{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 17, 2008 MN No. 08-010 MEETING
 
==SUMMARY==
 
LICENSEE: ENTERGY NUCLEAR NORTHEAST
 
FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT
 
==SUBJECT:==
 
==SUMMARY==
OF APRIL 8, 2008, ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR NORTHEAST On April 8, 2008, at 2:00 p.m., an Annual Assessment Meeting was conducted at the Joint News Center located at the Oswego County Airport, Fulton, NY, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Northeast (Entergy). The NRC requested this meeting to discuss the NRC's annual assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick), for the calendar year 2007.
The NRC presented and discussed its assessment of the safety performance of FitzPatrick for the period between January 1 through December 31, 2007. The NRC presentation included a discussion of the Reactor Oversight Process (ROP), an overview of national ROP results, and the results of the NRC's performance assessment for FitzPatrick. As part of this meeting, Entergy presented its perspective regarding performance at FitzPatrick and initiatives in selected areas. Members of the public observed the meeting and were offered the opportunity to communicate with the NRC regarding Entergy's performance at FitzPatrick and the role of the agency in ensuring safe plant operations. 
 
At the end of the meeting, the NRC answered questions from members of the public. NRC's assessment letter can be found in ADAMS with an Accession Number of ML080630118.
The meeting notice with the agenda can be found with Accession Number ML080780025. The NRC slides of the meeting can be found with Accession Number ML08060090. Entergy's slides for the meeting can be found with Accession Number ML08060103. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.          Sincerely,                    /RA/                Eugene W. Cobey, Chief        Projects Branch 2        Division of Reactor Projects
 
==Enclosure:==
Meeting Attendees 2  NRC Attendees:  G. Hunegs, Senior Resident Inspector    S. Rutenkroger, Resident Inspector
 
Entergy Attendees:  P. Dietrich, Site Vice President    K. Mulligan, General Manager of Plant Operations    S. Bono, Director of Engineering    B. Finn, Director of Nuclear Safety Assurance T. Dietrich, Entergy    C. Coreinella, Entergy    J. Costedio, Entergy    G. Dorman, Entergy State/Local Government Attendees:
 
None. Public Attendees:
 
Tom Gurdziel                                Citizen Charles McChesry                        Post-Standard
 
2NRC Attendees:  G. Hunegs, Senior Resident Inspector    S. Rutenkroger, Resident Inspector Entergy Attendees:  P. Dietrich, Site Vice President    K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering    B. Finn, Director of Nuclear Safety Assurance    T. Dietrich, Entergy    C. Coreinella, Entergy    J. Costedio, Entergy G. Dorman, Entergy State/Local Government Attendees:
None.
Public Attendees:
Tom Gurdziel                                Citizen Charles McChesry                        Post-Standard
 
Distribution
: S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP G. West, RI OEDO  J. Lubinski, NRR E. Cobey, DRP D. Jackson, DRP B. Bickett, DRP S. McCarver, DRP T. Wingfield, DRP S. Williams, RI OEDO (Acting) J. Boska, PM NRR J. Hughey, NRR G. Hunegs, DRP, Senior Resident Inspector S. Rutenkroger, DRP, Resident Inspector K. Kolek, Resident OA SUNSI Review Complete:            SCM                (Reviewer
=s Initials) DOCUMENT NAME:  G:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\Fitz\FITZ MEETING
 
==SUMMARY==
rev1.doc  After declaring this document AAn Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box: 
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy                                                                                                          ML08109135 OFFICE  RI/DRP    RI/DRP                NAME  SMcCarver/SCM ECobey/EWC
 
DATE  04/17/08  04/17/08 OFFICIAL RECORD COPY}}

Revision as of 15:42, 20 September 2018

04/08/2008 - Summary of Annual Assessment Meeting with Entergy Nuclear Northeast to Discuss Safety Performance of the James A. FitzPatrick Nuclear Power Plant for Cy 2007
ML081090135
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/17/2008
From: Cobey E W
Reactor Projects Branch 2
To:
Cobey E
References
MN 08-010
Download: ML081090135 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 April 17, 2008 MN No.08-010 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR NORTHEAST

FACILITY: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF APRIL 8, 2008, ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR NORTHEAST On April 8, 2008, at 2:00 p.m., an Annual Assessment Meeting was conducted at the Joint News Center located at the Oswego County Airport, Fulton, NY, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Northeast (Entergy). The NRC requested this meeting to discuss the NRC's annual assessment of the safety performance of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick), for the calendar year 2007.

The NRC presented and discussed its assessment of the safety performance of FitzPatrick for the period between January 1 through December 31, 2007. The NRC presentation included a discussion of the Reactor Oversight Process (ROP), an overview of national ROP results, and the results of the NRC's performance assessment for FitzPatrick. As part of this meeting, Entergy presented its perspective regarding performance at FitzPatrick and initiatives in selected areas. Members of the public observed the meeting and were offered the opportunity to communicate with the NRC regarding Entergy's performance at FitzPatrick and the role of the agency in ensuring safe plant operations.

At the end of the meeting, the NRC answered questions from members of the public. NRC's assessment letter can be found in ADAMS with an Accession Number of ML080630118.

The meeting notice with the agenda can be found with Accession Number ML080780025. The NRC slides of the meeting can be found with Accession Number ML08060090. Entergy's slides for the meeting can be found with Accession Number ML08060103. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, /RA/ Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects

Enclosure:

Meeting Attendees 2 NRC Attendees: G. Hunegs, Senior Resident Inspector S. Rutenkroger, Resident Inspector

Entergy Attendees: P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering B. Finn, Director of Nuclear Safety Assurance T. Dietrich, Entergy C. Coreinella, Entergy J. Costedio, Entergy G. Dorman, Entergy State/Local Government Attendees:

None. Public Attendees:

Tom Gurdziel Citizen Charles McChesry Post-Standard

2NRC Attendees: G. Hunegs, Senior Resident Inspector S. Rutenkroger, Resident Inspector Entergy Attendees: P. Dietrich, Site Vice President K. Mulligan, General Manager of Plant Operations S. Bono, Director of Engineering B. Finn, Director of Nuclear Safety Assurance T. Dietrich, Entergy C. Coreinella, Entergy J. Costedio, Entergy G. Dorman, Entergy State/Local Government Attendees:

None.

Public Attendees:

Tom Gurdziel Citizen Charles McChesry Post-Standard

Distribution

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP G. West, RI OEDO J. Lubinski, NRR E. Cobey, DRP D. Jackson, DRP B. Bickett, DRP S. McCarver, DRP T. Wingfield, DRP S. Williams, RI OEDO (Acting) J. Boska, PM NRR J. Hughey, NRR G. Hunegs, DRP, Senior Resident Inspector S. Rutenkroger, DRP, Resident Inspector K. Kolek, Resident OA SUNSI Review Complete: SCM (Reviewer

=s Initials) DOCUMENT NAME: G:\DRP\BRANCH2\Meetings\2008 Annual Assessment Meetings\Fitz\FITZ MEETING

SUMMARY

rev1.doc After declaring this document AAn Official Agency Record

@ it will be released to the Public. To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ML08109135 OFFICE RI/DRP RI/DRP NAME SMcCarver/SCM ECobey/EWC

DATE 04/17/08 04/17/08 OFFICIAL RECORD COPY