LER 81-008/03L-0:on 810813,86B/CRHS (Containment Radiation High Signal) Lockout Relay Failed to Actuate When RM-062 Was Placed in Alarm,Resulting in Failure of 86B1/CRHS Relay to Actuate.Caused by Dirt in Relay Latching Mechanism
ML20010H858
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/27/1981
From: Mueller R
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20010H854 List:
References
LER-81-008-03L, LER-81-8-3L, NUDOCS 8109290361
Download: ML20010H858 (4)


Text

_

NRC f OitM S4S U. S. NUCLEAR REGULATORY CCMMISSION (7-7 7 ) .' '

LICENSEE EVENT REPORT cabinoL ctom [_lj l l I

@ (PLE ASE PRINT on YYPE ALL HEOUIRED INFORMATioN) lo I j lN iE ~ F ! C ! S J l l@l 0 l0 l 0 l 0 [0 l0 {0,10 l0 l0 l0 l

) i t i;2 W et) ., 14 I 'a LILE M i, W W L:4 is@lb4l1l1l1l1l@l61 L Alj@

~

. LICENSE IN PE 20 sW CCYT lclil Z l L '@l 0 l 5 l 0 10 l0 12 18 15 l@l0 l8 11 13 18 11_j@[0 18 12 17 18 l1dol@

' 4 t4 tf C,0CK ET N UMB E a d W EVENT O ' TE 74 75 REPOHT D ATE EVET DE3CRIP TlON AND PROS A8LE CONSEQUENCES h l o 121 [Rith lh.e_ reactor operating at appgrox. 95% cower. engine.ered saf.eguards_e.quipment re- 1

. [n ;;; Qating to RM-062 was tested for proper operation prior to a gas release. Subsequently,j l o j ., ; lthe 86B/CRHS (Containme-t Radiation High Signal) lockout relay failed to actuate when j

[o;3; ;RM-062 was placed in " alarm". This also resulted in a failure of the derived signal l

o gg ; g lockout 86Bl/CRHS relay to actuate. The redundant channels relay, 86A/CRHS and 86Al/ l 1ol3l lCRHS were operable and did actuate at the time of the 86B/CRHS failure. l
L ' " ] !

SYSTEM CAUSE CAUSE COMP. VALVE

[

NCE COOE EU8CCDE CO*.'PONENT CODE SUSCODE SUBCODE

%T! lS lH j@ {@ lB l @ l R l E l L l A l Y l X l@ { @ [Z j @

' '1 13 11 12 13 18 19  ;

  1. EQUEN TI AL OCCURRENCE HEPORT REVISION ga qq E HEPOR T NO. COOE TYPE N O.

O y.g _'1 lV8111E N T v l-l 22 23 E A R l0l018l 24 su I/l 27 10 l 3 l

% 29

[L_]

30 l--J 31

[0_j 0

32 A;T!ON n t j r' : H E EWECT SHt JT C OV;N A TT ACHM E N T NPR O.4 PRIME CO*.tP. COuPONENT Tv4N / C T'ON ON PL ANT

  • tE THCO

. HOURS 4 SU B Yl T T E D FORMduB. SUPP L' E R MANUFACTURER LB_!@i xl@ l Z l@ l Z i@ l01010101 31 LyJ@

41 I N Ih l A lh l44G l 0 l8 l047l@

23 il 3t> 40 42 43 CAU5E DESCRIPTION Am.v CORRECTIVE ACTION 5 h

!3 ; o j lThe relay latching mechanism was found to be bound due to dirs 2se. The coil 1 13 l3j l latching mechanism was c.eaned and lubricated. Subsequently, the relay was tested j i, i ;, i lseveral times and proved to be operating satisfactorily in all cases. I I

l'i lI I

l i l 41 1

/ 3 80 F M.il lT V >' UE TilO3 OF STATU3 TPG/ER OTHE R ST ATUS DISCOVERY D'%OVERY DESChlPTION l1 l9l [Jd h l0l 9I5lh!

i d '3 13 12 11 NA 44 l [B_)hl 45 46 Pre-ource testinc 80 ACitVITY CONTENT AELEACF OF RE LT ASE AY^~ UT OF ACTIVf TY

LOCATION OF RELE ASE lilol lZj @D Lzj@l NA } L_

W2 NA 60 l

1 5 9 in 11 44 PE HSONNEL f XPOSUHES Nt asqr st TVPF Uf 0CHIFTIO*s A i 1 j 7 l l 0 l 0 l 0 l@l Z h)) NA l 1 ') 11 11 13 30 Pi: SONNE l. IN n;HI E S -

Pd ;',*R [ f 4 DE:3'.H L J I t ON "

~

i l i 101010 3 'l l@l t 17 NA 80 I

i O'.5 OF OH D At* A r,E 10 F Af s t i T V ,-

r ve r. u SC,aPfioN l

i i l 9] x '3 l Z lhl io NA 80 puntiCITY NRC USE ONLY

  • issued DESCHiPTION ~ ,

! 2 l ol l N IMI NA _ l lllllll!lllIl}

i s @109290361 810911 68 e 80 5 DRADOCK05000@ Randy Mueller pgoyg; 402-426-4011 E,

. s

. LER 81-008 Omaha Public Power District Fort Calhoua Station Unit No. 1 Docket No. 05000285 ATTACHMENT NO. 1 cafety Analysis The Fort Calhoun Station Unit No. 1 Engineered Safeguard Features are designed such that no single failure can prevent Engineered Safe-guard equipment from performing designed safety functions. During the time of the failure of the 86B/CRHS lockout relay, the redundant channel 86A/CRHS lockout relay (and its associated derived signal relay, 86Al/CHRS) was operabic and fully capable of performing the necessary functions to safely mitigate an accident.

The 86A/CRHS and 8/B/CRHS lockout relays are tested each month per Surveillance Test ST-RM-2 and prior to all contaittent gas releases.

3 Since these relays are tested on a regular basis, with few resultant i

relay failures, further maintenance and/or testing of these relays is not warrantsl at this time.

i 4

I e

D i

9 4

4

~ .

4 . s

. LER 81-008 Omaha Public Power District Fort Calhoun Station Unit No. 1 Docket No. 05000285 ATTAC10 TENT NO. 2 Corrective Action Upon testing the Radiation Monitor RM-062'"high alarm trip" and the .

corresponding 86B/CRHS lockout relay, the relay failed to trip-properly.

The operators immediately placed the Ventilation Isolation Actuation System (VIAS) actuation circuitry into f.ts accident 4 position. M.0.

  1. 11182 was written to investigate the problem. Corrective action in-volved the cleaning and lubricating of the rollers and brass bushings of the 86B/CRHS coil trip mechanism. The relay was then retested several times a I operated satisfactorily each time.

I J

e 4

0 1

a

f

. *e.

LER 81-008 Omaha Public Power District Fort Calhoun Station Ur.it No. 1 Decket No. 05000285 ATTACllMENT NO. 3 Failure Data This is the third failure involving CRilS lockout relays at the Fort

. Calhoun Station Unit No. 1. The first and second failures correspond to LER's78-015 and 79-022, respectively, i