LER 82-002/03L-0:on 820114,at 99% Power,Lockout Relay 86B1, Containment Radiation High Signal,Failed to Actuate on Demand by Plant Radiation Monitoring Sys.Caused by Burnt Coil on Lockout Relay.Coil Replaced & Tested Satisfactorily
ML20041B105
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/28/1982
From: Mueller R
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20041B093 List:
References
LER-82-002-03L, LER-82-2-3L, NUDOCS 8202230277
Download: ML20041B105 (4)


Text

NRC FORM 36G U. S. NUCLEAR REGULATORY COMMISSION

.(747) *. O LICENSEE EVEf4T REPORT CONTROL BLOCK: l l l l l l l (PLEASE PRINT On TYPE ALL REQUIRED INFORMATION) 1 6

'lo l 1J l 9l N l E l F l C l S l 141l@l15 0 l 0 l O l 0 LICENSE LICENSEE CODE l 0 l 0NUMuiH l 0 l 0 l 0 l 0 l 026i@l264 l 1LICENSE l 1 l 1TYPE l l 1JOl@l b7 CAT 68 l@

CON'T f5l1l " "

S[nc[lL l@l061 15 l0 DOCKET l0 }0NUMGER l2 l8 l5 l@l 0 69l 1 l 1 l 4 l 8 l 2 l@l 075 l 1 REPORT l 2 l 8DATE l 8 l 280l@

7 3 t>J 68 EVENT DATE 74 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

[TTI] l During power operations at approximately 99% power, lockout relay 86Bl/CRHS (Contain- l gja; j ment Radiation High Signal) failed to actuate on demand by the plant radiation l l n ) ., ; l monitoring system. This resulted in the failure of one of the Engineered Safety l jo;3; ; Feature channels to operate. However, during the inci.. ant all redundant CRHS lockout l lO ls l l relays (86/./CRHS, 86Al/CRHS and 86B/CRHS) functioned as designed and initiated ap- l 10171 l propriate safeguards equipment as required. [

] O l ?t l j  !

SYSTEM CAUSE CAUSE COMP. VALVE FCOE CODE SUSCUDE COMPONENT CODE SUBCODE SUBCODE l0l9) 8 lS l Fl@ W@ l A l@ lR lE lL l A lY lX l@ y@ W @

9 10 12 13 18 20 7 11 19 SEQUENTIAL OCCURRENCE REPORT REVISION LE R RO E REPORT NO. CODE TYPE N O.

@ng JI VENT YE8AR l 8l2l 22 - 23 l0 l0 l2 l 24 26 l/l 27 l0 l3 l 28 29

[L l 30 l-l 31

{

32 AKEr ACTO CN PL NT MET HOURS S B IT 0 FOf bub. S PPL R MANUFACTURER lAl@[X_j@

33 44 lZl@

Ja lZl@

36 l 010 l 0 l 0 l 3/ 40

[Lj@

41 lN 42 l@ W@ lG l0 l8 l0 l@

43 44 47 CAUSE DESCRIPTION AND CCRRECTIVE ACTIONS h 1 O lThe coil of the 86B1/CRHS lockout relay was noticed to have been burnt and thereby I Iilil l"open-circuited". The coil was immediate1v reolaced ner Maintonnnce Order #13MO. I IiI71 1In addition, the relay coil latching mechanism was cleaned, lubricated and checked forl Ii1:1i lproper alignment. The relay was subsequentic satisfactorily tested for onerability l I1 14Il via surveillance test ST-RM-2 (F.2) and returned to service. l

, 8 3 80 STA S "6 pCWER OTHE R STATUS IS O RY DISCOVERY DESCRIPTION li 151 LEj@_ l 0 l 919 l@l NA l [B_j@l Operator Observation l ACTIVITY COr TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA NA I Ii 108 L1J 7 9

@ LZJ@l 10 11 44 I I 45 80 PER*.O*:' DEL EM OSUitES NUMt3 E ft TYPF DESCRIPTION li lil 10101 Oj@l Zl@l NA l

" ' ,ERSOnNE

L ,mu'JiES -

  • NuveER nESCmPTiON@

.li lx 8l 9l 0l 0 l 0lhl

/ 11 12 NA 80 l

LOSS OF OR CAYAGE TO FACILITY TYPE DE SCRIP TION W [Zj@l' NA l

" ' 80 7-8202230277 820212 NRC USE ONLY 2 o ishsuE l @OESCmPriON@ NA S PDR ADOCK 05000g l llllllllll llli i 8 9 to 68 69 80 3

~

NAME OF PREPARER PHONE:

LER No.82-002 Omaha Public. Power District Fort Calhoun Station Unit No. 1

. Docket No. 05000285 Attachment No. 1 Safety Analysis The Fort Calhoun Station Unit No. 1 Engineered Safety Features are designed such that no single failure can prevent Engineered Safeguards equipment from performing designed safety functions. During the failure of the 86Bl/CRHS lockout relay, the redundant channel "A" relay - 86A/

CRHS, and the derived signal lockout relay - 86Al/CRHS, as well as the primary channel "B" lockout relay - 86B/CRHS, were all operable and fully capable of performing the necessary functions to safely mitigate an accident.

The CRHS lockout relays are tested each month per Surveillance Test ST-RM-2 and prior to all gas releases. Since these relays are tested on a regular basis, with relatively few resultant relay failures, further maintenance and/or testing of these relays is not warranted at this

, time.

I

. .. 2 LER No.82-002

- Omaha Public Power District

-Fort-Calhoun Station Unit No. 1 Docket No. 05000285 Attachment No. 2 Corrective Action During the failure of the 86Bl/CRHS lockout relay, the operators immediately-reviewed the engineered safeguards CRHS (Containment Radiation High Signal) and VIAS (Ventilation Isolation Actuation Signal) circuitry

~

and associated equipment to ensure it was in its " conservative" or accident-position. Maintenance Order No. 13650 was written to changen

- theLburnt relay coil and perform other- slight maintenarce, such as:

cleaning and lubricating the rollers and brass bushing of the 86Bl/CRHS lockout relay coil trip mechanisms and ensuring proper alignment.of the coil trip mechanism. The relay was returned to service after several satisfactory test operations.

l

g,.

LER No.82-002

Omaha Public Power District Fort. Calhoun Station Unit No.1 Docket No. 05000285' Attachment No. 3 Failure Data This is the fifth failure involving CRHS lockout relays at the Fort Calhoun Station Unit No.1. The previous failures being reported per LER's81-008, 79-022,78-004 and 77-026. However, additional Engineered Safeguards lockout relay failures are reported 'per LER's80-022, 78-035,

~

78-015,77-022 and Abnormal Occurrences 74B-1, 74-18 and 75-3.

s