ML20078C789

From kanterella
Revision as of 04:47, 27 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Suppl to 830415 & 0805 Ltrs Addressing Milestones & Completion Dates for NUREG-0737 Suppl 1 Activities. Emergency Operating Procedures Generation Package Submitted Jul 1983.Reg Guide 1.97 Compliance Discussed
ML20078C789
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/22/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 8309280180
Download: ML20078C789 (4)


Text

_ _ - - _ _ _ _ _ _ _ _

. Alabama Power Company 600 NSrth 18th Street Post Offico Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

MigCg,*"' AlabamaPbwer the soWhem ekctrC System September 22, 1933 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 NRC Generic Letter 82-33, " Supplement 1 to NUREG-0737 Requirements for Emergency Response Capability,"

dated December 17, 1982 Gentlemen:

In letter dated April 15, 1983, Alabama Power Compan) submitted its Preliminary Farley ERC Integrated Implementation Plan and Schedule to address the basic provisions and clarifications of Supplement 1 to NUREG-0737. Af ter discussions with the NRC, Alabama Power Company provided in latter dated August 5,1983 a list of milestones and completion dates to supplement the schedules submitted in Attachment 4 of the letter dated April 15, 1983. It has been recently determined that the August 5,1983 letter should be revised to indicate a submittal schedule for the Unit 1 R.G.1.97 Compliance Report of June 1984 The April 15 and August 5,1533 letters stated that walkdowns would be required for some items to determine compliance to NRC criteria.

During a design schedule review meeting held on September 21,1983, it was determined that outage walkdowns would be required for both Units 1 and 2 in order to complete the R.G.1.97 Compliance Reports. Wal kdown s are currantly scheduled for the Unit 2 refueling outage which began on September 16, 1983. The Unit 2 R.G.1.97 Compliance Report is scheduled to be submitted to the NRC in March 1984 as indicateo in the August 5, 1983 letter. As noted in the review meeting, the Unit 1 shutdown 1- (required for such walkdowns) is thereby causing the initially proposed Unit 1 R.G.1.97 Compliance Report date of March,1984 to become June, 1984 due to this oversight in the original schedule evaluation.

8309280180 830922 PDR ADOCK 05000348 f F PDR i

e .

Mr. S.'A. Varga September 22, 1983 U. S. Nuclear Regulatory Commission Page 2 i

Enclosed is a supplement to the April 15 and August 5, 1983 schedules addressing milestones and completion dates for NUREG-0737, Supplement 1 activities. This enclosure has been revised to indicate the schedule to submit the R.G.1.97 Compliance Report for each unit as discussed herein.

Yours truly, L C F LCJ r/BDM: g rs-D5 Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers

ENCLOSURE NUREG-0737, Supplement 1 Milestones and Completion Dates Supplement to APCo letter dated April 15, 1983 Milestone Completion Date Safety Parameter Display System (SPDS)

Submittal of Written November 1983 Safety Analysis Submittal of Implementation Plan November 1983 Fully operable SPDS Updated schedule to be submi tted by December 15, 1983 Operator training with SPDS Updated schedule to be submitted by December 15, 1983 Regulatory Guide Submittal of RG 1.97 March 1984 - Unit 2 Compliance Report June 1984 - Unit 1 Completion of RG 1.97 Updated schedule to be modifications submi tted by December 15, 1983 Control Room Design Submittal of CRDR Program October 1983 Plan Submittal of CRDR Summary Report Updated schedule to be submitted by December 15, 1983 Submittal of schedule to resolve Updated schedule to be identified human engineering submitted by December 15, discrepancies 1983

e . . .

b i

Enclosure i

Page 2 Milestones Completion Date

, Emergency Operating Procedures (E0Ps) i Submittal of Procedures July 1983

Generation Package Implementation of upgraded Nine months after the c E0Ps Westinghouse Owners Group 4

approves the Generic Emergency fiesponse Procedure Guidelines,

Revision 1.

J' i

BDM-D5 l

t f

4 e

i f

. . . . . . , ,,_m..-,- - - . . , , , . .. -, . -. - - - - . . - , ,------ --- - . - - _ ,.