ML080920844: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/01/2008
| issue date = 04/01/2008
| title = 04/17/2008 Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
| title = 04/17/2008 Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
| author name = Powell R J
| author name = Powell R
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000336, 05000423
| docket = 05000336, 05000423
| license number =  
| license number =  
| contact person = Powell R J, RI/DRP/610-337-6967
| contact person = Powell R, RI/DRP/610-337-6967
| case reference number = MN 08-016
| case reference number = MN 08-016
| document type = Meeting Agenda, Meeting Notice
| document type = Meeting Agenda, Meeting Notice

Revision as of 14:05, 12 July 2019

04/17/2008 Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
ML080920844
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/01/2008
From: Racquel Powell
NRC Region 1
To:
Powell R, RI/DRP/610-337-6967
References
MN 08-016
Download: ML080920844 (6)


Text

April 1, 2008 MN No.08-016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 17, 2008 at 6:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose: To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2007 with the Nuclear Energy Advisory Council (NEAC).

Attendees:

NRC: R. Powell, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Benjamin, Resident Inspector J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman P. Rathbun E. Woollacott P. Blasioli M. DeBold G. Dixon M. Holloway R. Klancko J. Markowicz K. Ryan J. Sherrard E. Wilds

2Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion's performance at Millstone and the role of the agency in ensuring safe plant operations.

The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML080630630. The slides for the meeting can be located in ADAMS with Accession Number ML080880083. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Raymond J. Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 10, 2008, via telephone to the NRC meeting contact.

Approved by: _RA by A. Burritt Acting for/

__ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/ encl

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff 3cc w/ encl
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq. R. Rubinstein, Waterford Library 4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction

.......................................................................................................NRC (3 minutes) Review of Reactor Oversight Process................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Millstone Station Performance....................................................NRC (15 minutes)

NEAC's Response and Questions..................................................................NEAC (20 minutes)

Closing Remarks

................................................................................................NRC (5 minutes)

Short Break................................................................................................................(5 minutes) NRC to address public questions--------.......NRC/Members of the Public (as needed) 4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction

.......................................................................................................NRC (3 minutes) Review of Reactor Oversight Process................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Millstone Station Performance....................................................NRC (15 minutes)

NEAC's Response and Questions..................................................................NEAC (20 minutes)

Closing Remarks

................................................................................................NRC (5 minutes)

Short Break................................................................................................................(5 minutes) NRC to address public questions--------.......NRC/Members of the Public (as needed)

Distribution :

See next page

DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Notices\ROP 8 Annual Assessment\Pilgrim ROP 8 Annual Assessment Meeting Notice.doc SUNSI Review Complete: ALB (Reviewer's Initials) After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure

" E" = Copy with attachment/enclosure " N" = No copy ML080920844 OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/ALB FOR/ DATE 04/01/08 04/01/08 OFFICIAL RECORD COPY 5Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES) Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP) Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM) Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM) Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI) Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting) J. Lubinski, NRR J. Hughey NRR, PM J. Lamb, NRR, PM S. Shaffer, SRI J. Benjamin, RI J. Krafty, RI R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PAO J. Lubinski, NRR N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Regional Administrator Secretary, RI DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences) Region I Receptionist PMNS