Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program
ML080880083
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/28/2008
From: Norris B
NRC/RGN-I/DRP/PB5
To:
Powell R, RI/DRP/610-337-6967
References
Download: ML080880083 (22)


Text

NRC & NEAC Meeting Concerning Millstone Station Performance 2007 Reactor Oversight Program

2 Purpose of Todays Meeting

  • A public forum for discussion of Millstones Plant Performance for CY 2007
  • NRC will address Millstones performance as discussed in the NRC Annual Assessment Letter to Dominion Nuclear Connecticut, Inc.
  • NEAC will be given the opportunity to respond to the information, request clarifications, and ask additional questions, as needed

3 Agenda

  • Introduction
  • Review of Reactor Oversight Process (ROP)
  • National Summary of Plant Performance
  • Millstones Performance Results
  • NEAC Response and Remarks
  • NRC & NEAC Closing Remarks
  • Break
  • NRC available to address questions/comments

4 Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director Marsha K. Gamberoni Director Division of Reactor Safety Darrell J. Roberts Deputy Director Regional Specialists Raymond J. Powell Branch Chief Project Engineers Barry S. Norris - Senior PE Nicole S. Sieller - PE Millstone Resident Inspectors Steve W. Shaffer - Senior RI Jamie C. Benjamin - RI James A. Krafty - RI

5 NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials

6 Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Safety Radiation Safety Safeguards Initiating Events Mitigating Systems Barrier Integrity Emergency Preparedness Occupational Radiation Safety Public Radiation Safety Physical Protection

7 Reactor Oversight Process S afety C o rnerstones B aseline In sp ectio n R esu lts S ig nificance Threshold Actio n M atrix S ig nificance Threshold P erform an ce Indicator R esu lts R egulato ry R espo nse S trategic P erform ance Areas S afety C o rnerstones B aseline In sp ectio n R esu lts S ig nificance Threshold Actio n M atrix S ig nificance Threshold P erform an ce Indicator R esu lts R egulato ry R espo nse S trategic P erform ance Areas

8 Typical Baseline Inspection Areas

  • Equipment Alignment
  • Maintenance
  • Fire Protection
  • Operator Response
  • Radiological Environmental Monitoring
  • Worker Radiation Protection
  • Corrective Action Program
  • Corrective Action Case Reviews

9 NRC Performance Indicators Initiating Events PIs Unplanned Scrams Unplanned Scrams with Complications Unplanned Power Changes Mitigating Systems PIs Emergency AC Power System High Pressure Injection System Residual Heat Removal System Cooling Water Support Systems Safety System Functional Failures Barrier Integrity PIs Reactor Coolant System Specific Activity Reactor Coolant System Leakage Emergency Planning PIs Drill / Exercise Performance Emergency Response Organization Participation Alert and Notification System Radiation Protection PIs Occupational Exposure Control Effectiveness RETS / ODCM Radiological Effluent Security PIs are not Publicly Available

10 Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White Requires increased NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue

11 Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance

  • Increasing Safety Significance
  • Increasing NRC Inspection Efforts
  • Increasing NRC/Licensee Management Involvement
  • Increasing Regulatory Actions

12 National Summary of Plant Performance (at end of 2007)

Licensee Response 87 Regulatory Response 8

Degraded Cornerstone 8

Multiple/Repetitive Degraded Cornerstone 1

Unacceptable 0

Total 104

13 National Summary of Plant Performance (at end of 2007)

Performance Indicator Results 3/4 Green 1954 3/4 White 8

3/4 Yellow 2

3/4 Red 0

Total Inspection Findings 3/4 Green 918 3/4 White 9

3/4 Yellow 2

3/4 Red 0

14 Millstone Assessment Summary (CY 2007)

  • Licensee Response Column
  • No safety significant Findings or Performance Indicators

- All Green Performance Indicators

- 14 Green inspection findings

15 NRC Inspection Activities (January 1 - December 2007)

  • Inspection and related activities

- 2703 hours0.0313 days <br />0.751 hours <br />0.00447 weeks <br />0.00103 months <br /> at Millstone Unit 2

- 3977 hours0.046 days <br />1.105 hours <br />0.00658 weeks <br />0.00151 months <br /> at Millstone Unit 3

  • 3 resident inspectors assigned to site
  • Inspections

- Units 2 & 3 - 3 team & 10 regional inspections

- Unit 2 only - 2 regional inspection

- Unit 3 only - 1 team & 5 regional inspections

16 NRC Inspection Activities (January 1 - December 2007)

  • Inspection Findings

- 4 findings of very low safety significance (Green) at Unit 2

- 9 findings of very low safety significance (Green) at Unit 3

- 1 finding of very low safety significance (Green) common to both units

  • Unit 3 refueling outage (April 6 - May 18)

- 2 findings of very low safety significance (Green)

17 NRC Annual Assessment Summary

  • Dominion operated Millstone safely and in a manner that preserved public health and safety and protected the environment
  • All cornerstone objectives were fully met
  • NRC plans baseline inspections at Millstone for the remainder of CY 2008

18 NRC Representatives

  • James W. Clifford, Deputy Division Director, DRP 3/4 610-337-5080
  • Raymond J. Powell, Branch Chief 3/4 610-337-6967
  • Steve W. Shaffer, Senior Resident Inspector 3/4 860-447-3170
  • Jamie C. Benjamin, Resident Inspector 3/4 860-447-3170
  • James A. Krafty, Resident Inspector 3/4 860-447-3170
  • Barry S. Norris, Senior Project Engineer 3/4 610-337-5111

19 Contacting the NRC

  • Report an emergency:

3/4(301) 816-5100 (call collect)

  • Report a safety concern:

3/4(800) 695-7403 3/4Allegation@nrc.gov

  • General information or questions:

3/4www.nrc.gov 3/4Select News and Information for a link to email Public Affairs

20 Reference Sources 3/4 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html 3/4 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html 3/4 Public Document Room 1-800-397-4209 (Toll Free)

21 NEAC Response and Remarks Millstone Nuclear Power Station Unit & Unit 3

End of the Presentation Nuclear Regulatory Commission Region I King of Prussia, Pennsylvania April 17, 2008