ML19256A852

From kanterella
Revision as of 16:22, 18 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1978
ML19256A852
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/12/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19256A853 List:
References
NUDOCS 7901160235
Download: ML19256A852 (1)


Text

.

  • '

.

.

, mawra nwr cunncv ffX)f bnh 1Sh Sire +:'

Ret ONe to PtA t

, {J errang*'Jm A at.,,ma 35W t T( kv<rn 205 323-5341 L

F. L. CLAYTON, JR.

hvweneset Alabama Power

[f D ^,'X;f #:* *ffi t *O ([f t: SyT?CP)

January 12, 1979 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report

Dear Sir:

Attached are two (2) copies of the December, 1978 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9,1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have questions, please ad~ise.

Yours very truly, F. L. Clayto Jr.

FLCJr/TNE:bh]

Attachment cc: Director, IE (10 copies)

Director, RII (1 copy) k

@9\ \

7 901 16 0 2ET