IR 05000266/2010403

From kanterella
Revision as of 17:57, 22 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000266-10-403, (Drs), IR 05000301-10-403 (Drs), on 04/26/2010 - 04/30/2010, Point Beach Nuclear Plant, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter
ML101470884
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/25/2010
From: Duncan E R
Plant Support Branch II
To: Meyer L
Point Beach
References
IR-10-403
Download: ML101470884 (3)


Text

May 25, 2010

Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2010403(DRS);

5000301/2010403(DRS)

Dear Mr. Meyer:

On April 30, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 30, 2010, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. - SECURITY-RELATED INFORM ATION Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA by D. Funk for/

Eric Duncan, Chief

Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Nonpublic

Enclosure:

Inspection Report 05000266/2010403(DRS); 05000301/2010403(DRS)