ML17311A518: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:
  NUCLEAR REGULATORY COMMISSION
  NUCLEAR REGULATORY COMMISSION
  REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX
  REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX
   76011-4511November  
   76011-4511November 1, 201 7 Adam C. Heflin, President, Chief Executive Officer, and Chief Nuclear Officer
1, 2017 Adam C. Heflin, President, Chief Executive Officer,
  and Chief Nuclear Officer
  Wolf Creek Nuclear Operating Corporation
  Wolf Creek Nuclear Operating Corporation
  P.O. Box 411
  P.O. Box 411
Line 35: Line 33:
  Generating Station, from January 22 - 26, 2018.  The inspection will consist of three reactor inspectors from the NRC
  Generating Station, from January 22 - 26, 2018.  The inspection will consist of three reactor inspectors from the NRC
's Region IV office, plus one of the assigned Resident Inspectors at the Wolf Creek Generating Station
's Region IV office, plus one of the assigned Resident Inspectors at the Wolf Creek Generating Station
  for one week.  The inspection will be conducted in accordance with the NRC's Temporary Instruction 2515/191
  for one week.  The inspection will be conducted in accordance with the NRC's Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness  
, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness  
Communication/Staffing/Multi
Communication/Staffing/Multi
-Unit Dose Assessment Plans." Experience has shown that this inspection is resource intensive both for the NRC inspectors  
-Unit Dose Assessment Plans." Experience has shown that this inspection is resource intensive both for the NRC inspectors  
and licensee staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection
and licensee staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection
  activity.  Please note that the documents are requested to be provided by
  activity.  Please note that the documents are requested to be provided by
  January 5, 2018
  January 5, 2018.  During the onsite inspection, inspectors will verify that plans for complying with NRC Orders  
.  During the onsite inspection, inspectors will verify that plans for complying with NRC Orders  
EA-12-049 and EA
EA-12-049 and EA
-12-051 are in place and are being implemented.  Inspectors will also verify the establishment of staffing and communications plans provided in response to the March 12, 2012, request for information letter, and multi
-12-051 are in place and are being implemented.  Inspectors will also verify the establishment of staffing and communications plans provided in response to the March 12, 2012, request for information letter, and multi-unit dose assessment information provided per COMSECY
-unit dose assessment information provided per COMSECY
-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013.  These plans and information were provided in the site specific submittals, which were subsequently reviewed by the NRC staff for understanding and
-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013.  These plans and information were provided in the site specific submittals, which were subsequently reviewed by the NRC staff for understanding and
  documented in the NRC's plant safety evaluations (SEs) and safety assessments.
  documented in the NRC's plant safety evaluations (SEs) and safety assessments.
   Therefore,
   Therefore, appropriate personnel knowledgeable of
appropriate personnel knowledgeable of
  the station's FLEX strategies, spent fuel pool instrumentation, and emergency preparedness enhancements
  the station's FLEX strategies, spent fuel pool instrumentation, and emergency preparedness enhancements
  should be available to support the inspector
  should be available to support the inspector
s at the site during the inspection.
s at the site during the inspection.
    
    
A. Heflin
A. Heflin 2 We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be
2 We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be
  Nicole Good
  Nicole Good
  of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector,
  of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, Ryan D. Alexander, by telephone  
Ryan D. Alexander,
by telephone  
at (817) 200-1195 or by e-mail at ryan.alexander@nrc.gov.  
at (817) 200-1195 or by e-mail at ryan.alexander@nrc.gov.  
  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
requirements were approved by the Office of Management and Budget, control number 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control  
requirements were approved by the Office of Management and Budget, control number 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control  
number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document  
number. I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRC
Room or from the Publicly Available Records (PARS) component of NRC
's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
-rm/adams.html
  (the Public Electronic Reading Room).
  (the Public Electronic Reading Room).
  Sincerely,
  Sincerely, /RA/ Nicholas H. Taylor, Chief Project Branch B
/RA/ Nicholas H. Taylor, Chief Project Branch B
  Division of Reactor Projects Docket:  50
  Division of Reactor Projects Docket:  50
-482 License:  NPF
-482 License:  NPF
Line 76: Line 66:
  Request for Information
  Request for Information
    
    
1 Enclosure
1 Enclosure Request for Information
Request for Information
  FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements
  FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements
  Inspection
  Inspection
Line 84: Line 73:
  Inspection Report:   
  Inspection Report:   
  05000482/2018008 Inspection Dates:
  05000482/2018008 Inspection Dates:
  January 22 - 26, 2018 Inspection Procedure:
  January 22 - 26, 2018 I nspection Procedure:
  Temporary Instruction 2515/191
  Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi
, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans"
-Unit Dose Assessment Plans"
  Inspectors: Ryan D. Alexander, Team Lead, Sr. Project Engineer, Region IV
  Inspectors: Ryan D. Alexander, Team Lead, Sr. Project Engineer, Region IV
  Doug Dodson, Sr. Resident Inspector, Wolf Creek
  Doug Dodson, Sr. Resident Inspector, Wolf Creek
  Michael Stafford
  Michael Stafford , Resident Inspector, Cooper Station
, Resident Inspector, Cooper Station
  Inspector TBD, Region IV
  Inspector TBD, Region IV
  Information Requested for the In
  Information Requested for the In
Line 105: Line 92:
  A. Provide current revision of the FLEX Final Integrated Plan
  A. Provide current revision of the FLEX Final Integrated Plan
  (i.e., current FLEX Program Document), including any revisions since January 2017
  (i.e., current FLEX Program Document), including any revisions since January 2017
  submission to the NRC
  submission to the NRC. B. Provide the FLEX Strategy Basis Document.
. B. Provide the FLEX Strategy Basis Document.
  C. Provide each operating, off
  C. Provide each operating, off
-normal, abnormal, and/or emergency procedures where entry into one or more
-normal, abnormal, and/or emergency procedures where entry into one or more
  FLEX Support Guideline(s) are initiated. D. Provide a list and copies
  FLEX Support Guideline(s) are initiated. D. Provide a list and copies
  of every FLEX Support Guideline
  of every FLEX Support Guideline
s (FSGs) or equivalent procedures which you developed or revised to implement your mitigating strategies.  
s (FSG s) or equivalent procedures which you developed or revised to implement your mitigating strategies.  
E. Provide a list of key piece
E. Provide a list of key piece
s of equipment that directly perform a FLEX mitigation strategy for core cooling (RCS and Steam Generators), containment, and/or spent fuel pool
s of equipment that directly perform a FLEX mitigation strategy for core cooling (RCS and Steam Generators), containment, and/or spent fuel pool
Line 171: Line 157:
during the onsite inspection week.
during the onsite inspection week.
  K. Provide documents/procedures
  K. Provide documents/procedures
  which describe the programmatic controls in place to ensure that if equipment and applicable connections are unavailable (e.g., due to maintenance
  which describe the programmatic controls in place to ensure that if equipment and applicable connections are unavailable (e.g., due to maintenance , non-functionality), then compensatory measures are implemented in accordance with guidance outlined NEI 12
, non-functionality), then compensatory measures are implemented in accordance with guidance outlined NEI 12
-06. L. Provide the station
-06. L. Provide the station
-specific National SAFER Center "Playbook"
-specific National SAFER Center "Playbook"
Line 181: Line 166:
during the onsite inspection week.]
during the onsite inspection week.]
  3) Lesson plans/training documents
  3) Lesson plans/training documents
  for site personnel responsible for the execution of mitigating strategies for BDBEEs (i.e.,
  for site personnel responsible for the execution of mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation protection, etc.). NOTE - Records for staff completing these
operators, craft personnel, security, radiation protection, etc.). NOTE - Records for staff completing these
  training activities
  training activities
  may be requested for review during the onsite inspection week.
  may be requested for review during the onsite inspection week.
  N. A current copy of administrative procedure(s) for the CAP, modification program, operations procedure writing and implementation, and top
  N. A current copy of administrative procedure(s) for the CAP, modification program, operations procedure writing and implementation, and top-level documents for the work control and work scheduling programs.  
-level documents for the work control and work scheduling programs.  
(If FLEX related procedures such as FSGs or the FIP are maintained under a different process
(If FLEX related procedures such as FSGs or the FIP are maintained under a different process
, please include copies of those
, please include copies of those
Line 200: Line 183:
  TI 2515/191  
  TI 2515/191  
- Appendix B
- Appendix B
  R. Provide the procedures implemented for maintenance, testing, calibration, and use of the primary and backup Spent Fuel Pool (SFP)
  R. Provide the procedures implemented for maintenance, testing, calibration, and use of the primary and backup Spent Fuel Pool (SFP) instrumentation channels.
instrumentation channels.
  S. Provide lesson plans/training documents which describe the training program that address the use, maintenance, calibration, surveillance, and the use of alternate power to the primary and backup SFP instrument channels.
  S. Provide lesson plans/training documents which describe the training program that address the use, maintenance, calibration, surveillance, and the use of alternate power to the primary and backup SFP instrument channels.
  TI 2515/191  
  TI 2515/191  
Line 216: Line 198:
  V. Provide documents and procedures which show that your dose assessment
  V. Provide documents and procedures which show that your dose assessment
  process/program
  process/program
  is capable of analyzing concurrent radiological releases from all on-site significant sources, including
  is capable of analyzing concurrent radiological releases from all on-site significant sources, including releases from spent fuel pools (i.e., multi
releases from spent fuel pools (i.e., multi
-unit/multi
-unit/multi
-source dose assessment capability)
-source dose assessment capability)
Line 224: Line 205:
, Sr. Project Engineer
, Sr. Project Engineer
  Mailing Address
  Mailing Address
: 817-200-1195 U.S. NRC, Region IV
: 817-200-11 95 U.S. NRC, Region IV
  Ryan.Alexander@nrc.gov
  Ryan.Alexander@nrc.gov
  Attn:  Ryan Alexander, DRP
  Attn:  Ryan Alexander, DRP
Line 232: Line 213:


   SUNSI Review By:  RDA/dll ADAMS:    Yes      No  Sensitive   
   SUNSI Review By:  RDA/dll ADAMS:    Yes      No  Sensitive   
   Non-Sensitive
   Non-Sensitive Non-Publicly Available  Publicly Available
  Non-Publicly Available  Publicly Available
  Keyword NRC-002 OFFICE DRP/RPBA C:DRP/RPB B NAME RAlexander
  Keyword NRC-002 OFFICE DRP/RPBA C:DRP/RPB
  NTaylor SIGNATURE /RA/-E /RA/ DATE 11/01/2017 11/1/2017
B NAME RAlexander
  NTaylor SIGNATURE
/RA/-E /RA/ DATE 11/01/2017 11/1/2017
}}
}}

Revision as of 09:41, 6 July 2018

Wolf Creek Generating Station-Notification of NRC Inspection of Implementation of Mitigation Strategies Assessment Plans (05000482/2018008) and Request for Information
ML17311A518
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/01/2017
From: Taylor N H
NRC/RGN-IV/DRP/RPB-B
To: Heflin A C
Wolf Creek
R ALEXANDER
References
IR 2018008
Download: ML17311A518 (7)


See also: IR 05000482/2018008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX

76011-4511November 1, 201 7 Adam C. Heflin, President, Chief Executive Officer, and Chief Nuclear Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF NRC INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES

AND SPENT FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY

PREPAREDNESS COMMUNICATION/

STAFFING/MULTI

-UNIT DOSE ASSESSMENT PLANS (05000482/2018008) AND REQUEST FOR INFORMATION

Dear Mr. Heflin: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a mitigation strategies for beyond

-design-basis external events, spent fuel pool instrumentation, and emergency preparedness enhancements inspection at the Wolf Creek

Generating Station, from January 22 - 26, 2018. The inspection will consist of three reactor inspectors from the NRC

's Region IV office, plus one of the assigned Resident Inspectors at the Wolf Creek Generating Station

for one week. The inspection will be conducted in accordance with the NRC's Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness

Communication/Staffing/Multi

-Unit Dose Assessment Plans." Experience has shown that this inspection is resource intensive both for the NRC inspectors

and licensee staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection

activity. Please note that the documents are requested to be provided by

January 5, 2018. During the onsite inspection, inspectors will verify that plans for complying with NRC Orders

EA-12-049 and EA

-12-051 are in place and are being implemented. Inspectors will also verify the establishment of staffing and communications plans provided in response to the March 12, 2012, request for information letter, and multi-unit dose assessment information provided per COMSECY

-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and information were provided in the site specific submittals, which were subsequently reviewed by the NRC staff for understanding and

documented in the NRC's plant safety evaluations (SEs) and safety assessments.

Therefore, appropriate personnel knowledgeable of

the station's FLEX strategies, spent fuel pool instrumentation, and emergency preparedness enhancements

should be available to support the inspector

s at the site during the inspection.

A. Heflin 2 We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be

Nicole Good

of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Ryan D. Alexander, by telephone

at (817) 200-1195 or by e-mail at ryan.alexander@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control

number. I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC

's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA/ Nicholas H. Taylor, Chief Project Branch B

Division of Reactor Projects Docket: 50

-482 License: NPF

-42 Enclosure: FLEX Strategies, Spent Fuel Pool

Instrumentation, & EP Enhancements Inspection

Request for Information

1 Enclosure Request for Information

FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements

Inspection

Wolf Creek

Generating Station

Inspection Report: 05000482/2018008 Inspection Dates:

January 22 - 26, 2018 I nspection Procedure:

Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans"

Inspectors: Ryan D. Alexander, Team Lead, Sr. Project Engineer, Region IV

Doug Dodson, Sr. Resident Inspector, Wolf Creek

Michael Stafford , Resident Inspector, Cooper Station

Inspector TBD, Region IV

Information Requested for the In

-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format (use of the Certrec IMS information portal is preferred), to the attention

of Ryan Alexander, by January 5, 2017. The inspectors

will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible.

If requested documents are large and only hard copy formats are available, please inform the

lead inspector, and provide

subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as

soon as possible.

TI 2515/191 - Appendix A

A. Provide current revision of the FLEX Final Integrated Plan

(i.e., current FLEX Program Document), including any revisions since January 2017

submission to the NRC. B. Provide the FLEX Strategy Basis Document.

C. Provide each operating, off

-normal, abnormal, and/or emergency procedures where entry into one or more

FLEX Support Guideline(s) are initiated. D. Provide a list and copies

of every FLEX Support Guideline

s (FSG s) or equivalent procedures which you developed or revised to implement your mitigating strategies.

E. Provide a list of key piece

s of equipment that directly perform a FLEX mitigation strategy for core cooling (RCS and Steam Generators), containment, and/or spent fuel pool

cooling. F. Provide a listing/summaries

of plant modifications completed related to the FLEX program.

G. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX program

and modifications.

2 H. Applicable site specific hazards for the Wolf Creek

Generating Station: 1) Provide documents which show the locations and configuration of structure(s) which store FLEX equipment

. 2) Seismic (a) Provide the travel route(s) for FLEX equipment from storage location(s) to their location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil liquefaction is not of a concern for these travel route(s).

(b) Seismic concerns for water source(s)

(1) If the FLEX water sources are seismically robust, then provide the assessment that shows that they are.

(2) If the FLEX water sources are not seismically robust, then provide:

(a) an assessment of alternate water sources, and

(b) the procedure(s) which describe when and how to access those sources.

3) External Flooding

(a) Provide description of where FLEX equipment is stored relative to protection from flood waters in accordance with site flood analysis.

(1) If any FLEX equipment is stored below flood level, then (i) on an event timeline, show when that equipment will be needed; and (ii) provide the procedure(s) used to retrieve and deploy that equipment.

(b) Provide your plans/procedures

to support successful FLEX

equipment deployment for floodi

ng/ponding from localized intense precipitation (which persist over a long time period

). (c) If credited in the strategy, provide plans/procedures for storage and deployment of

temporary flood barriers, including timeline of deployment strategy.

4) Severe storms with high winds

(a) Provide evaluation/evidence as to how FLEX equipment is stored relative to protection from severe storms with high winds

(including tornadic

): (1) In a structure that meets the plant's design basis for high wind hazards (e.g., existing safety-related structure); OR

(2) In a structure that meets the design requirements as described in ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures," given the limiting tornado wind speeds

from Regulatory Guide 1.76, and/or design

-basis hurricane wind speeds.

(b) Provide pathways via which you plan to move FLEX equipment from onsite storage

areas to final deployment locations.

(1) Show how you designated and evaluated those pathways for post

-storm accessibility for staging and connecting FLEX equipment.

5) Snow, Ice, and Extreme Cold

For each key piece of equipment described in Item

E (above) that directly performs or implements a FLEX mitigation strategy:

3 (a) Provide procedures/documents

demonstrating that the FLEX equipment is maintained at a temperature within a range to ensure that it will function when called

upon. (b) Provide procedures/documents

demonstrating how the FLEX equipment can be moved from the storage location to its deployment location during extreme snowfall and ice storms.

6) Extreme high temperatures

For each key piece of equipment described in Item

E (above) that directly performs or implements a FLEX mitigation strategy

(a) Provide procedures/documents

which describes the high-temperature limit of the range within which the equipment will function.

(b) Provide procedures/documents

which describe how the equipment is maintained below that limit in its storage location.

I. Provide the station

-specific FLEX strategies time validation

study(ies)

. J. Provide the relevant station procedure(s)/guideline(s) which describe

the testing and maintenance program for FLEX equipment.

As applicable, provide a listing of the model work orders established to conduct period testing and maintenance activities for FLEX equipment.

NOTE - A sample of records for completed maintenance/testing activities

will be requested for review

during the onsite inspection week.

K. Provide documents/procedures

which describe the programmatic controls in place to ensure that if equipment and applicable connections are unavailable (e.g., due to maintenance , non-functionality), then compensatory measures are implemented in accordance with guidance outlined NEI 12

-06. L. Provide the station

-specific National SAFER Center "Playbook"

M. Relative to personnel training on FLEX strategies, provide:

1) FLEX training bases document(s)

2) Lesson plans/training documents

for site emergency response leaders responsible for the implementation of FLEX strategies. [Records for staff completing this training may be requested for review

during the onsite inspection week.]

3) Lesson plans/training documents

for site personnel responsible for the execution of mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation protection, etc.). NOTE - Records for staff completing these

training activities

may be requested for review during the onsite inspection week.

N. A current copy of administrative procedure(s) for the CAP, modification program, operations procedure writing and implementation, and top-level documents for the work control and work scheduling programs.

(If FLEX related procedures such as FSGs or the FIP are maintained under a different process

, please include copies of those

procedures.

) O. A current copy of the U/FSAR, Technical Specifications, and Technical Specification Bases documents.

P. Listing of corrective action program document summaries generated related to FLEX

equipment, strategies, procedures, and/or training.

4 NOTE - Complete corrective action program documents for a selection of those included in the summary will be requested for review

during the onsite inspection week.

Q. A copy of any audits/se

lf-assessments related to your preparation for this inspection, as well as any related to the implementation or maintenance of the FLEX program.

TI 2515/191

- Appendix B

R. Provide the procedures implemented for maintenance, testing, calibration, and use of the primary and backup Spent Fuel Pool (SFP) instrumentation channels.

S. Provide lesson plans/training documents which describe the training program that address the use, maintenance, calibration, surveillance, and the use of alternate power to the primary and backup SFP instrument channels.

TI 2515/191

- Appendix C

T. Communications:

1) Provide documents which show that the communications system(s), technologies, equipment and power supplies would be available from the beginning of the event and operate during an ELAP. 2) Provide the procedures and/or guidance used to implement the communication capabilities

. 3) Provide documents which show that you have added any new communications equipment, portable power supplies and/or systems have been added to ongoing testing

and preventative maintenance programs.

U. Staffing: 1) Provide documents which show that onsite and augmented staff will be available to implement the strategies

in response to a large scale natural event that results an ELAP and impedes access to the site, and that functions/tasks have been appropriately staffed. 2) Provide documents which show that the site access methods (e.g., roadways, navigable bodies of water and dockage, airlift, etc.) expected to be available

following the event and available to the Emergency Response Organization (ERO) [as described in the Phase 1 and 2 staffing assessments and NRC safety assessment].

3) Provide documents which show the testing, training, and drills/exercises performed by the station

to demonstrate the ERO's ability to utilize the communications systems and/or equipment.

V. Provide documents and procedures which show that your dose assessment

process/program

is capable of analyzing concurrent radiological releases from all on-site significant sources, including releases from spent fuel pools (i.e., multi

-unit/multi

-source dose assessment capability)

. Lead Inspector Contact Information:

Ryan D. Alexander

, Sr. Project Engineer

Mailing Address

817-200-11 95 U.S. NRC, Region IV

Ryan.Alexander@nrc.gov

Attn: Ryan Alexander, DRP

1600 East Lamar Blvd.

Arlington, TX 76011

-4511

SUNSI Review By: RDA/dll ADAMS: Yes No Sensitive

Non-Sensitive Non-Publicly Available Publicly Available

Keyword NRC-002 OFFICE DRP/RPBA C:DRP/RPB B NAME RAlexander

NTaylor SIGNATURE /RA/-E /RA/ DATE 11/01/2017 11/1/2017