8~020P0277 86000i0528t pDR I5IDOCK 0500pDR 9
Arizona Nuclear Power Project P.O. BOX 52034 4
PHOENIX, ARIZONA85072-2034 J8 P I Qf t J
~
January 17, 1986 ANPP-34681-HF98/~ggg8.05 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Deputy Director Division of Reactor Safety and Projects
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No.
STN 50-528 (License NPF&1)
Response
50-528/85-31-09, 50-528/85-31-06; and Response to Notice of Deviation:
50-528/85-31-04.
File:
86&7026 D.4.33.2
Reference:
NRC Inspection Report 50-528/85-31, letter from D.
F.
Kirsch to E. E. Van Brunt, dated 12/19/85
Dear Sir:
This letter is provided in response to the inspection conducted by Mr. S. Richards and other members of the NRC staff on October 28 through November 8,
1985 of activities authorized by NRC, License No.
NPF&1.
Based on the results of the inspection, two violations of NRC requirements (administration of temporary modifications) and one deviation (design verification) were identified.
The two violations were discussed in Items A
and B in Appendix A of the referenced letter.
The deviation was discussed in Appendix B of the referenced letter.
The Arizona Nuclear Power Project (ANPP) responses to these items are submitted herewith in Attachments A and B to this letter.
With respect to the general areas of perceived weakness identified by the NRC in the referenced Inspection Report, ANPP will address these areas and include its responses to these areas along with the transmittal of the final response to Item B which is discussed in Attachment A to this letter.
t U
J
~
~
iy 4
Pl 11
Mr. D. F. Kirsch PVNGS Unit 1 Notice of Violations and Deviation 50-528/85-31&9, 50-528/85-31-06 and 50-528/85-31-04 Page 2
ANPP-34681 Should there be any further concerns, ANPP will be pleased to discuss them with you.
EEVB/TAP/dim Attachments Very truly yours, EQ/~8~~v Jnpg E. E.
Van Brunt, Jr.
Executive Vice President Project Director cc: