIDENTS REFERENCES METEOROLOGY REGIONAL CLIMATOLOGY LOCAL METEOROLOGY ONSITE METEOROLOGICAL MEASUREMENT PROGRAMS SHORT TERM (ACCIDENT)

DIFFUSION ESTIMATES LONG TERM DIFFUSION ESTIMATES REFERENCES HYDROLOGIC ENGINEERING HYDROLOGIC DESCRIPTION 2 A 2 1 2~2 1 2.2-5 2.2-17 2.2-29 2.3-1 2~3 1 2.3>>16 2.3-52 2.3-59 2.3-65 2%371 2.4-1 2.4-1

~~~'VNGS FSAR DRAWINGS AND OTHER DETAILED INFORMATION Table 1.7-1 NON-PROPRIETARY EIEcC DRAWINGS INCORPORATED BY REFERENCE (Sheet 55 of 70)Drawing Number Rev.No.Dat,e Title Section Reference 13-E-WCB-0 0 9 4 16NO82 E/D Chilled Water System Norm.Chilled Water Rtn Cont.Isolation Valve J-WCB-UV-61 Chapter 8 13-E-WCB-0 10.3 24NO82 E/D Chilled Water Syst.em Normal Chilled Water Rtn and Supply Ctmt Isolation Valves J-WCA-UV-62 and 63 Chapter 8 13-E-MAA-001 13-E-MAA-002 13-E-NNA-001 bVsE~i 8 13-E-NNA-002 t 3-E'-pÃ4-oo3, 13-E-NNA-004 13-E-PBA-0 01 13-E-PBA-002 5 30AP82 7 24SE82 5 06AP82 06AP82 06 TA'63 07AU82 02DE82 08DE82 Main S/L Diagram Unit S/L Diagram S/L Diagram 120V AC Non-Class IE Ungrounded Instru-.ment and Control Panel E-NNN-D11 S/L Diagram 120V AC Non-Class IE Ungrounded Instru-ment and Control Panel E-NNN-D12 Single Line Diagram 120V AC Non-Class IE Grounded Instrument and Control Panel E-NNN-D16 S/L Diagram, 4.16KV Class IEPower System Switchgear E-PBA-S 03 S/L Disgram, 4.16KV Class IE Power System Switchgear E-PBB-S04 Chapter 8 Chapter 8.Chapter 8 Cha te 8 Cg~pfcg F Chapter 8 Chapter 8 Chapter 8 Amendment ll 1.7-56 April 1983 lE-E-h!f3/-al 1 t3-E-AIHA-ozo IO oz.I=5 gg Osmygg 05 mf pg 6/L Di~~r<m s'8o V 4~-et=sr I>ro~~Syz4e,~/N C C E-N Hhl-ml S/L Di~gra~V8<V No~-<ass (E Power S>4~~mc.c'-hlH~'yy~no S/L 0,'c,g r c, n V8o V Ala~-C(ss lE Pone,r~ys4em/HC C-E-nJ/-le-w>7g D;~pre,~+~>Il Al~~-Cl~~g IE pp~q,~Y>Q~~C.c F-n/He'-nn>

z

PVNGS FSAR DRAWINGS AND OTHER DETAILED INFORMATION Table 1.7-1 NON-PRO PRIETARY EI S(C DRAWINGS INCORPORATED BY REFERENCE (Sheet 56 of 70)Drawing Number Rev.No.Date Title Section Reference 13-E-PEA-0 0 1 1 30SE82 S/L Class IE Standby Generator System Diesel Generator-PEA-G01 and E-PEB-GO 2 Chapter 8 13-E-PGA-0 01 05MR82 S/L 480V Class IE Power System LC E-PGA-L31 Chapter 8 13-E-PGA-0 0 2 13-E-PGA-0 03 13-E-PGA-004 02DE82 01AP82 I 05MR82 S/L 480V Class IE Power System LC E-PGB-L3 2 S/L Class IE 480V Power System LC E-PGA-L33 S/L Class IE 480V Power System LC E-PGB-L34 Chapter 8 Chapter 8 Chapter 8 13-E-PGA-005 13-E-PGA-006 13-E-PHA-0 0 1 24N082 3 24SE82 7 03DE81 SLD 480V Class IE Power System Load Center E-PGA-L35 SLD 480V Class IE Power System LC E-PGB-L36 S/L Diagram 480V Class IE Power System MCC E-PHA-M3 1 Chapter 8 Chapter 8 Chapter 8 13-E-PHA-002 13-E-PHA-003 7 14DE82 08DE82 S/L 480V Class IE Power System MCC E-PHB-M3 2 S/L Diagram 480V Class IE Power System MCC E-PHA-M33-Chapter 8 Chapter 8 April 1983 1.7-57 Amendment 11 s PVNGS FSAR 16.PVNGS TECHNICAL SPECIFICATIONS e PVNGS Technical Specifications.define plant variables, op ating conditions, surveillance requirements, and admini-stra've controls that are considered necessary for.the health and sa ety of the public.The PVNGS Technical Specifications have been prepared in accordance

'th the guidance of NUREG-0212, Standard Technical Specifications.

for Combustion Engineering Pressurized Water Reactors, dated 75arch 15, 1977, as supplemented by Sample Fire Protection Technical Specifications, dated November 1S, 1977.The format of the PVNQS Technical Specifications addresses the categories required by OCFRSO and Regulatory Guide 1.70,', Revision 3, except that information required only in the PSAR i is not presented.

This forraat consists of six sections covering the areas of: I i//Definitions Safety Limits and Limiting Safety Limiting Conditions for Operation Surveillance Requirements Design Features~Administrative Controls System Settings I.The Limiting Conditions for Operation and Surveillance Require-~ments, sections 3 and 4, are presented in a combined format with each Limiting Conditions for Operation (LCO)appearing at the top of the page followed immediately by the appliable Surveillance Requirements (SR).The combined section 16..3/4 is further subdivided into 10 subsections covering the areas of: 16.3/4.1 Reactivity Control Systems 16.3/4.2 Power Distribution Limits

  • Re,~prop<'a6 PVhl<<CCnld lz 4, or g Facy'lip C3per~py h~~~v'