Summary of Annual Assessment Meeting for James A. Fitzpatrick Nuclear Power Plant
ML16229A454
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/16/2016
From: Arthur Burritt
NRC/RGN-I/DRP/PB5
To:
Burritt A
References
Download: ML16229A454 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 16, 2016 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR OPERATIONS FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING On July 26, 2016, from 4:30 p.m. to 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house at the Town of Scriba Municipal Building in Oswego, NY. The NRC conducted the open-house to discuss its assessment of the safety performance at James A. FitzPatrick Nuclear Power Plant (FitzPatrick) for 2015.

A notice of the open-house was issued on July 11, 2016, and was posted on the NRCs external (public) Web page. A revised notice was issued thereafter on July 15, 2016. These meeting notices can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16194A012 and ML16197A040 respectively. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC provided informational handouts and was available to discuss its assessment of the safety performance of Fitzpatrick for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A114). The NRC informational handouts presented included background on the Reactor Oversight Process.

Additional information related to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and a member of the media attended the open-house and were offered the opportunity to question the NRC regarding Entergys performance and the role of the agency in ensuring safe plant operations.

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects

ML16060A114). The NRC informational handouts presented included background on the Reactor Oversight Process.

Additional information related to the NRC's Annual Assessment Process and the safety performance of FitzPatrick can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and a member of the media attended the open-house and were offered the opportunity to question the NRC regarding Entergys performance and the role of the agency in ensuring safe plant operations.

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 5 Division of Reactor Projects Distribution: (via email)

ABurritt, DRP JAyala, DRP EMiller, DRP LCline, DRP JVazquez, DRP BSienel, DRP CBickett, DRP JPfingsten, DRP RidsNrrPMFitzPatrick Resource DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2015 EOC\FP 2016 AAM\2016 FP AAM Meeting Summary.docx ADAMS Accession No. ML16229A454 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JVazquez ABurritt DATE 08/12/2016 08/16/2016