{{#Wiki_filter:June 16, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 June 16, 2015 EA-14-12 9 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION
; NRC SUPPLEMENTAL INSPECTION REPORT 05000 346/201 5 40 4 AND ASSESSMENT FOLLOW-UP LETTER
; NRC SUPPLEMENTAL INSPECTION REPORT 05000 346/201 5 40 4 AND ASSESSMENT FOLLOW-UP LETTER



Revision as of 12:13, 14 July 2019

IR 05000346/2015404; 05/04/2015 - 05/21/2015; Davis-Besse Nuclear Power Station; Supplemental Inspection - Inspection Procedure (IP) 95001. (Cover Letter Only)
ML15167A526
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/16/2015
From: O'Brien K
Division of Reactor Safety III
To: Lieb R
FirstEnergy Nuclear Operating Co
References
EA-14-129 IR 2015404
Download: ML15167A526 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 June 16, 2015 EA-14-12 9 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION

NRC SUPPLEMENTAL INSPECTION REPORT 05000 346/201 5 40 4 AND ASSESSMENT FOLLOW-UP LETTER

Dear Mr. Lieb:

On May 21, 201 5, the U.S. Nuclear Regulatory Commission (NRC) staff completed a supplemental inspection

, at your Davis-Besse Nuclear Power Station

. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting

, on May 21, 2015, with Mr. D. Saltz and other members of your staff. During this meeting, Messrs. S. Orth and J. Maynen discussed the associated performance deficiency and corrective actions with your staff, which fulfills NRC policy for a regulatory performance meeting.

In accordance with the NRC Reactor Oversight Process (ROP) Action Matrix, this supplemental inspection was performed to follow-up on a performance issue that was identified in the third quarter of 201 4. The issue was previously documented and assessed in NRC Inspection Report (IR) 05000 346/201 4 406 and NRC letter dated October 2 2, 2014. The NRC was informed of your readiness for the inspection on March 20 , 201 5. The objectives of this supplemental inspection were to determine whether or not: (1) the root causes and contributing causes for the significant issues were understood; (2) the extent of condition and the extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.

After reviewing Davis-Besse Nuclear Power Station performance in addressing the Greater-Than-Green finding that was the subject of this inspection, the NRC concluded that your actions met the objectives. Therefore, in accordance with the guidance in Inspection Manual Chapter 0305 , "Operating Reactor Assessment Program," the Greater-Than-Green finding will only be considered in assessing plant performance for a total of four quarters.

As a result, the NRC determined the performance at Davis-Besse Nuclear Power Station will be in the Licensee Response Column of the ROP Action Matrix as of the start of the third quarter of 2015

. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA Mohammed Shuaibi Acting for/

Kenneth G. O'Brien , Director Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure

IR 05000 346/201 5 40 4; w/Attachment: Supplemental Information cc w/encl:

N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR IR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV M. Bear, State Liaison Officer, Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA Mohammed Shuaibi Acting for/

Kenneth G. O'Brien, Director Division of Reactor Safety Docket No.

50-346 License No. NPF-3 Nonpublic Enclosure: IR 05000346/2015404; w/Attachment: Supplemental Information cc w/encl:

N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR IR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV M. Bear, State Liaison Officer, Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV DISTRIBUTION w/o encl

See next page ADAMS Accession Number ML15167A526 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JMaynen:jw JMaynen for DFunk SOrth RSkokowski DATE 06/05/15 06/12/15 06/16/15 06/16/15 OFFICE RIII RIII RIII RIII NAME MShuaibi for KO'Brien DATE 06/16/15 OFFICIAL RECORD COPY Letter to Mr. Raymond Lieb from Mr. Kenneth G. O'Brien dated June 16, 2015 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION
NRC SUPPLEMENTAL INSPECTION REPORT 05000346/2015404 AND ASSESSMENT FOLLOW-UP LETTER DISTRIBUTION w/o encl Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ROPassessment.Resource@nrc.gov