{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)SSION NBR:9007240055 DOC.DATE: 90/07/16 NOTARIZED:
DISTRIBUTION
NO DOCKET II CIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HARRIS,K.M.
DEMONSTRATION
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM REGULATORY
 
INFORMATION
==SUBJECT:==
DISTRIBUTION
Responds to commitment for hydrogen recombiners,per Insp Repts 50-250/90-13
SYSTEM (RIDS)SSION NBR:9007240055
DOC.DATE: 90/07/16 NOTARIZED:
NO DOCKET II CIL:50-250
Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION
HARRIS,K.M.
Florida Power&Light Co.RECIP.NAME
RECIPIENT AFFILIATION
Document Control Branch (Document Control Desk)SUBJECT: Responds to commitment
for hydrogen recombiners,per
Insp Repts 50-250/90-13
&50-251/90-13.
&50-251/90-13.
DISTRIBUTION
DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD, AEOD/TPAD NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR SE2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/I LRB12 OE G FILE 02 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
CODE: IEOID COPIES RECEIVED:LTR
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!AL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL  
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
 
of Vio ation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD, AEOD/TPAD NRR MORISSEAU,D
P.O.Box14000, Juno Beach, FL 33408.0420 JUL 16 1990 L-90-263 10 CFR 50.44 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
NRR/DLPQ/LPEB10
Re: Turkey Point Units 3 and 4 Docket No.50-250 and 50-251 Response to NRC Inspection Report Number 50-250/251-90-13 Regarding Licensees Commitment For Hydrogen Recombiners On May 18, 1990, Florida;*Power and Light, during a meeting with the NRC concerning NRC Inspection 50-250/251-90-13, agreed to provide the NRC with information concerning Turkey Point,'s implementation of 10 CFR 50.44"Standards For Combustible Gas Control System in Light-Water-cooled power reactors," and NUREG 0737r item II.E.4.1,"Dedicated Hydrogen Penetrations".
NRR/DREP/PEPB9D
This commitment was included as unresolved item 250, 251/90-13-01 of NRC Inspection Report 50-250/251 13 dated June 15, 1990.NUREG 0737, Item II.E.4.1, requires licensees to provide containment penetration systems for external recombiner or purge systems that are dedicated to that service only and that meet the redundancy,,and single failure requirements of General.Design Criteria 54 and 56 of Appendix A to 10 CFR 50.The penetrations must be sized to satisfy the flow requirements of the recombiner or purge system.Turkey Point Units 3 and 4 have redundant purge connections which are independent of the large containment penetrations.
NRR/DST/DIR
SE2 NUDOCS-ABSTRACT
OGC/HDS2 RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB
DEDRO NRR SHANKMAN,S
NRR/DOEA DIR 11 NRR/DRIS/DIR
NRR/PMAS/I
LRB12 OE G FILE 02 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!AL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL  
P.O.Box14000, Juno Beach, FL 33408.0420
JUL 16 1990 L-90-263 10 CFR 50.44 U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket No.50-250 and 50-251 Response to NRC Inspection
Report Number 50-250/251-90-13
Regarding Licensees Commitment
For Hydrogen Recombiners
On May 18, 1990, Florida;*Power
and Light, during a meeting with the NRC concerning
NRC Inspection
50-250/251-90-13, agreed to provide the NRC with information
concerning
Turkey Point,'s implementation
of 10 CFR 50.44"Standards
For Combustible
Gas Control System in Light-Water-cooled
power reactors," and NUREG 0737r item II.E.4.1,"Dedicated
Hydrogen Penetrations".
This commitment
was included as unresolved
item 250, 251/90-13-01
of NRC Inspection
Report 50-250/251-90-
13 dated June 15, 1990.NUREG 0737, Item II.E.4.1, requires licensees to provide containment
penetration
systems for external recombiner
or purge systems that are dedicated to that service only and that meet the redundancy,,and
single failure requirements
of General.Design Criteria 54 and 56 of Appendix A to 10 CFR 50.The penetrations
must be sized to satisfy the flow requirements
of the recombiner
or purge system.Turkey Point Units 3 and 4 have redundant purge connections
which are independent
of the large containment
penetrations.
By letter L-80-16, dated January 11, 1980, FPL compared this design.to the design criteria specified in NUREG 0578, item 215.a (TMI Item II.E.4.1).
By letter L-80-16, dated January 11, 1980, FPL compared this design.to the design criteria specified in NUREG 0578, item 215.a (TMI Item II.E.4.1).
At that time, Turkey Point did not employ hydrogen recombiners.
At that time, Turkey Point did not employ hydrogen recombiners.
+<el//o On April 17, 1980, Schweaner (NRC)to Uhrig (FPL), the NRC provided its safety evaluation (SE)accepting Turkey Point~~~~plant's actions taken to satisfy the TMI lessons learned category"A" items.As stated in the NRC SE, FPL agreed to 90072400.900716 F'DR ADOCK 05000250 tJ PDC an FPL Group company  
+<el//o On April 17, 1980, Schweaner (NRC)to Uhrig (FPL), the NRC provided its safety evaluation (SE)accepting Turkey Point~~~~plant's actions taken to satisfy the TMI lessons learned category"A" items.As stated in the NRC SE, FPL agreed to 90072400.900716 F'DR ADOCK 05000250 tJ PDC an FPL Group company  
 
re-evaluate
re-evaluate the flow requirements of the hydrogen purge system for a, post-accident situation.
the flow requirements
Per Inspection reports 50-250/251-81-10, dated June 18, 1981, the NRC closed TMI item II.E.4.1 (NUREG 0578, item 2.1.5.a)for Turkey Point Units 3 and 4, as well as the open item from the NRC's April 7, 1980 SE, based on the design of the Turkey Point Post-Accident Containment Vent System.On December 2, 1981, 10 CFR 50.44 was amended to require plants that do not have recombiners to have the capability to install external recombiners.'ollowing review of the amended rule, Turkey Point elected to install piping and electrical service for the installation of an external hydrogen recombiner in accordance with 10 CFR 50.44.As stated in the NRC Inspection Report 50-250/251-90-13, Turkey Point developed an off-normal procedure providing instructions on how to obtain a hydrogen recombiner if the need arises.Previously, Turkey Point had obtained an agreement with other utilities for the use of an external recombiner.
of the hydrogen purge system for a, post-accident
Turkey Point is now actively evaluating a reactivation of this agreement and a possible similar agreement with a different utility group.When this agreement is completed, the hydrogen recombiner will be brought on site to verify system operability.
situation.
Should you have any questions on this information, please contact us.Very truly yours, arz'is Vic President Tur y Point Plant Nuclear KNH/DPS/ds cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant r}}
Per Inspection
reports 50-250/251-81-10, dated June 18, 1981, the NRC closed TMI item II.E.4.1 (NUREG 0578, item 2.1.5.a)for Turkey Point Units 3 and 4, as well as the open item from the NRC's April 7, 1980 SE, based on the design of the Turkey Point Post-Accident
Containment
Vent System.On December 2, 1981, 10 CFR 50.44 was amended to require plants that do not have recombiners
to have the capability
to install external recombiners.'ollowing
review of the amended rule, Turkey Point elected to install piping and electrical
service for the installation
of an external hydrogen recombiner
in accordance
with 10 CFR 50.44.As stated in the NRC Inspection
Report 50-250/251-90-13, Turkey Point developed an off-normal
procedure providing instructions
on how to obtain a hydrogen recombiner
if the need arises.Previously, Turkey Point had obtained an agreement with other utilities for the use of an external recombiner.
Turkey Point is now actively evaluating
a reactivation
of this agreement and a possible similar agreement with a different utility group.When this agreement is completed, the hydrogen recombiner
will be brought on site to verify system operability.
Should you have any questions on this information, please contact us.Very truly yours, arz'is Vic President Tur y Point Plant Nuclear KNH/DPS/ds
cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant  
r
}}

Revision as of 06:23, 17 August 2019

Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated
ML17348A415
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/16/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.1, TASK-TM L-90-263, NUDOCS 9007240055
Download: ML17348A415 (6)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)SSION NBR:9007240055 DOC.DATE: 90/07/16 NOTARIZED:

NO DOCKET II CIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HARRIS,K.M.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to commitment for hydrogen recombiners,per Insp Repts 50-250/90-13

&50-251/90-13.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD, AEOD/TPAD NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR SE2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/I LRB12 OE G FILE 02 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!AL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL

P.O.Box14000, Juno Beach, FL 33408.0420 JUL 16 1990 L-90-263 10 CFR 50.44 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket No.50-250 and 50-251 Response to NRC Inspection Report Number 50-250/251-90-13 Regarding Licensees Commitment For Hydrogen Recombiners On May 18, 1990, Florida;*Power and Light, during a meeting with the NRC concerning NRC Inspection 50-250/251-90-13, agreed to provide the NRC with information concerning Turkey Point,'s implementation of 10 CFR 50.44"Standards For Combustible Gas Control System in Light-Water-cooled power reactors," and NUREG 0737r item II.E.4.1,"Dedicated Hydrogen Penetrations".

This commitment was included as unresolved item 250, 251/90-13-01 of NRC Inspection Report 50-250/251 13 dated June 15, 1990.NUREG 0737, Item II.E.4.1, requires licensees to provide containment penetration systems for external recombiner or purge systems that are dedicated to that service only and that meet the redundancy,,and single failure requirements of General.Design Criteria 54 and 56 of Appendix A to 10 CFR 50.The penetrations must be sized to satisfy the flow requirements of the recombiner or purge system.Turkey Point Units 3 and 4 have redundant purge connections which are independent of the large containment penetrations.

By letter L-80-16, dated January 11, 1980, FPL compared this design.to the design criteria specified in NUREG 0578, item 215.a (TMI Item II.E.4.1).

At that time, Turkey Point did not employ hydrogen recombiners.

+<el//o On April 17, 1980, Schweaner (NRC)to Uhrig (FPL), the NRC provided its safety evaluation (SE)accepting Turkey Point~~~~plant's actions taken to satisfy the TMI lessons learned category"A" items.As stated in the NRC SE, FPL agreed to 90072400.900716 F'DR ADOCK 05000250 tJ PDC an FPL Group company

re-evaluate the flow requirements of the hydrogen purge system for a, post-accident situation.

Per Inspection reports 50-250/251-81-10, dated June 18, 1981, the NRC closed TMI item II.E.4.1 (NUREG 0578, item 2.1.5.a)for Turkey Point Units 3 and 4, as well as the open item from the NRC's April 7, 1980 SE, based on the design of the Turkey Point Post-Accident Containment Vent System.On December 2, 1981, 10 CFR 50.44 was amended to require plants that do not have recombiners to have the capability to install external recombiners.'ollowing review of the amended rule, Turkey Point elected to install piping and electrical service for the installation of an external hydrogen recombiner in accordance with 10 CFR 50.44.As stated in the NRC Inspection Report 50-250/251-90-13, Turkey Point developed an off-normal procedure providing instructions on how to obtain a hydrogen recombiner if the need arises.Previously, Turkey Point had obtained an agreement with other utilities for the use of an external recombiner.

Turkey Point is now actively evaluating a reactivation of this agreement and a possible similar agreement with a different utility group.When this agreement is completed, the hydrogen recombiner will be brought on site to verify system operability.

Should you have any questions on this information, please contact us.Very truly yours, arz'is Vic President Tur y Point Plant Nuclear KNH/DPS/ds cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant r