Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005)
ML17233A013
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/28/2017
From: Bower F L
Reactor Projects Branch 3
To: Sena P P
Public Service Enterprise Group
References
IR 2017005
Download: ML17233A013 (5)


Text

August 28, 2017

Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000354/2017005)

Dear Mr. Sena:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Hope Creek Generating Station Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders," as described in Inspection Report 05000354/2017010 (ADAMS Accession No.: ML17122A2821). Also, as previously noted in the annual assessment letter dated March 1, 2017 (Report 05000354/2016006; ADAMS Accession No.: ML17058A408), in addition to baseline inspections, the NRC conducted a supplemental inspection in accordance with IP 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs," onsite between August 7 and 11, 2017. The results of that inspection and a follow-up assessment letter are expected to be issued within 45 days of the completion of that onsite inspection. The NRC will also be performing Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket No. 50-354 License No. NPF-57

Enclosure:

Hope Creek Inspection Plan cc: Distribution via ListServ

ML17233A013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHope CreekInspection / Activity Plan08/29/2017-06/30/2019Page 1 of 208/29/2017 09:29:392/12EXAM-HOPE CREEK INITIAL OL EXAM51 FY18 HOPE CREEK EXAM (FEBRUARY 2018)U0195801/08/201801/12/20181 FY18 HOPE CREEK EXAM (FEBRUARY 2018)U0195802/12/201802/23/201871124-RAD PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/18/201709/22/20171 IPOccupational ALARA Planning and Controls71124.0209/18/201709/22/20171 IPOccupational Exposure Control Effectiveness71151-OR0109/18/201709/22/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0109/18/201709/22/2017T1-191-FUKUSHIMA LESSONS-LEARNED41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19109/18/201709/22/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/16/201710/20/201771124-BASELINE HP11 IPRadiological Hazard Assessment and Exposure Controls71124.0101/22/201801/26/20181 IPOccupational ALARA Planning and Controls71124.0201/22/201801/26/20181 IPOccupational Dose Assessment71124.0401/22/201801/26/2018U1 ISI-UNIT 1 INSERVICE INSPECTION21 IPInservice Inspection Activities - BWR7111108G04/23/201804/27/201871124-BASELINE HP11 IPRadiological Hazard Assessment and Exposure Controls71124.0104/30/201805/04/20181 IPOccupational ALARA Planning and Controls71124.0204/30/201805/04/20181 IPOccupational Dose Assessment71124.0404/30/201805/04/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)61 IPDesign Bases Assurance Inspection (Teams)7111121M06/04/201806/08/20181 IPDesign Bases Assurance Inspection (Teams)7111121M06/18/201806/22/201871124.07-REMP11 IPRadiological Environmental Monitoring Program71124.0706/25/201806/29/2018REQUAL-HC REQUAL INSP WITH P/F RESULTS21 IPLicensed Operator Requalification Program - Annual Review7111111A10/08/201810/12/20181 IPLicensed Operator Requalification Program7111111B10/08/201810/12/201871124-BASELINE HP11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/20181 IPOccupational ALARA Planning and Controls71124.0211/26/201811/30/20181 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHope CreekInspection / Activity Plan08/29/2017-06/30/2019Page 2 of 208/29/2017 09:29:3971124-BASELINE HP11 IPOccupational Exposure Control Effectiveness71151-OR0111/26/201811/30/20181 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/201871124-HP11 IPRadiological Hazard Assessment and Exposure Controls71124.0101/07/201901/11/20191 IPOccupational ALARA Planning and Controls71124.0201/07/201901/11/2019EP-EP PROGRAM INSPECTION21 IPAlert and Notification System Testing711140202/11/201902/15/20191 IPEmergency Preparedness Organization Staffing and Augmentation System711140302/11/201902/15/20191 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140502/11/201902/15/20191 IPPerformance Indicator Verification7115102/11/201902/15/20197111105T-TRIENNIAL FIRE PROTECTION41 IPFire Protection [Triennial]7111105T03/11/201903/15/20191 IPFire Protection [Triennial]7111105T03/25/201903/29/201971124.06-RETS11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/24/201906/28/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.