|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span NOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARTXX-9914, Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed1999-06-16016 June 1999 Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed ML20206E7271999-04-29029 April 1999 Submits Original & Four Complete Copies of Application for Renewal of Permit to Discharge,Deposit or Dispose of Wastes Into or Adjacent to Water in State. with Three Oversize Drawings ML20045D3451992-06-16016 June 1992 Discusses Util Review of 920603 Ltr Outlining Thermal Science,Inc Field Surveillance of Application of Thermo-Lag 330 Fire Barrier Sys on Util Test Assemblies at Omega Poing Labs.Supporting Documentation Encl ML20087G5791992-05-0808 May 1992 Provides Matl Re Complaint Against Stated Utils & Nuclear Support Svc,Inc & Addresses Issues in Detail.Respondents Actions Prevent Complainant Career in Nuclear Industry. Related Info,Including DOL Correspondence Encl.Info Deleted ML20091Q2891992-01-27027 January 1992 Forwards Rev 7 to Quarterly Plant Performance & Other Indicator Data for Fourth Quarter of 1991 & Gross Heat Rate Data Form for 1991 ML20070T7651991-04-0101 April 1991 Forwards 910327 License Amend Request 91-001 Re Addition of Spec 3/4.7.12 & Bases 3/4.7.12 for Safety Chilled Water Sys ML20073D1051991-03-29029 March 1991 Comments on Final Rept Addressing Scaling for Unit 1,dtd Feb 1991 Per Insp Repts 50-445/90-47 & 50-446/90-47.Concerns Raised That Util Selected Criterion XI Re Test Control as Sole Mgt Std to Control safety-related Activities ML20066A5711990-12-19019 December 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15,authored by Ebasco ML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20246C6031989-06-28028 June 1989 Notifies of Potential Significant Deficiency That May Be Reportable Under 10CFR21 Re Atmospheric Dump Valves,Per ML20245K0651989-05-18018 May 1989 FOIA Request for Records Re DOL Complaint Filed by Jl Stites Against Util on 880802 ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20196B5361988-11-23023 November 1988 Forwards Prompt Notification Sys Test Rept Using FEMA Region VI Reporting Form for Apr-Oct 1988 ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl 1999-06-16
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20246C6031989-06-28028 June 1989 Notifies of Potential Significant Deficiency That May Be Reportable Under 10CFR21 Re Atmospheric Dump Valves,Per ML20245K0651989-05-18018 May 1989 FOIA Request for Records Re DOL Complaint Filed by Jl Stites Against Util on 880802 ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20196B5361988-11-23023 November 1988 Forwards Prompt Notification Sys Test Rept Using FEMA Region VI Reporting Form for Apr-Oct 1988 ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 ML20216D1721987-06-20020 June 1987 Ack Receipt of .Clarifies Agreement Made During Telcon Re Date for Case to File Initial Supplementary Responses Deferred Until 870706.Necessary Discovery & Response Should Be Completed Also.Related Correspondence ML20215D7141987-06-0303 June 1987 Informs All Concerned W/Facility Independent Assessment Program of Address Correction ML20214S0641987-05-26026 May 1987 Ack Receipt of Applicant 870518 Fifth Progress Rept.Requests That Recipient Notify of When Substantive Matls Will Be Made Available So Case May Decide on Course of Action Re Comanche Peak Response Team Adequacy Issues.Related Correspondence ML20234C4401987-05-0101 May 1987 Forwards Communication Repts Re Cygna Audits of S&W Piping & Pipe Support Verification Activities,Per Phase 4 of Independent Assessment Program.Submittal Constitutes Communications Rept Transmittal 23 1990-08-21
[Table view] |
Text
.- ,
LAW OFF4CES LoWENSTEIN, NEWM AN. REIs. AXELHAD & TOLL 802 5 CON N ECTtCut AVE NU E, N. w.
,,,,,,g,,,,,,,,,, WASHINGTON. O.C. 20036 i
~
..$ce ..a\ .o 202 + 862-8400 c.v,o
....... ..ro. u....
...o.........
I' .". .".' ~. 'e III'/." March 13, 1980
.o...e e.s.
P( , . 4 f t. h.
..u...,.....v. 0)
,......e.....
co...... .... - g
< gg DOCK]D IIAND DELIVER *- - ;
D tSR i 3 ECDP -Q' Susan B. Cyphert, Esquire -
3g ,
U.S. Department of Justice ,
g ggggg Antitrust Division, Energy Section -
ggd /
414 Eleventh Street, N.W.
4# @g Room 8308 im ,
Washington, D. C. 20530 Re: In the Matter of Houston Lighting ,
.& Power Company, et al. (South Tc.xas Project, Units.1 and 2), Docket Nos.
50-498A-50-499A; Texas Utilities l
Generating Company, et al. (Comanche Peak Str am Electric Station, ' Units 1 and 2), Docket Nos. 50-445A-50-446A.
~
Dear Ms. Cyphert:
Thank you for your letter of March 12, 1980 (copy attached). IIouston is willing, as I indicated, to accept that letter in lieu of the immediate interrogatory. answer contemplated by the Board's ruling at the' March 7 prehearing conference, based on your representation that the Department' '
simply cannot now give us any more information. I wish to emphasize, however, that your letter does not~ provide what we need in order.to take.a meaningful deposition.of Mr.. Stover-and does not resolve the problems IIouston has been presented with concerning his testimony. :
By virtue of the. Department's representation that it
.now intends to call Mr. Carl Stover as an expert witness, we will have to redepose Mr. Stover regarding his expert opinion. Before'we do undertake to redepose Mr. Stover,.how-ever, I need clarification from.you as to whether you have now reached an agreement with Mr. Stover and his attorney
~
that Mr. Stover will give expert. testimony.
800.4090439 r,n.-
-, , . - . , .,, , _ ,r,7 .,
w - --
9 low r.m r m, N r.w n w. It u s. A x r uu o & Tou.
Suuan B. Cyphert, Esquire March 13, 1980 Page Two In the deposition of Mr. Stover taken on July 24, 1979, we were prevented from asking Mr. Stover questions about his export opinion. Prior to the beginning of the deposition, Mr. Galt reprenented that Mr. Stover had not been retained as an expert witness by the Department and, therefore, he was not going to let Mr. Stover answer any quections relating to Mr. Stover's expert opinions. Mr.
Calt did, in fact, instruct Mr. Stover not to answer ques-tions on mattern which the Department now staten he in going to tenti fy about. Ms. Ilarris agreed with the position taken by Mr. Galt and likewine objected to questions in the deposi-tion on the grounds that they called for expert opinion.
Accordingly, I am requenting immediate confirmation that the Department han now retained Mr. Stover, and that his attor-ney will not object to !!ouston asking him expert opinion questions when we redepoac him.
In addition, Mr. Stover has refused to produce the ctudies which the Department han indicated he is now going to testify about. lie claimed that these studien were priv-ileged and would not be produced because he was not going to t.entify about them in the hearing. Again, if Mr. Stover la now going to testify about thoue studies, we would expect the Department to produce them immediately along with all of the workpapern and correspondence relating to the studies.
As you know, Mr. Stover's cliento have alno refused to pro-duce thene studica. If the Department intenda to call any of Mr. Stover's clients an fact witneauen, we requent that you provide un with their copics of Mr. Stover's studies along with any of his workpapers they may have.
I concur in the suggestion in your letter that the Board chould be advised of our agreement and of the status of this matter. Accordingly, I have forwarded copies of our correspondence on thia matter to the Board members and the Service Lint.
The exigencies of time are such that the Department's immediate attention to the matters set forth above would be much appreciated.
ery tru yourn, t
, }$ #
( oyglas G. Green Attorney for llouston Lighting
& Power Company DGG/nm .
cc: Service List i
,yd3 UNITED ST.\TES DEPAlfrMENT OF JUSTICE W@e.
.- .H,. w ms m us.n.c. :uno
L:% '
",*; ";'.1.; March 12, 1980
.4,.............-
DAK:SBC 60-415-105 I!AMD-DELIVERED Douglas G. Green, Esquire Lowenstein, Newman, Reis, Axelrad & Toll 1025 Connecticut Avenue, N. W.
Washington, D. C. 20036 Re: In the Matter of Houston Lighting &
Power Company, et al. (South Texas Project, Units 1 and 2), Docket Nos.
50-498A-50-499A; Texas Utilities Gene-rating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2),
Docket Nos. 50-445A-50-446A
Dear Mr. Green:
Pursuant to our telephone conversation on March 11, 1980, I am sending you this letter to confirm our agreement.
On February 19, 1980, IIouston Lighting & Power Company
("IIL& P " ) filed its Motion to Compel further answers from the Department of Justice (" Department") re: Carl Stover. On March 5, 1980, the Department filed its Response which sets forth our present knowledge regarding Mr. Stover's proposed testimony. On March 7, 1980, the Board ordered the Department to provide IIL&P with further answers to its Fourth Set of In-terrogatories to the Department regarding Mr. Stover. On March 11, 1980, I contacted you to clarify that the above-mentioned Response, filed by the Department on March 5, 1980, providen the totality of the Department's present knowledge regarding f1r. Stover at this time and contains the inforna-tion requested by your interrogatories. I agreed to provido you with any further information as it became available regard-ing the scope of Mr. Stover's proposed testinony or any other l
l l
~
o information sought by those interrogatories. I further acreed to provide you with any documents sont to or received from Mr. Stover, in conpliance with the Board's order relatina to expert witnesses. 1/ Finally, if HL&P desires, the Department is available to attend another deposition of Mr. Stover at any nutually convenient time prior to trial.
It is my understanding, that based on the aforegoing rep-resentations that !!L&P presently is satisfied that its inter-rog ories have been answered. I would like to inform the Doa. t of this acreenent at your earliest convenience, prefer-abl, today or tomorrow.
Sineerely, k /)(fly' lOS l0Y Susan Braden Cyphert Attorney Energy Section cc: Carl Stover Enclosure lf Pursuant to that agreement I am enclosinq a copy of a letter sent to Mr. Stover on March 11, 1980.
l 1
mm I
/r .
, M M. r ~.. UNITED STATES DEPAllTMENT OF JUSTICE
,s ,.4 .a W A5III$ G*1IIN, n.c. 2OM O
- u m,........,.
i ,. . . . s .4. . . .
MAR 111980 c,a i , r .. i .....:. ..a w i.,,
DAK:SBC 60-415-105 Carl N. Stover C. II . Guernsey, Inc.
3555 N.W. 58th Street Oklahoma City, Oklahoma 73102 Re: In the Matter of I!ouston Lighting & Power Company, et al. (Soutri Vexas Project, Un fts 1 and 2), Docket Nos. 50-498A-50-499A; Texas Utilities Generating Comoany, et al. (Coman-che Peak Steam Electric Station, Units 1 and 2), Docket Nos. 50-445A-50-446A
Dear Mr. Stover:
Pursuant to our telephone conversation, enclosed please find a copy of : (1) E. Dale Scarth's direct testimony in the SCC proceedings; (2) a copy of E. Dale Scarth's deposition tes-timony in this proceeding to date (he is scheduled to be de-posed again in Dallas on March 27-28, 1980); and (3) a copy of Eugene Sin-the deposition testimony in this proceeding of D.
m o n t.. Mr. Simnons will be redeposed on April 4-5, 1980, here in Washington. - -
Texas Utiliti'es has designated Mr. Scarth as its expert engineer in this case. Ilouston Lighting & Power Company ("IIL & P " )
has designated Mr. Simmons and flerb Woodson of the University of Texar, as its expert engineering witnesses. Mr. Woodson is being deposed in Austin, Texas, today. I will send you a copy of his transcript next week.
l'or your information, I am also enclosing a copy of a mo t io n the Department recently received regarding your proposed testimony and a copy of the Department's response which is self-explanatory. Since the Department has now listed you as a potential expert witness, I am obligated by Order of the Board to provide copies of any correspondence to you or from you to all counsel, which I have done with this letter.
/
At a pretrial conference last Friday, the Board indicated that trial would conmence May 14, 1980, as scheduled. We are obligated to provide a sumnary of the proposed testimony of all witnesses in our case to the Board and all counsel by April 14, 1980. In that regard, I would like to schedule a convenient time prior to that time to discuss this matter with you. At-torneys for IILt.P have requested an opportunity to redepose you if your testimony will expand beyond the scope of your previ-ous deposition.
Thank you for your continuing cooperation and interest in this matter. Please feel free to contact me regarding a con-venient time and place we can meet and if I can be of further assistance to you or your client (telephone: 202-724-6667).
Sincerely, 6/ don JU?'d C6 " , M Susan Braden Cyphert Attorney Energy Section Antitrust Division Attachments cc: all counsel of record
- . - ~. _
~
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE Ti!E ATOMIC SAFETY AND LICENSIMG BOARD In the Matter of )
)
!!OUSTON LIGIITING & POUER COMPANY, ) Docket Nos. 50-498A et al. ) 50-499A
)
(South Texas Project, Units 1 )
and 2) )
)
)
TEXAS UTILITIES GEMERATING COMPANY ) Docket Nos. 50-445A et al. ) 50-446A
)
(Comanche Peak Steam Electric )
Station, Units 1 and 2) )
CERTIFICATE OF SERVICE I IIEREBY CERTIFY that copies of the foregoing:
Letter to Susan B. Cyphert, Esquire were served upon the following persons, by hand *, or by deposit in the United States Mail, first class postage prepaid, this 13th day of March, 1980.
/
y*3 a 4 d?NT
/ / ' ,l
/
s
Marshall E. Miller, Esquire U.S. Nuclear Regulatory Commission Frederic D. Chanania, Esquire Washington, D.C. 20555 Michael B. Blume, Esquire Ann P. Hodgdon, Esquire Michael L. Glaser, Esquire U.S. Nuclear Regulatory Commission 1150 17th Street, N.W. Washington, D.C. 20555 washington, D.C. 20555 Roff Hardy Sheldon J. Wolfe, Esquire Chairman and Chief Executive U.S. Nuclear Pegulatory Commission Officer Pashington, D.C. 20555 Central Power and Light Company Post Office Box 2121 Atomic Safety and Licensing Corous Christi, Texas 78403 Anpeal Board Panel U.S. Nuclear Regulatory Commission G.K. Soruce, General Manager Washington, D.C. 20555 City Public Service Board Post Office Box 1771 Chase R. Stephens, Supervisor (20) San Antonio, Texas 78203 Docketing and Service Branch U.S. Nuclear Regulatory Commission Mr. Perry G. Brittain Washington, D.C. 20555 President Texas Utilities Generating Company Mr. Jerome D. Saltzman 2001 Bryan Tower Chief, Antitrust and Indemnity Dallas, Texas 75201 Group U.S. Nuclear Regulatory Commission G.W. Oprea, Jr.
Washington, D.C. 20555 Executive Vice President Houston Lighting & Power Comoany J. Irion Worsham, Esquire Post Office Box 1700 Merlyn D. Sampels, Esquire Houston, Texas 77001 Snencer C. Polyca, Esquire Worsham, Forsyth & Sampels R.L. Hancock, Director 2001 Bryan Tower, Suite 2500 City of Austin Electric Utility Dallas, Texas 75201 Post Office Box 1086 Austin, Texas 78767 Jon C. Foorl , Esquire Matthews, Nowlin, Macfarlane Joseoh Gallo, Esquire
& Barrett Robert H. Loeffler, Esquire 1500 Alamo National Building David M. Stahl, Esquire San Antonio, Texas 78205 Isham, Lincoln & Beale
-1120 Connecticut Avenue, Suite 325 Charles G. Thrash , Jr. , Esqui re Washington, D.C. 20036 E.W. Barnett, Esauire Theodore F. Weiss, Esquire Michael I. Miller, Esquire J. Gregory Copeland, Esquire James A. Carney, Esquire ,
Baker & Botts Sarah Welling, Esauire 3000 One Shell Plaza Martha n. Gibbs, Esquire Houston, Texas 77002 Isham, Lincoln & Beale One First National Plaza R. Gordon Gooch, Esquire Suite 4200 Steven R. Hunsicker, Esquire Chicago, Illinois 60603 Baker 4 Botts 1701 Pennsylvania Avenue Washington, D.C. 20006 e
Don R. Butler, Esquire David A. Dopsovic, Esquire Sneed, Vine, Wilkerson, Selman Frederick H. Parmenter, Esquire
& Perry Susan B. Cyphert, Esquire Post Office Box 1409 Nancy A. Luque, Esquire Austin, Texas 78768 Energy Section Antitrust Division U.S. Department of Justice Mr. William C. Price P.O. Box 14141 Central Power & Light Comoany Washington, D.C. 20044 P.O. Box 2121 Cornus Christi, Texas 78403 Morgan Hunter, Esquire Bill D. St. Clair, Esquire Mr. G. Holman King McGinnis, Lockridge & Kilgore
- West Texas Utilities Company Fifth Floor P.O. Box 841 Texas State Bank Building Abilene, Texas 79604 900 Congress Avenue Austin, Texas 78701 Jerry L. Harris, Esquire Richard C. Balough, Esquire W.S. Robson City of Austin General Manager P.O. Box 1088 South Texas Electric Cooperative, Inc.
Austin, Texas 78767 Route 6, Building 102 Joseph B. Knotts, Jr., Escuire Victoria Regional Airport Victoria, Texas 77901 Nicholas S. Reynolds, Esquire C. Dennis Ahearn, Esquire Robert C. McDiarmid, Esquire Debevoise & Liberman George Spiegel, Esquire 1200 Seventeenth Street, N.W. Robert A. Jablon, Esquire Washington, D.C. 20036 Marc R. Poirier, Esquire Scieac1 & McDiarmid Don H. Davidson 2'600' Virginia Avenue, N.W., Suite 312 City Manager ,
Washington, D.C. 20037 City of Austin P.O. Box 1088 Kevin B. Pratt Austin, Texas 78767 Texas Attorney General's Office P.O. Box 12548 Jay Galt, Esquire Austin, Texas 78711 Looney, Nichols, Johnson & Hays 219 Couch Drive William H. Durchette, Esquire Oklahoma City, Oklahoma 73102 Frederick H. Ritts, Esquire ,
Law Offices of Northcutt Ely Knoland J. Plucknott Watergate 600 Building Executive Director Washington, D.C. 20036 Committee on Power for the South-west, Inc. Tom W. Gregg, Esquire 5541 East Skelly Drive P.O. Box Drawer 1032 Tulsa, Oklahoma 74135 San Angelo, Texas 76902 John W. Davidson, Esauire Leland F. Leatherman, Esquire Sawtell, Goode, Davidson & Tioili McMath, Leatherman & Woods, P.A.
1100 San Antonio Savings Duilding 711 West Third Street San Antonio, Texas 78205 Little Rock, Arkansas 72201 Douglas P. John, Esquire Paul W. Eaton, Jr.,. Esquire McDermott, Will and Emery Hinkle, Cox, Eaton, Coffield & Hensley 1101 Connecticut Avenue, N.W. 600 Henkle Building Suite 1201 P.O. Box 10 Washington, D.C. .20036 Roswell, New Mexico 88201
_3_
Robert M. Rader, Esquire Conner, Moore & Corber 1747 Pennsylvania Avenue, N.W.
Washington, D.C. 20006 W.N. Woolsey, Esquiro Kleberg, Dyer, Redford & Weil 1030 Petroleum Tower Corpus Christ, Texas 78474 Donald M. Clements, Esquire Gulf States Utilities Company P.O. Box 2951 Beaumont, Texas 77704 Dick Terrell Brown, Esquire 800 Milam Building San Antonio, Texas 78205 1
.