Line 46: |
| On this format, list the average daily unit power level in _MWe-NET for each day in the reporting month. | | On this format, list the average daily unit power level in _MWe-NET for each day in the reporting month. |
| Compute to the nearest whole megawatt. | | Compute to the nearest whole megawatt. |
|
| |
| *
| |
| "* .
| |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
Line 56: |
Line 53: |
| DATE 08/05/96 | | DATE 08/05/96 |
| * COMPLETED BY KAKobiata * | | * COMPLETED BY KAKobiata * |
| * TELEPHONE 616-764-2572 | | * TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code* Code5 Action to Dawn Reactor Report# Prevent Recurrence 4 7/1/96 F 130.5 A Unit taken offline to Repair an oil leak on Primary Coolant Pump. |
| * UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code* Code5 Action to Dawn Reactor Report# Prevent Recurrence 4 7/1/96 F 130.5 A Unit taken offline to Repair an oil leak on Primary Coolant Pump.
| |
| : 1. 2 a 4. 5. | | : 1. 2 a 4. 5. |
| F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161) | | F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161) |
| E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | | E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) |
| H-Other (Explain)}} | | H-Other (Explain)}} |
Latest revision as of 10:26, 3 February 2020
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr ML18065B1341997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Palisades Nuclear Plant.W/980106 Ltr ML18065B1041997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Palisades Nuclear Plant.W/971202 Ltr ML18067A7661997-10-31031 October 1997 Revised MOR for Oct 1997 for Palisades Nuclear Plant ML18067A7021997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for PNPP.W/971002 Ltr ML18067A6701997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Palisades Nuclear Plant.W/970903 Ltr ML18067A6551997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Palisades Nuclear Plant.W/970804 Ltr ML18067A6231997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Palisades Nuclear Plant.W/970702 Ltr ML18067A5621997-05-31031 May 1997 Revised Monthly Operating Rept & Summary of Operating Experience for May 1997 for Pnpp ML18067A5251997-04-30030 April 1997 Revised MOR for April 1997 for Pnp ML18067A4741997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Palisades Nuclear Plant.W/970402 Ltr ML18067A4851997-03-31031 March 1997 Revised Monthly Operating Rept for Mar 1997 for Palisades Nuclear Plant ML18066A8981997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant.W/970304 Ltr ML18066A9011997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant.W/970306 Ltr ML18066A8761997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Palisades Nuclear Plant.W/970204 Ltr ML18066A8281996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Palisades Nuclear Plant.W/970114 Ltr ML18065B1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Palisades Nuclear Plant.W/961203 Ltr ML18065B0701996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Palisades Nuclear Plant.W/961104 Ltr ML18065A9471996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Palisades Nuclear Plant.W/961002 Ltr ML20117K1511996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Palisades Nuclear Plant ML18065A8691996-07-31031 July 1996 Operating Data Rept for July 1996 for Palisades ML18065A8561996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Palisades Nuclear Plant.W/960805 Ltr ML18065A8121996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Palisades Nuclear Plant.W/960702 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3781999-01-20020 January 1999 LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18068A4851998-10-29029 October 1998 LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2831998-08-18018 August 1998 LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2261998-06-30030 June 1998 LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A1781998-06-0909 June 1998 LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18068A4701998-05-31031 May 1998 Annual Rept of Changes in ECCS Models Per 10CFR50.46. ML18065B2451998-05-13013 May 1998 LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr 1999-09-30
[Table view] |
Text
consumers
_ Power _
POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27760 Blue Star Memorial Highway, Covert, Ml 49043 August 5, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255, Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July 1996:
- If you have any questions or concerns, please to contact me at (616) 764-2013.
Sincerely,
~ £?Ztf;A AL Williams Reactor' Engineering Supervisor CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission
- Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 /
Region Ill Administrator, USNRC Document Control, 950*22*35*1 OIL Cycle 12 Reports r~--~--t-~-a~1:-:_~=--=g:-::g:-;;~;-;;;~-:--;;67~;\87:;.05;-pt1~-5-___:~-~\
R --
A CMS' ENER6YCOMPANY
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 08/05/96 COMPLETED BY KAKobiata MONTH July TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NIWe Net) (MWe Net)
- 1. 760 17. 747
- 2. 93 18. 744
- 3. 0 19. 750
- 4. 50 20. 767
- 5. 270 21. 769
- 6. 609 22. 767
- 7. 760 23. 764
- 8. 762 24. 759
- 9. 764 25. 760
- 10. 768 26. 760
- 11. 765 27. 763
- 12. 757 28. 761
- 13. 762 29. 757
- 14. 763 30. 758
- 15. 759 31. 761
- 16. - 752 INSTRUCTIONS:
On this format, list the average daily unit power level in _MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR JULY 1996 The Unit began a derate to hot shutdown at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> on July 1 to repair an oil leak on Primary Coolant Pump P-500. On July 2, the Turbine was offline at 0521 hours0.00603 days <br />0.145 hours <br />8.614418e-4 weeks <br />1.982405e-4 months <br /> and subcritical at 1347 hours0.0156 days <br />0.374 hours <br />0.00223 weeks <br />5.125335e-4 months <br />. After repairs were made the Unit was critical at 0408 hours0.00472 days <br />0.113 hours <br />6.746032e-4 weeks <br />1.55244e-4 months <br /> and back online at 1246 on July 4 and reached 99.6% power at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on July 7.
REPORT MONTH JULY 1996 DOCKET NO 50-255 UNIT Palisades~
DATE 08/05/96
- TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code* Code5 Action to Dawn Reactor Report# Prevent Recurrence 4 7/1/96 F 130.5 A Unit taken offline to Repair an oil leak on Primary Coolant Pump.
- 1. 2 a 4. 5.
F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)