LER 90-022-02:on 900907,approx 460 Fire Barrier Penetration seals,60 Fire Dampers & 6 Fire Doors Declared Nonfunctional Per NRC Info Notice 88-004 Due to Lack of Documentation. Plant Outage Required to Implement Repairs/Replacements
ML20029A297
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/06/1991
From: Fritts C
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20029A296 List:
References
IEIN-88-004, IEIN-88-4, LER-90-022, LER-90-22, NUDOCS 9102120021
Download: ML20029A297 (5)


Text

.. - - .

C P AM n. U.S. NUCLE AR KtoutATOJIf COMMi$$lON APPMOV10 OM8 NO 3140tD4 Expents sijcig; N AMA7 ON C L ECT ON A Sf 6 FORWAR

, LICENSEE EVENT REPORT (LER) gM4N,Ts R A,R o agr4M A ,0 0, . $,8 g n!"it,',"Wd?*nf a ** = in* n "'" ' ail'i 08 MANA0tMENT AND OVDGET. WASHINGTON. DC 20603

5EEaIhounStationUnitNo 1 . ;Y;"o";$ , 2,8 is i ho*; 5 fif LE (48 Nonfunctional. Fire-Barrier Penetrations IVtNT Daf t (Si Lt R NUM.t R i.t AtPORY Dd il 171 OTHtR F ACILITIES INVOLVED l.)

DOCKE T NvM.E m 51 MONTH Oay vtAR vtAR "$j$ '" . $$ MONTu Dav vtAR ' Acast i N Awes N o isio t o;o; i i 0l9 0 j7 90 9l0 0l2l2 0l2 0l2 0l6 9 l1 o,sio,o,oi ; ;

iMit REPO81714 SU. MITT 40 PUR8UANT TO TMt RbOU1810 MINTS OF to Cf R I ,Ca.r* ea, es mor, e',a. 8enewvi (111 ope R A TINO "oo' 1 a mi.i a mi.i .o n,.aiai n vii.i g _

n .o. win no

.c umni u ni.nin.i T u u.,

n,n i i n i.inum

.ni.na,

.o nonen...

u ni.n,""'"

1 gT;tgs,.g.g.,Agg n .o.<.in n.o _

u nwiana

_ Spft'ial and no.wnnm .o nNnan.n n .nsn.e n.'

_ _ _ Voluntary Report n mi.in n., so n anen a u ni.nau.i LiCEN885 CONT ACT FOR TMis Ltm Ital NAMI flitPMONE NUMstm AmtACOct Crafg Fritts, System Engineer 40p 1 5i 33 i -i 6l5 i S4 i i COMPLITE ONE LINE FOR S ACH COMPONE NT P AILUDE DESCRI.80 IN THIS fitPO8t f it31 M ' O' "I' '

CAU$$ S Y ST8 M COM*0NfNT MA AC ntP L' C/U$E Sylf tM COM80NENT tO N8 08 O 'P S I I l l' I I I I I I I l 1 1 l 1 I l I I l l I l l I I I

$UMLtMENT'.L REPORT lxPECT40 H4 MONTm 04v vtAR vi$ II, ven soongte,e IK9fCttO $v0se,$$10N OA TE! NO l l l A. TAACT a . , = ~ ,, ,,,e..~ ,,,,, . ,. . W,. . ,,. ,n.,

On September 7, 1990, appr0ximately 460 fire barrier penetration seals, 60 fire dampers and 6 fire doors associated with 25 fire areas were cieclared nonfunctional due to either lack of documentation to qualify non-verifiable penetration critical parameters, or penetration "as built" configurations which did not match typical configurations previously qualified by fire tests. These nonfunctional penetrations were discovered through a special design basis verification walkdown prompted by NRC Information Notice 88-04.

As required by Technical Specifications, the appropriate compensatory measures were implemeated. On November 27, 1990 and on January 2, 1991, additional barrier I penetrations were determined to be nonfunctional and the required compensatory measures were established. The compensatory measures will remain in place until the affected fire barrier penetrations are restored to functional status through engineering evaluation, repair, or replacement.

l l This report is submitted pursuant to Technical Specification 2.19(7) because most of the nonfunctional fire barrier penetrations were not restored to functional status l within 7 days. It is_being submitted also as a Voluntary LER due to, otential

j. regulatory and industry interest.

9102120021 91020S F;DR

  • ADOCK 05000285 PDR NRC f orm M.1649) l t _ . . _ _

8 P44J 3 eta U.S. NUCLEA2 AE0VLATolly CouMit4 TON E APIRES 4/30/92 ilCENSEE EVENT REPORT (LER) ','!s'i',DAug,n"J'!;ogju,'o,0 cf".'# ,*s",'u's

^

. TEXT CONTINUATION i?7474WM=iMf',in'e'#^,'t# '

'v"/ "'E"N 1 P APE RWO RE o TION J 13 o O tt OF MAN &Of MENT AND Sv0GE T.W A$MINGTON. DC 20603 P ACitif V NAMS HI DOCE t Y NVMs t m 12 LIR NuWetR 80s PAGE 131 viaa "t'T.P t- W,9 1 Fort-Calhoun Station Unit No. 1 o ls 10 o j o l2 l 8l5 02 or 0 l5 rw w - N-. N ~~,o .mwac r .ma ,e 9l 0 -

0 j 2 l2 -

0l2 NRC Information Notice 88-04, Inadecuate Qualification and Documentation of Fire Barrier Penetration Seals, requestec utilities to verify the design basis of their fire barrier penetration seals. OmahaPublicPowerDistrict(0 PPD)begana comprehensive walkdown and assessment of all Technical Specification recuired fire barriers in April of 1990. - This walkdown and assessment effort was concucted by contrar: tor personnel under the provisions of OPPD Special Procedures SP-DEN-FP-0001, SP-DEN-FP-0002 and SP-DEN-FP-0003. The scope of the project included fire barrier penetration seals, fire doors, and fire dampers.

The walkdown portion was performed to document the "as built" condition of fire barrier penetration seals, fire doors, and fire dampers. On September 7, 1990 OPPD Systems Engineering and Design Engineering completed the assessment of fire barrier configurations as documented by the Special Procedures. These procedures required that fire barriers penetrations be considered inoperable if no prior documentation of installation was found for critical parameters that could not be field verified, or.if-any "as built" 3enetration barrier did not match a fire-tested and qualified configuration. For t11s screening, each penetration barrier was considered functional if it was considered to meet a minimum 3-hour fire rating. i Based on this assessment, the following fire barrier penetrations associated with 25 fire areas were determined to be nonfunctional:

(1) approximately 460 of 3500 penetration seals, (2) 60 of 79 fire dampers, and (3) 6 of 79 fire doors.

As a result, System Engineering initiated Fire Protection Impairment Permits for all

. areas of the plant where fire aarrier penetrations were considered to be nonfunctional. Compensatory measures required by Technical Specification 2.19(7) for inoperable fire barrier penetrations were established. Revision 0 of this report was submitted as required by the Technical Specification on October 8, 1990

because most of the nonfunctional fire barrier penetrations were not restored to functional status within 7 days. It was submitted also as a Voluntary LER due to potential regulatory and industry interest.

A walkdown assessment of seals determined to be nonfunctional continued concurrent with a Quality Control verification of individual penetration as-built drawings.-

Consequently, additional sealing devices were identified as nonfunctional. On

. November 27, 1990, one additional barrier im)airment permit was issued and the required compensatory measures were establisled. Revision 1 of this report fulfilled the Special Report requirement of the Technical Specification for the additional nonfunctional penetrations identified.

NRCPere 3e6A(6496

g,t.M , A -

u. vCuAu.outAvon Coin,5., ,,,,[,,,,

I Exsiass 4ao/e1 L LICENSEE EVENT REPORT (LER) ,,'g'4'?,o',,vg0,'ci"o"'in*S.',,'o. cf*ft,'

,"c',",'.",'!

TEXT CONTINUATION c f',",y,"r',S'NO ,l& ',M','e'"^,'M ;",' "'Ef!

P APE RWO R E DUCTION J (3500 0 IC 08 MANAGEMENT AND SUDGET n ASHINGTON. DC 20603 kCiklVY eAMG til DOCall NUMSER QI LIR afUMSIR 161 PAGS (31 "Aa "t'Mt' "S*.7:

Fort Calhoun Station Unit No.1 sww-.w mucr,num o is jo lo lo l2 j8 l5 9p _

0j2l2 _

0f 0 l3 or 0 l5 The additional <ssessments added 92 to the total number of ino)erable seals, while another 129 seals previously identified were resolved as opera)1e, resulting in a net decrease of 37 for the total. In addition, the number of fire areas involved was increased from 25 to 26. As of the writing of Revision 1 to this report (submitted December 31,1990), the numbers of nonfunctional fire barrier penetrations were:

(1)~approximately423of3500penetrationseals, (2) 60 of 79 fire dampers, and (3) 7 of 79 f. ire doors. ,

On January 2, 1991, the walkdown inspections were completed. As a result, additional nonfunctional sealing devices were identified and appropriate compensatory measures were verified as im)lemented. This second revision fulfills the Special Report requirement of the Tec1nical Specification for the additional nonfunctional penetrations identified.

The additional assessments added 36 to the total number of inoperable seals, while another 18 seals previously identified were resolved as operable, resulting in a net increase of 18 for the total. An additional nonfunctional fire damper was discovered. As of the writing of this report revision, the numbers of nonfunctional fire barrier penetrations are:

(1) 441 of-approximately 3500 penetration seals, (2) 61 of 79 fire dampers, and (3) 7 of 79 fire doors.

The noted fire barrier penetration sealing devices were declared nonfunctional because no prior documentation existed for them, or their configurations did not match those qualified by fire testing. These criteria were used as a result of-NRC Information Notice 88-04, and were different from the criter-la utilized in performance of periodic fire barrier penetration surv6!11ances as required by TechnicalSpecification3.15(5).

Previous Technical Specification surveillances (the last completed in March of 1990) have verified that fire barrier penetrations were functional (intact) at least once per 18 months by visual ins)ection. When degraded barriers were found in the course of these surveillances, Tec1nical Specification compensatory measures were established until the barriers.were restored to functional status. Therefore, the cause of-the re)ortable nonfunctional status of the fire barrier penetrations was not an actual s1 ort term deterioration of the barriers, but the identification of design basis deficiencies in the construction and/or documentation of the barriers.

I NEC Penn 386A 16491 l

NRC ,;nM 3esA U.S NUCLEA% E80VLATOKY COneMISSION t aDI Rt3 4/20ft2 a

LICENSEE EVENT REPORT (LER) fj@t'#lo',73Ed',"o 'iE*vy,,' ,,C Wl ,T.".'.Q TEXT CONTINUATION 1 *",',",#,",^,"$

o M M ',%1Ed"'/ M ;"' M "f!

M, 0 MAN AGEMENT AND ev0GET. W ASHINGTON. DC NCILITY NAMS (13 DOCKit NUMetR (21 LER NUMetR ter Pact (3n

,,,, snu.~m .. m ~

Fcrt Calhoun Station Unit No. 1 TEXT 17 nwe spece a returest use swoons' N#C #ew JsKs/ LIM 0 15101010l21 815 910 -

012l2 -

012 014 oF 0 l5 As compensatory tetions in com>11ance with Technical Specification 2.19(7), hourly fire watches established 3ased upon verification of operable automatic fire detection on , ast one side of the affected fire barriers. These measures assure c prompt respons, the stetion tire brigade to preclude the spread of fire across any degraded fire, barrier.

As noted in the Fire Hazards Analysis, Fort Calhoun Station overall has low fixed combustible loadings within its different fire areas, with the exception of the diesel rooms and the turbine building. Tho predominant share of inoperable fire barrier penetrations were found in those areas where the total fixed combustible loading is low. In the diesel rooms, additional protection is provided by an automatic dry pipe sprinkler system. The turbine building, which adjoins the auxiliary building, is provided with automatic fire detection and automatic water sup)ression for most areas where combustible loading is high. Transient com]ustibles and hot work activities are controlled by plant administrative procedures. OPPD management personnel are required by Standing Order G-6 to perform regular plant inspections for general housekeeping. An explicit )urpose stated for this inepection is to " reduce to a minimum the amount of combustiale material stored in safe.y related areas."

Many of the fire barrier penetrations determined to be inoperable are related only to licensing commitments made in response to Appendix A to Branch Technical Position 9.5-1. These barriers do not correspond to those committed to under the Fort Calhoun Station 10CFR 50, Ap)endix R analysis, and thus are not required to preserve safe shutdown-capability. T1ese barriers do not separate redundant trains of safe shutdown equipment and, therefore, the postulated breach of these barriers by a fire would have minimal safety impact.

The results of the fire barrier walkdown and assessment effort have been handled conservatively. As immediate corrective action, applicable technical specification LC0 action statements were implemented for all fire barrier penetrations ::onsidered nonfunctional (inoperable). These measures will remain in place until the affected penetrations are restored to a functional (operable) status.

It is estimated that approximately 35 percent of the penetrations can be evaluated as functional. Guidance given in NRC Generic Letter 86-10 allows for evaluations to be performed for penetrations not sealed to the fire rating required of the boundaries. The purpose of the evaluation is to determine whether the fire area a boundaries are sufficient to withstand the hazards associated with the fire area.

. Some barrier penetrations may be evaluated as justifiable in their current configuration. This work is on-going through 1991. Restoration of these penetrations to operable status through engineering evaluation is expected to be fully complete within 2 months following the end of the 1991 "efueling outage.

l NRC 9enn 38.A (6496 -

I

l ~

hag Fpans 3e6 ) U S NUCLt.h ktGVL.70QV COMMIC4tDN ,

' l kflRIl 4'30'92 LICENSEE EVENT REPORT (LERI 7,',1!?c',MO.%*'!!?21'it'

,. Jf"'A' ."n'.".'J$

TEXT CONTINUATION  !*f.',c',,';!','Mailf3'.t1"e',*',"L?' *'Hi" f!

M u .cioi~

s o,it.~t.'A".74?,".,*w'J.fb",'.!.:.!T.

m it h .w,3%W# 0?,'d o ~ e,c - >

,me,6.,,..; n, coc. n =v=. . a,

...,v...,., ...a,

,,,,, .o..~,.. ..w Fort Calhoun Station No. 1 "* " "

  • nn - . . ~ .e, .w.

ol6!clolol218l5l910 -

0l212 -

0 12 0 (5 or 0l5 The approximately 65 percent of installed fire barrier penetrations which cannot be evaluated as functional will be repaired or replaced. A modification has been initiated to perform this work. Implementationofthismodif(icationwillMR-FC-90-072) be on-going through 1991. Because certain nonfunctional penetration sealing devices are inaccessible due to plant radiological conditions and energized electrical equipment, a plant outage will be required to implement required repairs or replacements. For this reason. the modification is expected to be completed within 2 months following the end of the 1991 refueling outage.

The u)' grade of procedural controls and fire barrier as-built drawing information will )e completed concurrent with the engineering evaluations and modification iniplementation discussed above. Drawings reflecting as-built configurations for repaired or replaced penetration sealing devices will be processed as part of the modification closeout. Upgrades planned for existing procedures with respect to fire barrier configuration control will be implemented separately but concurrently

, with the activities described above.

Other 5)ecial Re) orts have been submitted because of non-related instances of inopera)1e fire Jarriers; howeveri thera have been no Special Reports or LERs submitted due to a generic cause affecting many barriers.

NaC Pero se6A 5649:

, _ _ _ _ . .