ML19085A041: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 48: Line 48:
: 2. List of Attendees cc w/encls.: DC NuScale Power, LLC Listserv
: 2. List of Attendees cc w/encls.: DC NuScale Power, LLC Listserv


ML19085A041                *via e-mail        NRC-002 OFFICE      NRO/DLSE/LB1: PM    NRO/DLSE/LB3: LA      NRO/DNRL/LB1: PM NAME        MVera                SGreen                MVera DATE        3/22/2019            03/26/2019            03/26/2019
ML19085A041                *via e-mail        NRC-002 OFFICE      NRO/DLSE/LB1: PM    NRO/DLSE/LB3: LA      NRO/DNRL/LB1: PM NAME        MVera                SGreen                MVera DATE        3/22/2019            03/26/2019            03/26/2019 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS THE PROGRESS ON EMERGENCY CORE COOLING SYSTEM VALVE TEST PLANS OF THE CERTIFICATION APPLICATION January 23, 2019 11:00 a.m. - 12:00 p.m.
 
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS THE PROGRESS ON EMERGENCY CORE COOLING SYSTEM VALVE TEST PLANS OF THE CERTIFICATION APPLICATION January 23, 2019 11:00 a.m. - 12:00 p.m.
AGENDA Public Meeting 11:00 - 11:15 p.m.        Welcome and Introductions 11:15 - 11:40 p.m.        Technical discussion 11:40 - 11:50 p.m.        Public - Questions and Comments 11:50 - 12:00 p.m.        Closed portion February 13, 2019 11:00 a.m. - 12:00 p.m.
AGENDA Public Meeting 11:00 - 11:15 p.m.        Welcome and Introductions 11:15 - 11:40 p.m.        Technical discussion 11:40 - 11:50 p.m.        Public - Questions and Comments 11:50 - 12:00 p.m.        Closed portion February 13, 2019 11:00 a.m. - 12:00 p.m.
AGENDA Public Meeting 11:00 - 11:15 p.m.        Welcome and Introductions 11:15 - 11:40 p.m.        Technical discussion 11:40 - 11:50 p.m.        Public - Questions and Comments 11:50 - 12:00 p.m.        Closed portion Enclosure 1
AGENDA Public Meeting 11:00 - 11:15 p.m.        Welcome and Introductions 11:15 - 11:40 p.m.        Technical discussion 11:40 - 11:50 p.m.        Public - Questions and Comments 11:50 - 12:00 p.m.        Closed portion Enclosure 1

Latest revision as of 11:36, 2 February 2020

02/13/2019 and 03/06/2019 Summary of Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Progress on Emergency Core Cooling System Valve Test Plans of the Design Certification Application
ML19085A041
Person / Time
Site: NuScale
Issue date: 03/26/2019
From: Amadiz Marieliz Vera
NRC/NRO/DLSE/LB1
To: Samson Lee
NRC/NRO/DLSE/LB1
Vera A
References
Download: ML19085A041 (9)


Text

March 26, 2019 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Marieliz Vera, Project Manager /RA/

Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

SUMMARY

OF THE JANUARY 23, 2019, FEBRUARY 13, 2019, AND MARCH 6, 2019, CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS THE PROGRESS ON EMERGENCY CORE COOLING SYSTEM VALVE TEST PLANS OF THE DESIGN CERTIFICATION APPLICATION The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference on January 23, 2019, February 13, 2019 and March 6, 2019, to discuss the progress on emergency core cooling system (ECCS) valve test Plans of the NuScale Power, LLC (NuScale) Design Certification Application. Participants included personnel from NuScale and members of the public.

The public meeting notice can be found in the Agencywide Documents Access and Management Systems under Accession No. ML19010A397, ML19042A121 and ML19064A798 respectively. This meeting notice was also posted on the NRC public Web site.

The meeting agenda and list of participants can be found in Enclosures 1 and 2, respectively.

CONTACT: Marieliz Vera, NRO/ DLSE 301-415-5861

S. Lee 2 Summary:

On January 23, February 13, and March 6, 2019, the NRC staff held public telephone conferences with NuScale to discuss the plan for design demonstration testing of the NuScale emergency core cooling system (ECCS) valves in support of the NuScale design certification application (DCA). During the January 23 conference, NuScale presented slides describing its plan for the ECCS valve design demonstration testing.

During the open portion of the January 23 telephone conference, NuScale discussed the objectives of the ECCS valve design demonstration testing. These objectives are:

(1) demonstrate main valve functionality at operating temperature and pressure fluid conditions; (2) demonstrate inadvertent actuation block (IAB) valve functionality at operating temperature and pressure fluid conditions; and (3) demonstrate IAB valve and trip line functionality at operating chemistry fluid conditions (boric acid solutions).

During the closed portion of the January 23 telephone conference, NuScale discussed its intent to accomplish each of the objectives of the ECCS valve design demonstration testing. In presenting the slides, NuScale provided additional information in response to questions from the NRC staff. For example, the main valve and IAB valve to be used for the ECCS valve design demonstration testing will be the same valves included as part of the Proof-of-Concept (POC) testing performed in 2015. The most limiting hydraulic tubing arrangement will be applied in the ECCS valve design demonstration testing with 30 feet length of tubing over an elevation of 15 feet from the modeled 2-inch Reactor Recirculation Valve (RRV) to the trip valve. The IAB valve will be installed close to the main valve such that the temperature of the hydraulic fluid in the IAB valve will be similar to the fluid temperature in the main valve control chamber. NuScale will collect test data by continuously monitoring pressure and temperature in various test locations, as well as main valve position, with data time traces. NuScale stated that the main valve actuation time is not an objective for the ECCS valve design demonstration testing. Unlike the plant operating condition, the test pressure reservoir volume is insufficient to ensure the valve opens with the required actuation time. Confirmation that the main valve actuation time requirements are met will be provided by ASME QME-1 qualification testing that will be completed prior to plant operation. NuScale stated that the valve vendor will perform evaluations of the valve stroke times as part of the follow-up to the previous NRC staff audit of the ECCS valve design. During the testing, NuScale will verify that the IAB valve will initially seal at high differential pressure and hold the pressure in the main valve control chamber, and then open at the proper differential pressure to release the pressure in the main valve control chamber to allow the main valve to open. The ECCS valve design demonstration test report will include justification for application of the 2-inch RRV test results to the 5-inch Reactor Vent Valve (RVV) performance.

Follow-up items from the January 23 telephone conference, on the ECCS valve design demonstration testing plan included temperature control for the hydraulic tubing, initial test pressure and boric acid concentration; test quality activities; and specific test schedule.

S. Lee 2 During the February 13 telephone conference, NuScale described the application of quality controls for the ECCS valve design demonstration testing. NuScale discussed preliminary considerations for the hydraulic line temperature control, initial test pressure, and boric acid concentration.

For the March 6 telephone conference, NuScale provided the following information:

1. For the IAB Valve Functional Tests, the test requirements will require 28 ft (out of 30 ft) of the ECCS valve trip line tubing length from the IAB valve to the trip valve outlet to have a minimum temperature of 400°F as an initial condition for the test runs. This will be indicated by temperature instruments along the length of the trip line tubing. This test requirement, along with existing initial temperature requirements for test fluid at the main valve, given in the January 23 presentation, will be representative of plant conditions.
2. For the Boric Acid Effects Tests, the high-pressure test runs which actuate the IAB valve to the blocking position (with subsequent pressure reduction until release opening) will have an initial condition of 1850 pounds per square inch gage.
3. Request for Additional Information 9189 (Question 09.03.04-7) addresses the chemistry of the fluid in the trip lines. The trip lines will experience flushing (from the reset supply) during startup to close the ECCS valves, and subsequent flushing through the reset valve is expected to establish other chemistry requirements. The boric acid concentration during the testing will be 1.2 wt percent minimum to envelope plant chemistry conditions (including refueling concentrations). This corresponds to a boron concentration above the design basis refueling concentration listed in NuScale DCA Part 2, and envelopes the reactor coolant boron concentration for power operations shown in Figure 4.3-17, Boron Letdown Curve for Equilibrium Cycle.
4. The NRC staff may witness ECCS valve testing during the week of June 2, 2019.

During the March 6 telephone conference, the NRC staff stated that NuScale has resolved the follow-up items from the previous discussions regarding the ECCS valve design demonstration testing plan. The staff described its plans to perform an audit of the ECCS valve design demonstration testing to review the test plan and procedures, review the test setup and equipment, monitor the valve testing, and evaluate the test results. NuScale did not identify any concerns with the NRC staff audit plans. By e-mail following the March 6 telephone conference, the staff provided a list of the documents requested to be made available for review as part of the staff audit. The staff is preparing a written audit plan for issuance. During the March 6 telephone conference, NuScale stated that it will determine its preferred method to prepare an update to its DCA regarding boron flushing of the ECCS valve system during refueling outages.

S. Lee 0 Based on its review of the information provided by NuScale and the telephone conference discussions, the NRC staff considers the NuScale plan for the ECCS valve design demonstration testing to be acceptable.

Docket No.52-048

Enclosures:

1. Meeting Agenda
2. List of Attendees cc w/encls.: DC NuScale Power, LLC Listserv

ML19085A041 *via e-mail NRC-002 OFFICE NRO/DLSE/LB1: PM NRO/DLSE/LB3: LA NRO/DNRL/LB1: PM NAME MVera SGreen MVera DATE 3/22/2019 03/26/2019 03/26/2019 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS THE PROGRESS ON EMERGENCY CORE COOLING SYSTEM VALVE TEST PLANS OF THE CERTIFICATION APPLICATION January 23, 2019 11:00 a.m. - 12:00 p.m.

AGENDA Public Meeting 11:00 - 11:15 p.m. Welcome and Introductions 11:15 - 11:40 p.m. Technical discussion 11:40 - 11:50 p.m. Public - Questions and Comments 11:50 - 12:00 p.m. Closed portion February 13, 2019 11:00 a.m. - 12:00 p.m.

AGENDA Public Meeting 11:00 - 11:15 p.m. Welcome and Introductions 11:15 - 11:40 p.m. Technical discussion 11:40 - 11:50 p.m. Public - Questions and Comments 11:50 - 12:00 p.m. Closed portion Enclosure 1

2 March 6, 2019 2:30 p.m. - 3:30 p.m.

AGENDA Public Meeting 2:30 - 2:45 p.m. Welcome and Introductions 2:45 - 3:10 p.m. Technical discussion 3:10 - 3:20 p.m. Public - Questions and Comments 3:20 - 3:30 p.m. Closed portion

U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS THE PROGRESS ON EMERGENCY CORE COOLING SYSTEM VALVE TEST PLANS OF THE CERTIFICATION APPLICATION LIST OF ATTENDEES January 23, 2019 NAME AFFILIATION Marieliz Vera U.S. Nuclear regulatory Commission (NRC)

Thomas Scarbrough NRC Ryan Nolan NRC Paul Prescott NRC Rebecca Karas NRC Shanlai Lu NRC Marty Bryan NuScale Power, LLC (NuScale)

Greg Myers NuScale Dan Lassiter NuScale Scott Harris NuScale Zack Houghton NuScale February 13, 2019 NAME AFFILIATION Marieliz Vera U.S. Nuclear regulatory Commission (NRC)

Thomas Scarbrough NRC Ryan Nolan NRC Paul Prescott NRC Rebecca Karas NRC Shanlai Lu NRC Marty Bryan NuScale Power, LLC (NuScale)

Greg Myers NuScale Dan Lassiter NuScale Scott Harris NuScale Zack Houghton NuScale Enclosure 2

2 March 6, 2019 NAME AFFILIATION Omid Tabatabai U.S. Nuclear regulatory Commission (NRC)

Thomas Scarbrough NRC Shanlai Lu NRC Marty Bryan NuScale Power, LLC (NuScale)

Greg Myers NuScale Dan Lassiter NuScale Scott Harris NuScale Bradyn Wuth NuScale Mike Smith NuScale