April 23, 2015, Summary of Annual Assessment Meeting for James A. FitzPatrick Nuclear Power Plant on 4/23/2015
ML15120A021
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/28/2015
From: Arthur Burritt
Reactor Projects Branch 2
To:
Burritt A
References
MN 15-016
Download: ML15120A021 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 28, 2015 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR NORTHEAST (ENTERGY)

FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 23, 2015, from 4:30 p.m. to 6:00 p.m., at the Town of Scriba Municipal Building, Oswego, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at James A. FitzPatrick Nuclear Power Plant (FitzPatrick) for 2014.

A notice of the open-house was issued April 10, 2015, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15103A019. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards, fact sheets, and was available to discuss its assessment of the safety performance of Fitzpatrick for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015, (ADAMS Accession No. ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatricks performance, and the role of the agency in ensuring safe plant operations.

/RA/

Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15117A514)

ML15057A358). The NRC poster boards and fact sheets included background on the Reactor Oversight Process.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and two local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatricks performance, and the role of the agency in ensuring safe plant operations.

/RA/

Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15117A514)

Distribution: (via email) R. Montgomery, DRP A. Burritt, DRP E. Knutson, DRP T. Setzer, DRP B. Sienel, DRP J. Petch, DRP RidsNrrPMFitzPatrick J. Schussler, DRP Resource DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2015 Annual Assessment Meetings\Fitz\Fitz 2015 AAM Summary.docx ADAMS Accession No. ML15120A021 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RMontgomery/RAM ABurritt/ALB DATE 4/28/15 4/28/15