MONTHYEARL-24-243, License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 62024-11-0707 November 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 6 L-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report 2024-09-09
[Table view] Category:Meeting Summary
MONTHYEARML24284A2342024-10-22022 October 2024 October 2024 Perry Draft EIS Public Meetings - Summary ML24166A2122024-06-18018 June 2024 June 10, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML24064A2212024-03-14014 March 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1 - Summary of the Jan-Feb 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report ML23303A0662023-11-0606 November 2023 October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary Memo ML23187A4692023-07-0606 July 2023 Summary of the June 22, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML23065A2192023-03-15015 March 2023 Second Safety Pre-Application Meeting Summary ML22258A0632022-09-26026 September 2022 July 21, 2022, Perry Nuclear Plant, Unit 1 License Renewal Environmental Pre-Application Meeting Summary - Letter ML22213A0362022-08-29029 August 2022 Safety Pre-Application Meeting Summary ML22147A0372022-05-31031 May 2022 Summary of the May 19, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML21055A2642021-03-0202 March 2021 Summary of February 16, 2021, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential License Amendment Request Related to Revising Flood Mitigation for Perry Nuclear Power Plant, Unit No. 1 ML20324A2192020-11-23023 November 2020 Summary of November 18, 2020, Teleconference with Energy Harbor Nuclear Corp. to Discuss Potential Changes to the Emergency Plan for Perry Nuclear Power Plant, Unit No. 1 ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML20163A6272020-06-15015 June 2020 Summary of Public Telecon with Energy Harbor on License Renewal for Perry Nuclear Plant ML19249C7652019-09-0404 September 2019 Summary of the July 17, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Perry Nuclear Power Plant ML18332A4122018-12-0303 December 2018 Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Proposed Revisions to the Emergency Plan ML18117A1672018-04-25025 April 2018 Summary of Public Outreach/Open House to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 ML18065A1392018-03-15015 March 2018 Summary of February 21, 2018, Public Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed Revision to the Perry Nuclear Power Plant, Unit 1, Fire Protection Program ML17234A5542017-08-24024 August 2017 Summary of Telephone Conference with Firstenergy Nuclear Operation Co., Regarding Verbal Authorization of Relief Request to Use Alternative for Perry Nuclear Plant, Unit 1 ML17205A0242017-07-19019 July 2017 Summary of July 11, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant ML17193A4192017-07-17017 July 2017 Summary of June 29, 2017, Public Meeting with Firstenergy Nuclear Operating Company Regarding a Proposed License Amendment Request for Perry Nuclear Power Plant, Unit 1, to Revise the Flooding Licensing Basis ML16321A0052016-11-21021 November 2016 Summary of November 9, 2016, Public Teleconference Call Regarding Upcoming Perry Nuclear Power Plant, Unit 1 License Amendment Request to Revise Technical Specifications to Support Implementation of Alternate Source Term Amendment ML16180A1352016-06-22022 June 2016 Summary of Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-of-Cycle Performance Assessment of Perry Nuclear Power Plant ML16053A3432016-02-24024 February 2016 2/9/16, Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Upcoming Perry Nuclear Plant, Unit 1 License Amendment Request to Revise Technical Specifications for Suppression Pool Water Level & Makeup S ML15280A2002015-10-0909 October 2015 Summary of Meeting with Firstenergy Nuclear Operating Company, on Fenoc'S Upcoming Request to Change Emergency Action Levels at Perry Nuclear Power Plant, Unit 1 ML15075A2462015-04-0808 April 2015 January 7 & 15, 2015 Summary of Meetings with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14296A6892014-11-10010 November 2014 Summary of September 18, 2014, Meeting with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change ML14086A0592014-03-26026 March 2014 3/18/14 Summary of Public Meeting to Discuss the 2013 Perry End-of-Cycle Performance Assessment ML13113A3932013-04-23023 April 2013 4/10/2013 - Summary of Perry Public Meeting to Discuss the 2012 Annual Assessment Results ML13080A2502013-03-21021 March 2013 2/20/13 Summary of Meeting Regarding Inspection Procedure 95002 Inspection ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12276A3362012-10-0202 October 2012 September 19, 2012 - Summary of a Public Meeting to Discuss Constellation Energy Nuclear Group, LLC (Ceng) Fleet Performance ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12144A3202012-05-31031 May 2012 5/8/2012: Meeting Summary - Perry Presubmittal Meeting ML12102A2122012-04-11011 April 2012 4/5/2012 - Summary of Perry Public Meeting ML1123602872011-08-23023 August 2011 8/11/2011- Summary of Public Meeting to Discuss the Perry Nuclear Plant, Unit 1, End of Cycle Plant Performance Assessment ML1122002062011-08-0808 August 2011 Summary of June 26, 2011 Public Meeting to Discuss Constellation Energy Nuclear Group, LLC (Ceng) Fleet Performance ML1021702272010-08-0505 August 2010 Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the Perry Nuclear Power Plant, Unit 1, End-of-Cycle Plant Performance Assessment ML1009502432010-04-0505 April 2010 Meeting Summary of 3-31-10 Public Meeting with FENOC ML1003316682010-02-0202 February 2010 Summary of Public Meeting to Discuss Constellation Nuclear Energy Group Fleet Performance ML0932204092009-11-17017 November 2009 Summary of Public Meeting to Discuss Actions Taken by FENOC to Address Human Performance Substantive Cross-Cutting Issues ML0908600652009-01-28028 January 2009 01/23/09 & 01/28/09 Summary of Telecons Between NRC Staff and Prairie Island License Review Project ML0902605032009-01-22022 January 2009 Summary of Public Meeting to Discuss FENOC Fleet Performance (Davis-Besse, Perry, and Beaver Valley Nuclear Power Plant) ML0834706522008-12-30030 December 2008 Summary of Periodic Meeting with Firstenergy Nuclear Operating Company (FENOC) Staff on Licensing Action Status ML0811506052008-04-24024 April 2008 Summary of Public Meeting with Firstenergy Nuclear Operating Co. to Discuss the 2007 Perry End-of-Cycle Performance Assessment ML0802303062008-01-22022 January 2008 Summary of Meeting with FENOC to Discuss Fleet Performance NEI 06-04, Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant2007-08-21021 August 2007 Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant ML0723203812007-08-21021 August 2007 Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant ML0720701452007-08-0707 August 2007 Summary of June 27, 2007, Public Meeting Regarding Fenoc'S Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event 2024-06-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 March 26, 2014
LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant
SUBJECT:
SUMMARY
OF THE MARCH 18, 2014, PERRY PUBLIC MEETING On March 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2013 annual assessment results for Perry. Enclosure 1 is a list of attendees for the meeting. A copy of the slides used by the NRC's staff during the meeting is located in ADAM S at Accession Number ML14079A091.
At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Perry, and the NRC's inspection plans for 2014. The NRC's presentation was followed by statements from the Perry Site Vice-President and the Director of Site Operations which included information on the performance and accomplishments for 2013, the plant priorities for 2014, a 40-million dollar financial commitment to post-Fukushima efforts, the continued focus on improving occupational radiation safety, and on the planning for the 2015 refueling outage. Cynthia Pederson, the Regional Administrator for the NRC's Region III Office, acknowledged the information provided by the Perry officials and emphasized the importance of Perry continuing in 2014 the improvement in performance seen in 2013 that resulted in the NRC moving Perry from the Degraded Cornerstone Colum n (Column 3) of the NRC's Action Matrix to the Licensee Response Column (Column 1).
After the business part of the meeting ended, NRC and Perry representatives listened to comments and attempted to address several questions from the public. The questions were related to tritium releases at Perry, the number and manufacturer of the spent fuel dry cask storage units used at Perry, an overview of post-Fukushima efforts taken by Perry, and the use by Perry of a local vendor for transfer of radioactively contaminated material. NRC representatives provided additional information to a member of the public after the meeting.
/RA/______________________
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
Meeting Attendance List
cc w/encl: Distribution via List Serv TM PERRY 2013 PERFORMANCE ASSESSMENT MEETING March 18, 2014 MEETING ATTENDANCE LIST NRC Attendees
Cynthia Pederson, Regional Administrator Anne Boland, Director, Division of Reactor Projects Billy Dickson, Chief, Health Physics and Incident Response Branch Mark Marshfield, Perry Senior Resident Inspector Jim Nance, Perry Resident Inspector Diane Flowers, Perry Office Administrative Assistant Prema Chandrathil, Public Affairs Officer Michael Kunowski, Chief, Branch 5, Division of Reactor Projects FirstEnergy Nuclear Operating Company Attendees
Ernest Harkness, Perry Site Vice-President David Hamilton, Perry Director of Site Operations Other Perry Plant/FirstEnergy Employees
Members of the Public
Ed Klco, Mayor, North Perry Village Connie Kline, Ohio CARE - Citizens Against a Radioactive Environment Janet Jodlowski, Ohio CARE
John Laituri
Milly Laituri
Enclosure March 26, 2014 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant
SUBJECT:
SUMMARY
OF THE MARCH 18, 2014, PERRY PUBLIC MEETING On March 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2013 annual assessment results for Perry. is a list of attendees for the meeting. A copy of the slides used by the NRC's staff during the meeting is located in ADAMS at Accession Number ML14079A091.
At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Perry, and the NRC's inspection plans for 2014. The NRC's presentation was followed by statements from the Perry Site Vice-President and the Director of Site Operations which included information on the performance and accomplishments for 2013, the plant priorities for 2014, a 40-million dollar financial commitment to post-Fukushima efforts, the continued focus on improving occupational radiation safety, and on the planning for the 2015 refueling outage. Cynthia Pederson, the Regional Administrator for the NRC's Region III Office, acknowledged the information provided by the Perry officials and emphasized the importance of Perry continuing in 2014 the improvement in performance seen in 2013 that resulted in the NRC moving Perry from the Degraded Cornerstone Column (Column 3) of the NRC's Action Matrix to the Licensee Response Column (Column 1).
After the business part of the meeting ended, NRC and Perry representatives listened to comments and attempted to address several questions from the public. The questions were related to tritium releases at Perry, the number and manufacturer of the spent fuel dry cask storage units used at Perry, an overview of post-Fukushima efforts taken by Perry, and the use by Perry of a local vendor for transfer of radioactively contaminated material. NRC representatives provided additional information to a member of the public after the meeting.
/RA/______________________
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
Meeting Attendance List cc w/encl: Distribution via List Serv TM DISTRIBUTION
- See next page DOCUMENT NAME: Summary of the March 18, 2014, Perry Public Meeting Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MKunowski DATE 03/26/14 OFFICIAL RECORD COPY Letter to FirstEnergy Nuclear Operating Company for Michael Kunowski dated March 26, 2014
SUBJECT:
SUMMARY
OF THE MARCH 18, 2014, PERRY PUBLIC MEETING DISTRIBTUION
- Ernesto Quinones RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource
RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth
Allan Barker
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley ROPassessment.Resource@nrc.gov