PNO-IV-85-063, on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals

From kanterella
Revision as of 17:59, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-IV-85-063:on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals
ML20138J497
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/10/1985
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-85-063, PNO-IV-85-63, NUDOCS 8512170537
Download: ML20138J497 (1)