ML19340E260: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:._._ m_            _ _ . _    m        . _.m    _____ _ _ _ - . .                      ._..~____m                  _ _ _        m _      _ _ _ _ - - .          . . - _ _ . . _  ___m__              _ .          . _ _ .
NRC FORM J66                                                                                                                                    U. S. NUCLE AR REGUL ATORY COMMISSION i                                                                                          LICENSEE EVENT REPORT
]
CONTROL BLOCK: l l      l      l    l  l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) j lo lil IN l E l F l C l S l 1 l@l 010 l010 lo lo lo 10 lo l0 lo26 l@l4                                                                            26 l1LICEN5E Il 11TD l1  PE JO l@lb 7 L Al 1 t>8l@
j      7      8 9              LICENSEE CODE                  14        15                    LICEN5t NuvutM j      CON'T O i              S$RU LL_j@l 015101010121815                                        68 l@ll 69 1210171810 l@ll 1211171810  14        75        REPORT D ATE                  80 l@
7      8                          60              61                  DOCKET NUVSER                                  EVENT DATE j                  EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h FOTTI I During normal operation. a leak develooed in the weld which cnnnects the demine -                                                                                                                        l I
10131 I              alized water flush line to the discharge manifold of Charoina Pumo CH-1B.                                                                                                    Charoino i                    f
; IOI4II                    oumos CH-1 A and CH-lC were coerable. therefore the reouirements of Technical Soeci- 1 l l0is1 I                    fication 2.2 were met.                                    A similar event is described in LER 78-021.                                                                                      I 4
[T171 1                                                                                                                                                                                                          I
) 10131 1                                                                                                                                                                                                                l i
I I
1 10 l s 1 I                                                                                                                                                                                                    80 7      es SYSTEM                  CAUSE          CAUSE                                                                COYP.              VALV E CODE                    CODE      SUSCODE                      COMPONENT CODE                        SU8 CODE            SUSCODE l0lsl                                  l Pl Cl@ [Lj@ lC l@ l Pl Il Pl El Xl XI@ [Aj@ W @                                                              19                  20 7      8                              9          10              11            12                13                                18 i                                                                                              SEQUE NTI AL                            OCCURRENCE                REPORT                                REVISION EVENT YEAR                                    REPORT NO.                                    CODE                    TYPE                                  N O.
L
:                  @ ,a=E R RO
_ 21 18 10 I 22 l-l 23 10 13 11 I 24                26 Ld 27 10131 28        29 W
JO L-]
31 lo_!
32                            ,
,                  T K N A                ON            C N PL NT              MET                        HOURS            S8 IT              FOR          8.      SUPPL R                      MA F CTURER l3J@lLJ@                                LLJ@                  LLj@            10 10 10 10 I                    Ly_J@            l_nJ@                LAJ@                      Lt  19 19 1947l@
i                    33              34                    35                    36              31                      40      41              42                    43                      44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li10i l            The probable cause of the weld leak was piping vibration. The crack in the weld                                                                                                                I j ii iii I                    was repaired and charging pump CH-1B was returned to service.                                                                                An engineering                                  I l i, ,,i 1                  evaluation is being performed on the problem of vibration of the flushing line                                                                                                                I i,i3i l                (EEAR FC-80-89).                                                                                                                                                                          I I
LuaJ8 9l 7                                                                                                                                                                                                            80 STA S                      % POWER                            OTHER STATUS                  DIS O RY                                  DISCOVERY DESCRIPTION Ii I s l [E_j@ l 017 l 5 l@l                                              NA                          l    W    @l**            Operator Observation                                                            l ACTIVITY          CO# TENT AELE AEED OF HE LEASE                                  AMOUNT OF ACTIVITY                                                                LOCATION OF RELEASE LLLcj Lz_J @ LLJ@l                                        NA                                          l          l          NA 80 I
7    8 9                      to            11                                                  44          45 i                      PERSONNEL E XPOSURES i                      NUV8 E H                      TYPE          DESCRIPTION i i    10 10 10 l@Lz_j@l                                                NA                                                                                                                                  l PERSONNi L i.uu'n'iES                                                                                                                                                                                          l NuveE a                      OtSCn. prion @
I i -                                                              NA                                                                                                                                          l 7      8  9 10 10 10 18I12        11                                                                                                                                                                          80 LOSS OF on DAVAGE TO F ACILITY TYPE            DESCRIPflON i 9    [7_j@l                          NA                                                                                                                                                                    l 7      8 9                  10                                                                                                                                                                                80
                                      '"                                                                                                                                                    NRC USE ONLY                    ,
,          2 o    dl ISSui"@'''Et5CaiPT.ON                  NA                                        7 @ 810106o                                                          l        [[lllllllllllj 7      a 9                  10                                                                                                                                  sa 69                                        80 5 J0hn J. Tesarek                                                pgong:              402-426-4011                                      {
NAYE G{ PREPARER
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 1 Safety Analysis During normal operation, a leak was observed in the weld which con-nects the demineralized water flush line to the discharge manifold of Charging Pump CH-18. Charging pumps CH-1A and CH-1C were operable during the time that CH-1B was recoved from service for repair of the weld, therefore, the requirements of Technical Specification 2.2 were met.
There was no significant radiation exposure to plant personnel or activity released.
1
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 2 Corrective Action M.0. 8098 was initiated to repair the weld which connects the Jemineralized water flush line to the discharge manifold of Charging Pump CH-1B. The weld crack was ground out and the area was rewelded.
The weld was dye penetrant checked and hydrotested. Charging pump CH-1B was then returned to service.
An engineering evaluation is being performed on the problem of vibration of the demineralized water flush line (reference EEAR FC      89).
I i
1 L
 
LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 3 Failure Data A previous related incident is detailed in LER 78-021.
.}}

Revision as of 10:19, 31 January 2020

LER 80-031/03L-0:on 801207,during Normal Operation,Leak Developed in Weld Connecting Demineralized Water Flush Line to Discharge Manifold of Charging Pump.Caused by Probable Piping Vibration.Crack Repaired & Pump Returned to Svc
ML19340E260
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/17/1980
From: Tesarek J
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19340E257 List:
References
LER-80-031-03L, LER-80-31-3L, NUDOCS 8101060769
Download: ML19340E260 (4)


Text

{{#Wiki_filter:._._ m_ _ _ . _ m . _.m _____ _ _ _ - . . ._..~____m _ _ _ m _ _ _ _ _ - - . . . - _ _ . . _ ___m__ _ . . _ _ . NRC FORM J66 U. S. NUCLE AR REGUL ATORY COMMISSION i LICENSEE EVENT REPORT ] CONTROL BLOCK: l l l l l l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) j lo lil IN l E l F l C l S l 1 l@l 010 l010 lo lo lo 10 lo l0 lo26 l@l4 26 l1LICEN5E Il 11TD l1 PE JO l@lb 7 L Al 1 t>8l@ j 7 8 9 LICENSEE CODE 14 15 LICEN5t NuvutM j CON'T O i S$RU LL_j@l 015101010121815 68 l@ll 69 1210171810 l@ll 1211171810 14 75 REPORT D ATE 80 l@ 7 8 60 61 DOCKET NUVSER EVENT DATE j EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h FOTTI I During normal operation. a leak develooed in the weld which cnnnects the demine - l I 10131 I alized water flush line to the discharge manifold of Charoina Pumo CH-1B. Charoino i f

IOI4II oumos CH-1 A and CH-lC were coerable. therefore the reouirements of Technical Soeci- 1 l l0is1 I fication 2.2 were met. A similar event is described in LER 78-021. I 4

[T171 1 I ) 10131 1 l i I I 1 10 l s 1 I 80 7 es SYSTEM CAUSE CAUSE COYP. VALV E CODE CODE SUSCODE COMPONENT CODE SU8 CODE SUSCODE l0lsl l Pl Cl@ [Lj@ lC l@ l Pl Il Pl El Xl XI@ [Aj@ W @ 19 20 7 8 9 10 11 12 13 18 i SEQUE NTI AL OCCURRENCE REPORT REVISION EVENT YEAR REPORT NO. CODE TYPE N O. L

@ ,a=E R RO

_ 21 18 10 I 22 l-l 23 10 13 11 I 24 26 Ld 27 10131 28 29 W JO L-] 31 lo_! 32 , , T K N A ON C N PL NT MET HOURS S8 IT FOR 8. SUPPL R MA F CTURER l3J@lLJ@ LLJ@ LLj@ 10 10 10 10 I Ly_J@ l_nJ@ LAJ@ Lt 19 19 1947l@ i 33 34 35 36 31 40 41 42 43 44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li10i l The probable cause of the weld leak was piping vibration. The crack in the weld I j ii iii I was repaired and charging pump CH-1B was returned to service. An engineering I l i, ,,i 1 evaluation is being performed on the problem of vibration of the flushing line I i,i3i l (EEAR FC-80-89). I I LuaJ8 9l 7 80 STA S  % POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION Ii I s l [E_j@ l 017 l 5 l@l NA l W @l** Operator Observation l ACTIVITY CO# TENT AELE AEED OF HE LEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE LLLcj Lz_J @ LLJ@l NA l l NA 80 I 7 8 9 to 11 44 45 i PERSONNEL E XPOSURES i NUV8 E H TYPE DESCRIPTION i i 10 10 10 l@Lz_j@l NA l PERSONNi L i.uu'n'iES l NuveE a OtSCn. prion @ I i - NA l 7 8 9 10 10 10 18I12 11 80 LOSS OF on DAVAGE TO F ACILITY TYPE DESCRIPflON i 9 [7_j@l NA l 7 8 9 10 80

                                      '"                                                                                                                                                     NRC USE ONLY                    ,

, 2 o dl ISSui"@Et5CaiPT.ON NA 7 @ 810106o l [[lllllllllllj 7 a 9 10 sa 69 80 5 J0hn J. Tesarek pgong: 402-426-4011 { NAYE G{ PREPARER

LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 1 Safety Analysis During normal operation, a leak was observed in the weld which con-nects the demineralized water flush line to the discharge manifold of Charging Pump CH-18. Charging pumps CH-1A and CH-1C were operable during the time that CH-1B was recoved from service for repair of the weld, therefore, the requirements of Technical Specification 2.2 were met. There was no significant radiation exposure to plant personnel or activity released. 1

LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 2 Corrective Action M.0. 8098 was initiated to repair the weld which connects the Jemineralized water flush line to the discharge manifold of Charging Pump CH-1B. The weld crack was ground out and the area was rewelded. The weld was dye penetrant checked and hydrotested. Charging pump CH-1B was then returned to service. An engineering evaluation is being performed on the problem of vibration of the demineralized water flush line (reference EEAR FC 89). I i 1 L

LER No. 80-031 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 Attachment No. 3 Failure Data A previous related incident is detailed in LER 78-021. .}}