Responds to 851219 Ltr Re Violations & Deviation Noted in Insp Rept 50-528/85-31 on 851028-1108.Corrective Actions: Outage Maint Personnel Retrained to Rev 3 to 73AC-9ZZ05 & Procedures IP-4.12,IP-4.14 & IP-5.15 Changed
ML17299A979
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/17/1986
From: VAN BRUNT E E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: KIRSCH D F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34681-EEVB, NUDOCS 8602040277
Download: ML17299A979 (4)


See also: IR 05000528/1985031

Text

8~020P0277

86000i0528t

pDR I5IDOCK 0500pDR 9 Arizona Nuclear Power Project P.O.BOX 52034 4 PHOENIX, ARIZONA 85072-2034

J8 P I Qf t J~January 17, 1986 ANPP-34681-HF98/~ggg8.05

U.S.Nuclear Regulatory

Commission

Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Attention:

Mr.D.F.Kirsch, Deputy Director Division of Reactor Safety and Projects Subject: Palo Verde Nuclear Generating

Station (PVNGS)Unit 1 Docket No.STN 50-528 (License NPF&1)Response to Notice of Violations:

50-528/85-31-09, 50-528/85-31-06;

and Response to Notice of Deviation:

50-528/85-31-04.

File: 86&7026 D.4.33.2 Re f erence: NRC Inspection

Report 50-528/85-31, letter f rom D.F.Kirsch to E.E.Van Brunt, dated 12/19/85 Dear Sir: This letter is provided in response to the inspection

conducted by Mr.S.Richards and other members of the NRC staff on October 28 through November 8, 1985 of activities

authorized

by NRC, License No.NPF&1.Based on the results of the inspection, two violations

of NRC requirements (administration

of temporary modifications)

and one deviation (design verification)

were identified.

The two violations

were discussed in Items A and B in Appendix A of the referenced

letter.The deviation was discussed in Appendix B of the referenced

letter.The Arizona Nuclear Power Project (ANPP)responses to these items are submitted herewith in Attachments

A and B to this letter.With respect to the general areas of perceived weakness identified

by the NRC in the referenced

Inspection

Report, ANPP will address these areas and include its responses to these areas along with the transmittal

of the final response to Item B which is discussed in Attachment

A to this letter.

t U J~~iy 4 Pl 11

Mr.D.F.Kirsch PVNGS Unit 1 Notice of Violations

and Deviation 50-528/85-31&9, 50-528/85-31-06

and 50-528/85-31-04

Page 2 ANPP-34681 Should there be any further concerns, ANPP will be pleased to discuss them with you.EEVB/TAP/dim

Attachments

Very truly yours, EQ/~8~~v Jnpg E.E.Van Brunt, Jr.Executive Vice President Project Director cc: A.C.Gehr R.P.Zimmerman E.A LLcitra L.F.Miller

a~v