ML15120A021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713  April 28, 2015  MEETING SUMMARY  LICENSEE: ENTERGY NUCLEAR NORTHEAST (ENTERGY)
FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT 
==SUBJECT:==
SUMMARY OF PUBLIC MEETING
On April 23, 2015, from 4:30 p.m. to 6:00 p.m., at the Town of Scriba Municipal Building, Oswego, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at James A. FitzPatrick Nuclear Power Plant (FitzPatrick) for 2014.
A notice of the open-house was issued April 10, 2015, and posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15103A019. ADAMS is accessible from the NRC Web page at:  http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards, fact sheets, and was available to discuss its assessment of the safety performance of Fitzpatrick for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015, (ADAMS Accession No. ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick's performance, and the role of the agency in ensuring safe plant operations.                  /RA/    Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects 
==Enclosure:==
Public Meeting Sign-In Sheet  (ML15117A514) 
ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick's performance, and the role of the agency in ensuring safe plant operations.                  /RA/    Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects 
==Enclosure:==
Public Meeting Sign-In Sheet (ML15117A514)
Distribution: (via email) A. Burritt, DRP  T. Setzer, DRP J. Petch, DRP J. Schussler, DRP R. Montgomery, DRP E. Knutson, DRP B. Sienel, DRP RidsNrrPMFitzPatrick Resource DOC NAME:  G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2015 Annual Assessment Meetings\Fitz\Fitz 2015 AAM Summary.docx ADAMS Accession No. ML15120A021      SUNSI Review  Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available  OFFICE RI/DRP RI/DRP    NAME RMontgomery/RAM ABurritt/ALB    DATE 4/28/15 4/28/15}}

Revision as of 02:45, 12 June 2018

April 23, 2015, Summary of Annual Assessment Meeting for James A. FitzPatrick Nuclear Power Plant on 4/23/2015
ML15120A021
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/28/2015
From: Burritt A L
Reactor Projects Branch 2
To:
Burritt A L
References
MN 15-016
Download: ML15120A021 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 28, 2015 MEETING SUMMARY LICENSEE: ENTERGY NUCLEAR NORTHEAST (ENTERGY)

FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

SUBJECT:

SUMMARY OF PUBLIC MEETING

On April 23, 2015, from 4:30 p.m. to 6:00 p.m., at the Town of Scriba Municipal Building, Oswego, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at James A. FitzPatrick Nuclear Power Plant (FitzPatrick) for 2014.

A notice of the open-house was issued April 10, 2015, and posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15103A019. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards, fact sheets, and was available to discuss its assessment of the safety performance of Fitzpatrick for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015, (ADAMS Accession No. ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick's performance, and the role of the agency in ensuring safe plant operations. /RA/ Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15117A514)

ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick's performance, and the role of the agency in ensuring safe plant operations. /RA/ Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15117A514)

Distribution: (via email) A. Burritt, DRP T. Setzer, DRP J. Petch, DRP J. Schussler, DRP R. Montgomery, DRP E. Knutson, DRP B. Sienel, DRP RidsNrrPMFitzPatrick Resource DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2015 Annual Assessment Meetings\Fitz\Fitz 2015 AAM Summary.docx ADAMS Accession No. ML15120A021 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RMontgomery/RAM ABurritt/ALB DATE 4/28/15 4/28/15