MONTHYEARML23254A0562023-09-13013 September 2023 Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel ML22277A8412022-10-18018 October 2022 Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel ML22243A0322022-09-0707 September 2022 Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis ML22236A0602022-08-29029 August 2022 Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral ML22215A2872022-08-0909 August 2022 Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request ML22082A1482022-03-23023 March 2022 Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) ML21076A3322021-03-18018 March 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides ML20226A4112020-08-19019 August 2020 Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request ML20176A2762020-06-29029 June 2020 Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20143A0772020-05-26026 May 2020 Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request ML20111A0352020-04-20020 April 2020 Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML19143A4722019-06-0303 June 2019 Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request ML19128A4072019-05-0909 May 2019 Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request ML19063D9452019-03-0707 March 2019 Presentation Material for 3/07/19 Pre-Submittal Meeting License Amendment Request to Revise Technical Specification 3.8.1.1 ML19022A2432019-01-22022 January 2019 Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18310A1812018-11-0808 November 2018 Presentation Material for 11/08/18 Pre-Submittal Meeting 10 CFR 50.69 Risk Informed Approach License Amendment Request ML18108A2072018-04-10010 April 2018 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump ML17230A1282017-08-31031 August 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 ML17200C9572017-07-18018 July 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 ML16272A3462016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) ML16272A3472016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) ML16125A0092016-05-0303 May 2016 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request ML15353A0022015-12-17017 December 2015 /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 ML15344A2942015-12-10010 December 2015 /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 ML15314A1022015-10-20020 October 2015 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision ML15198A3432015-06-22022 June 2015 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly ML15155B3692015-05-21021 May 2015 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13305A1442013-10-31031 October 2013 Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides ML1014101592010-05-21021 May 2010 April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council ML0910506232009-04-23023 April 2009 NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides ML0909800642009-04-0808 April 2009 Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process ML0808800832008-03-28028 March 2008 Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0730502942007-11-0101 November 2007 TSTF Status Spreadsheet for 11-01-2007 Meeting ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0608300792006-03-24024 March 2006 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station ML0532501622005-11-22022 November 2005 Att. 4 Millstone Power Station Appeal Faq 55.2 ML0524300932005-08-18018 August 2005 Att. 6, FAQ Log ML0527701902005-08-16016 August 2005 Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear ML0515304782005-05-18018 May 2005 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 Event ML0507303932005-03-14014 March 2005 NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance ML0331604212003-11-21021 November 2003 Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs ML0309003222003-03-20020 March 2003 Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML0309003542003-03-20020 March 2003 Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-09-13
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24135A0812024-05-14014 May 2024 5/16/2024, Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML23254A0562023-09-13013 September 2023 Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel ML23073A0042023-03-14014 March 2023 Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides ML22277A8412022-10-18018 October 2022 Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel ML22243A0322022-09-0707 September 2022 Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis ML22236A0602022-08-29029 August 2022 Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral ML22215A2872022-08-0909 August 2022 Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request ML22082A1482022-03-23023 March 2022 Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) ML21076A3322021-03-18018 March 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides ML20226A4112020-08-19019 August 2020 Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request ML20176A2762020-06-29029 June 2020 Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20143A0772020-05-26026 May 2020 Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request ML19143A4722019-06-0303 June 2019 Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request ML19128A4072019-05-0909 May 2019 Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request ML19022A2432019-01-22022 January 2019 Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request ML18108A2072018-04-10010 April 2018 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17230A1282017-08-31031 August 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 ML17200C9572017-07-18018 July 2017 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 ML16272A3472016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) ML16272A3462016-08-10010 August 2016 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) ML16125A0092016-05-0303 May 2016 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request ML15353A0022015-12-17017 December 2015 /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 ML15344A2942015-12-10010 December 2015 /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 ML15314A1022015-10-20020 October 2015 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision ML15198A3432015-06-22022 June 2015 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly ML15155B3692015-05-21021 May 2015 Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13305A1442013-10-31031 October 2013 Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides IR 05000336/20110102011-08-0808 August 2011 EA-11-047, Millstone - Final Significance Determination for White Finding, W/Assessment Follow-up;Notice of Violation and Results of Regulatory Conference (NRC Special Inspection Report No. 05000336/2011010) ML1120005362011-07-19019 July 2011 EA-11-047, Millstone Regulatory Conference-July 19, 2011-Dominion Slides ML1120005282011-07-19019 July 2011 EA-11-047, Millstone Regulatory Conference-July 19, 2011 NRC Slides ML1118800642011-07-0707 July 2011 NRC Slides - Millstone/Neac Public Meeting on May 25, 2011 ML1118800332011-07-0707 July 2011 NRC Slides - Millstone 2011 Annual Assesssment Meeting ML1019505052010-07-13013 July 2010 MPS3 RAI 6 ML1014101592010-05-21021 May 2010 April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council ML1005009822010-02-17017 February 2010 Spent Fuel Pool Criticality Presentation for Feb 17 Public Meeting ML0910506232009-04-23023 April 2009 NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides ML0909800642009-04-0808 April 2009 Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process ML0911200622009-03-31031 March 2009 Post Exam Comment Miscellaneous References (Folder 1) ML0808801002008-04-0202 April 2008 Slides - NRC Annual Performance Assessment of Millstone, 2007 Reactor Oversight Process ML0808800832008-03-28028 March 2008 Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program ML0734708412007-12-11011 December 2007 Drop-In Visit from Dominion (Millstone) ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0707907302007-03-20020 March 2007 2006 NRC and Neac Public Meeting Slides to Discuss Millstone Station Annual Assessment Performance EOC 2006-07 ML0707907132007-03-20020 March 2007 2006 Millstone Annual Assessment Meeting Slides 2006-07 EOC ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0608300792006-03-24024 March 2006 NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station ML0608202022006-03-23023 March 2006 NRC Slides for Public Meeting with Dominion Nuclear (Millstone) to Discuss CY2005 Performance 2024-05-14
[Table view] |
Text
NRC & NEAC Meeting Concerning Millstone Station Performance 2007 Reactor Oversight Program
Purpose of Todays Meeting
- A public forum for discussion of Millstones Plant Performance for CY 2007
- NRC will address Millstones performance as discussed in the NRC Annual Assessment Letter to Dominion Nuclear Connecticut, Inc.
- NEAC will be given the opportunity to respond to the information, request clarifications, and ask additional questions, as needed 2
Agenda
- Review of Reactor Oversight Process (ROP)
- National Summary of Plant Performance
- Millstones Performance Results
- NEAC Response and Remarks
- NRC & NEAC Closing Remarks
- NRC available to address questions/comments 3
Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Marsha K. Gamberoni Director Division of Reactor Projects Director Division of Reactor Safety James W. Clifford Darrell J. Roberts Deputy Director Deputy Director Raymond J. Powell Regional Specialists Branch Chief Millstone Resident Inspectors Project Engineers Steve W. Shaffer - Senior RI Barry S. Norris - Senior PE Jamie C. Benjamin - RI Nicole S. Sieller - PE James A. Krafty - RI 4
NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials 5
Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Radiation Safeguards Safety Safety Public Occupational Initiating Mitigating Barrier Emergency Physical Radiation Radiation Events Systems Integrity Preparedness Protection Safety Safety 6
Reactor Oversight Process S tra te g ic P e rfo r m a n c e A re a s S a fety C o rn e r s to n e s B a s e lin e In s p e c tio n P e r fo r m a n c e In d ic a to r R e s u lts R e s u lts S ig n ific a n c e S ig n ific a n c e T h r e s h o ld T h r e s h o ld A c tio n M a tr ix R e g u la to ry R e s p o n s e 7
Typical Baseline Inspection Areas
- Radiological Environmental Monitoring
- Worker Radiation Protection
- Corrective Action Program
- Corrective Action Case Reviews 8
NRC Performance Indicators Initiating Events PIs
- Unplanned Scrams with Complications
- Emergency AC Power System
- High Pressure Injection System
- Cooling Water Support Systems
- Drill / Exercise Performance
- Emergency Response Organization Participation
- Alert and Notification System Radiation Protection PIs
- Occupational Exposure Control Effectiveness
- RETS / ODCM Radiological Effluent Security PIs are not Publicly Available 9
Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White Requires increased NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue 10
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone
- Increasing Safety Significance
- Increasing NRC Inspection Efforts
- Increasing NRC/Licensee Management Involvement
- Increasing Regulatory Actions 11
National Summary of Plant Performance (at end of 2007)
Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104 12
National Summary of Plant Performance (at end of 2007)
Performance Indicator Results 3/4 Green 1954 3/4 White 8 3/4 Yellow 2 3/4 Red 0 Total Inspection Findings 3/4 Green 918 3/4 White 9 3/4 Yellow 2 3/4 Red 0 13
Millstone Assessment Summary (CY 2007)
- No safety significant Findings or Performance Indicators
- All Green Performance Indicators
- 14 Green inspection findings 14
NRC Inspection Activities (January 1 - December 2007)
- Inspection and related activities
- 2703 hours0.0313 days <br />0.751 hours <br />0.00447 weeks <br />0.00103 months <br /> at Millstone Unit 2
- 3977 hours0.046 days <br />1.105 hours <br />0.00658 weeks <br />0.00151 months <br /> at Millstone Unit 3
- 3 resident inspectors assigned to site
- Units 2 & 3 - 3 team & 10 regional inspections
- Unit 2 only - 2 regional inspection
- Unit 3 only - 1 team & 5 regional inspections 15
NRC Inspection Activities (January 1 - December 2007)
- 4 findings of very low safety significance (Green) at Unit 2
- 9 findings of very low safety significance (Green) at Unit 3
- 1 finding of very low safety significance (Green) common to both units
- Unit 3 refueling outage (April 6 - May 18)
- 2 findings of very low safety significance (Green) 16
NRC Annual Assessment Summary
- Dominion operated Millstone safely and in a manner that preserved public health and safety and protected the environment
- All cornerstone objectives were fully met
- NRC plans baseline inspections at Millstone for the remainder of CY 2008 17
NRC Representatives
- James W. Clifford, Deputy Division Director, DRP 3/4 610-337-5080
- Raymond J. Powell, Branch Chief 3/4 610-337-6967
- Steve W. Shaffer, Senior Resident Inspector 3/4 860-447-3170
- Jamie C. Benjamin, Resident Inspector 3/4 860-447-3170
- James A. Krafty, Resident Inspector 3/4 860-447-3170
- Barry S. Norris, Senior Project Engineer 3/4 610-337-5111 18
Contacting the NRC
3/4 (301) 816-5100 (call collect)
3/4 (800) 695-7403 3/4 Allegation@nrc.gov
- General information or questions:
3/4 www.nrc.gov 3/4 Select News and Information for a link to email Public Affairs 19
Reference Sources 3/4 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html 3/4 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html 3/4 Public Document Room 1-800-397-4209 (Toll Free) 20
NEAC Response and Remarks Millstone Nuclear Power Station Unit & Unit 3 21
End of the Presentation Nuclear Regulatory Commission Region I King of Prussia, Pennsylvania April 17, 2008